Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 CrAdmitted-Finance | ₹7.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹8.5 Cr+₹91.8 L (12.1%)Admitted-Finance | ₹8.5 Cr+₹91.8 L (12.1%) | L2 | Admitted-Finance |
| 3 | L3₹16.0 Cr+₹8.4 Cr (110.6%)Admitted-Finance 8 C 1 SECTOR NO 21 MIHAN AREA NAGPUR | NAGPUR | NAGPUR | MAHARASHTRA | ₹16.0 Cr+₹8.4 Cr (110.6%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical 115 116 GANESH NAGAR HOSHANGABAD ROAD BHOPAL M P 462026 IN | BHOPAL | BHOPAL | MADHYA PRADESH | 462026 | - | - | Rejected-Technical Technically Non responsive |
| Sl No | Description | Qty | Unit | Agnitio Infrastructure Projects Pvt. Ltd. L2 | K and J Projects Pvt Ltd L3 | ARMENGE Engineering private limited L1 |
|---|---|---|---|---|---|---|
| 1.00Remuneration for Local Staff (inclusive of per Diem allowance) | ||||||
| 1.01 | Team Leader Cum Senior Highway Engineer (1 No) (1*24+1*12=36) | 36 | Man Months | 99,000 ₹35,64,000 Lowest | 2,50,000 ₹90,00,000 | 1,35,000 ₹48,60,000 |
| 1.02 | Resident cum Highway Engineer (2 Nos) 1*24+1*84=108 | 108 | Man Months | 90,000 ₹97,20,000 Lowest | 2,25,000 ₹2,43,00,000 | 1,35,000 ₹1,45,80,000 |
| 1.03 | Bridge /Structural Engineer (1 No) 1*24 | 24 | Man Months | 90,000 ₹21,60,000 Lowest | 2,25,000 ₹54,00,000 | 93,000 ₹22,32,000 |
| 1.04 | Senior Quality cum Material Expert (1 No)
(1*24+1*8=32) | 32 | Man Months | 90,000 ₹28,80,000 | 2,25,000 ₹72,00,000 | 83,000 ₹26,56,000 Lowest |
| 1.05 | Senior Pavement Specialist (1 No) | 24 | Man Months | 90,000 ₹21,60,000 | 2,10,000 ₹50,40,000 | 88,000 ₹21,12,000 Lowest |
| 1.06 | Road Safety Expert (1 No) | 8 | Man Months | 90,000 ₹7,20,000 | 1,00,000 ₹8,00,000 | 75,000 ₹6,00,000 Lowest |
| 1.07Sub-Professional Staff | ||||||
| 1.08 | Survey Engineer (3 No) (3*24+1*8=80) | 80 | Man Months | 90,000 ₹72,00,000 | 95,000 ₹76,00,000 | 75,000 ₹60,00,000 Lowest |
| 1.09 | Quantity Surveyor (3 No) (3*24+1*60=132) | 132 | Man Months | 81,000 ₹1,06,92,000 | 1,10,000 ₹1,45,20,000 | 69,500 ₹91,74,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
30 Jan 2024, 3:00 pmClosed
AK Jha
NHIDCL HQ New Delhi
Consultancy services for AE for Supervision Construction of 2 Laning with Hard Shoulder of Peren - Dimapur section on NH - 129A in the state of Nagaland on EPC mode (Pkg - III, IV and V) under NH(O)- TSP
2024_NHIDC_789429_1
NHIDCL/AE/PEREN-DIMPAUR- III, IV, V/2022-23
Open Tender
Civil Works
Item Rate
730 days
Nagaland
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,900
MD NHIDCL
₹2 L
NHIDCL HQ New Delhi
1 Aug 2024
9 Jan 2024
31 Jan 2024
9 Jan 2024
30 Jan 2024
23 Jan 2024
9 Jan 2024 - 17 Jan 2024
17 Jan 2024
Amount
Remuneration for Local Staff (inclusive of per Diem allowance)
Team Leader Cum Senior Highway Engineer (1 No) (1*24+1*12=36)
Resident cum Highway Engineer (2 Nos) 1*24+1*84=108
Bridge /Structural Engineer (1 No) 1*24
Senior Quality cum Material Expert (1 No) (1*24+1*8=32)
Senior Pavement Specialist (1 No)
Road Safety Expert (1 No)
Sub-Professional Staff
Survey Engineer (3 No) (3*24+1*8=80)
Quantity Surveyor (3 No) (3*24+1*60=132)
Lab technician (3 No) (3*24+1*60=132)
Support Staff (inclusive of per diem allowance)
Office Manger (3 no during construction and 1 in maintenance) (3*24=72+1*60= 132
Accountant cum Cashier (3no during construction and 1 in maintenance (3*24=72+1*60= 132
Steno cum Computer Operator (3no during construction and 1 in maintenance) ( (3*24=72+1*60= 132)
Office Boy (3no during construction and 1 in maintenance) ( (3*24=72+1*60= 132)
Transportation (Fixed Costs)
Scorpio or equivalent 4x4 vehicles (not more than 3 years old)
Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer's Site Offices/Regional Office. The quoted amount against remuneration should include travel fare (including Hotel Charges,travel costs etc. complete
For round trip to Employer's Head Office
For round trip to Employer's regional office.
Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc.
Main office of minimum 200 Sqm area for During Construction period (1 Nos) 1*24
During Maintenance /DLP period (1 No) 1*60=60 ( min 100 sqm area)
Office Supplies, Utilities and Communication (Fixed Costs)
Office Supplies during construction period for 1 office 1*24=24
Office Supplies during Maintenance /DLP period for 1 office 1*60=60
Drafting Supplies during construction period for 1 office 1*24=24
Drafting Supplies during Maintenance /DLP period for 1 office 1*60=60
Computer Running Costs during construction period for office 1*24=24
Computer Running Costs during Maintenance /DLP period for 1 office 1*60=60
Domestic and International Communication during construction period for 1 office 1*24=24
Domestic and International Communication during Maintenance /DLP period for 1 office 1*60=60
Office Furniture and Equipment (Rental) Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input) fax machine, PCs(5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded anti-virus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc.,
During Construction period for 1 no of office 1*24=24
During Maintenance /DLP period for 1 no of office 1*60=60
Reports and Document Printing ( rate as per copy)
Monthly reports (Design and Construction) 84 months * 3 Copies) = 252 Copies
Half yearly Reports
Various others reports as provided in the Concession Agreement such as Completion Report
Road Survey Equipment
Surface defects detection and roughness measurement using Network Survey Vehicle
Pavement strength measurement using FWD
Bridge Inspection using Mobile Bridge Inspection Unit
Road signs inspection using Retro Reflectometer
Contigencies A fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. (Fixed as Rs. 10,00,000)
Agnitio Infrastructure Projects Pvt. Ltd.
K and J Projects Pvt Ltd
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .