Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.2 LAdmitted-Finance | ₹7.2 L | L1 | Admitted-Finance |
| 2 | L2₹7.3 L+₹12,858.48 (1.79%)Admitted-Finance | ₹7.3 L+₹12,858.48 (1.79%) | L2 | Admitted-Finance |
| 3 | L3₹8.5 L+₹1.3 L (18.4%)Admitted-Finance | ₹8.5 L+₹1.3 L (18.4%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | The Chinder Sihag Co-Op L&C Society Ltd. L1 | MOHIT KUMAR CONTRACTOR L2 | R3 Infra Developers Private Limited L3 |
|---|---|---|---|---|---|---|
| 1.00 | [10.14]Providing a floating coat of 1.50 mm thick neat cement laid in one operation to the topping. [Through Rate] | 218.06 | Sqm | 26.07 ₹5,684.82 Lowest | 27 ₹5,887.62 | 30.5 ₹6,650.83 |
| 2.00 | [11.79.1]Painting with oil type wood preservative of approved brand and manufacture : 1. New work (two or more coats) [Through Rate] | 100.82 | Sqm | 18.9 ₹1,905.5 Lowest | 19 ₹1,915.58 | 22 ₹2,218.04 |
| 3.00 | [11.9.1]15 mm cement plaster on rough side of single or half brick wall of mix: 1. 1:4 (1 cement: 4 coarse sand) [Through Rate] | 218.06 | Sqm | 125 ₹27,257.5 Lowest | 127 ₹27,693.62 | 146 ₹31,836.76 |
| 4.00 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate] | 2,445 | Kg. | 74.6 ₹1,82,397 Lowest | 76 ₹1,85,820 | 87 ₹2,12,715 |
| 5.00 | [15.1.2.3]Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per clause 304 of MORTandH specifications
Ordinary soil 2.3. Mechanical Means
Depth above 6m [Through Rate] | 276.95 | cum | 98.9 ₹27,390.36 Lowest | 101 ₹27,971.95 | 116 ₹32,126.2 |
| 6.00 | [15.11.2.1]Plain/Reinforced Cement Concrete, in Well Foundations complete as per Drawing and Technical Specification, in Well Curb MORTandH clause 1200, 1500 and 1700 2.1. RCC M25 Grade
Using Concrete Mixer [Through Rate] | 5.61 | cum | 4,610.5 ₹25,864.91 Lowest | 4,693 ₹26,327.73 | 5,385 ₹30,209.85 |
| 7.00 | [15.6.3]Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications MORTandH clause 1300 3. Cement Mortar1:4 (1cement :4 sand) [Through Rate] | 55.9 | cum | 3,192 ₹1,78,432.8 Lowest | 3,249 ₹1,81,619.1 | 3,730 ₹2,08,507 |
| 8.00 | [20.114.2]Supplying erection, testing of fully
automatic electric control panel board for
T/Wells in Pump Chamber consisting of
MS sheet of thickness 14 gauge duly
painted box type floor mounted made of
angle Frame containing 1 no. fully
automatic air brake starter suitable for
Motor of the following capacity, Min
switch of suitable range with HRC fuse, 1
no. volt meter (0 to 500 volts), 1 No.
Amp. Meter of 0 to 100 amp. 3 sets of
indicating lamp capacitor of suitable
capacity and 1 no. single phase preventers
with the timer switch including wiring in
panel board and suitable electric energy
meter wiring in Electric Control Panel
Board complete in all respect as per
specification given in Schedule No. II,
Including MCB, suitable, Capacitor,
Wooden Box etc as per site
requirement complete in all respect. 2. 15 HP Motor [Through Rate] | 1 | Each | 15,634.5 ₹15,634.5 Lowest | 15,915 ₹15,915 | 18,265 ₹18,265 |
| 9.00 | [21.105.37]Supplying, erection, testing and
commissioning of submersible motor
pumping set non clog for sewerage
having head 12.00 m as per the indicated
requirements of discharge in LPM and
power capacity in BHP as per
IS marked including all accessories (like
SS Pipes, SS Chain (Shackle Chain) ,SS Foundation Bolt, complete base frame,
Monorail, Chain Guide Line, Auto
Compiling, Duct Foot Bend (D/F Bend)
etc. complete in all respect 37. Discharge Capacity (LPM) - 2800 Power Capacity (BHP) - 12.5 [Through Rate] | 1 | Each | 96,723.4 ₹96,723.4 Lowest | 98,456 ₹98,456 | 1,13,000 ₹1,13,000 |
| 10.00 | [22.222.1.2]Providing and fixing in position singel socket SWR UPVC soil waste or antisyphonage pipes as per IS 13592 of E.D.C manufacture or of any other reputed firm including cutting, jointing, wastage, but excluding cost of jointing. 1.2. Single Socket Type A
110mm o/d SWR UPVC pipe lines laid complete [Through Rate] | 101.57 | Metre | 223 ₹22,650.11 Lowest | 227 ₹23,056.39 | 260 ₹26,408.2 |
Tender Value
₹8.0 L
EMD Value
₹16,000
Closing Date
18 Aug 2026, 2:00 pmClosed
Rakesh Punia
Director Office
Construction of Additional Storage Well for enhancement of water storage capacity in Water Works at MAMC Agroha
2026_HRY_537067_1
20264639A4F1 FD00 4AE0 8FD6 733F9A243CD2465MAM
Open Tender
Civil Works
Works
180 days
AGROHA
2 documents required · 2 mandatory
₹1,000
₹16,000
Yes
7 Sept 2026
29 Jul 2026
19 Aug 2026
29 Jul 2026
18 Aug 2026
29 Jul 2026
29 Jul 2026 - 31 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [10.14]Providing a floating coat of 1.50 mm thick neat cement laid in one operation to the topping. [Through Rate] | 218.06 | Sqm | 100 | ₹21,806 |
| 2 | [11.79.1]Painting with oil type wood preservative of approved brand and manufacture : 1. New work (two or more coats) [Through Rate] | 100.82 | Sqm | 101 | ₹10,182.82 |
| 3 | [11.9.1]15 mm cement plaster on rough side of single or half brick wall of mix: 1. 1:4 (1 cement: 4 coarse sand) [Through Rate] | 218.06 | Sqm | 102 | ₹22,242.12 |
| 4 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate] | 2,445 | Kg. | 103 | ₹2,51,835 |
| 5 | [15.1.2.3]Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per clause 304 of MORTandH specifications
Ordinary soil 2.3. Mechanical Means
Depth above 6m [Through Rate] | 276.95 | cum | 104 | ₹28,802.8 |
| 6 | [15.11.2.1]Plain/Reinforced Cement Concrete, in Well Foundations complete as per Drawing and Technical Specification, in Well Curb MORTandH clause 1200, 1500 and 1700 2.1. RCC M25 Grade
Using Concrete Mixer [Through Rate] | 5.61 | cum | 105 | ₹589.05 |
| 7 | [15.6.3]Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications MORTandH clause 1300 3. Cement Mortar1:4 (1cement :4 sand) [Through Rate] | 55.9 | cum | 106 | ₹5,925.4 |
| 8 | [20.114.2]Supplying erection, testing of fully
automatic electric control panel board for
T/Wells in Pump Chamber consisting of
MS sheet of thickness 14 gauge duly
painted box type floor mounted made of
angle Frame containing 1 no. fully
automatic air brake starter suitable for
Motor of the following capacity, Min
switch of suitable range with HRC fuse, 1
no. volt meter (0 to 500 volts), 1 No.
Amp. Meter of 0 to 100 amp. 3 sets of
indicating lamp capacitor of suitable
capacity and 1 no. single phase preventers
with the timer switch including wiring in
panel board and suitable electric energy
meter wiring in Electric Control Panel
Board complete in all respect as per
specification given in Schedule No. II,
Including MCB, suitable, Capacitor,
Wooden Box etc as per site
requirement complete in all respect. 2. 15 HP Motor [Through Rate] | 1 | Each | 107 | ₹107 |
| 9 | [21.105.37]Supplying, erection, testing and
commissioning of submersible motor
pumping set non clog for sewerage
having head 12.00 m as per the indicated
requirements of discharge in LPM and
power capacity in BHP as per
IS marked including all accessories (like
SS Pipes, SS Chain (Shackle Chain) ,SS Foundation Bolt, complete base frame,
Monorail, Chain Guide Line, Auto
Compiling, Duct Foot Bend (D/F Bend)
etc. complete in all respect 37. Discharge Capacity (LPM) - 2800 Power Capacity (BHP) - 12.5 [Through Rate] | 1 | Each | 108 | ₹108 |
| 10 | [22.222.1.2]Providing and fixing in position singel socket SWR UPVC soil waste or antisyphonage pipes as per IS 13592 of E.D.C manufacture or of any other reputed firm including cutting, jointing, wastage, but excluding cost of jointing. 1.2. Single Socket Type A
110mm o/d SWR UPVC pipe lines laid complete [Through Rate] | 101.57 | Metre | 109 | ₹11,071.13 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_616210.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .