| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.0 CrAccepted-Finance 545 G T ROAD HOWRAH WEST BENGAL 711101 | HOWRAH | HOWRAH | WEST BENGAL | 711101 | ₹17.0 Cr | L1 | Accepted-Finance Quoted Lowest Rate |
| 2 | L2₹18.0 Cr+₹93.9 L (5.51%)Rejected-Finance | ₹18.0 Cr+₹93.9 L (5.51%) | L2 | Rejected-Finance Quoted Higher Rate |
| 3 | L3₹18.6 Cr+₹1.5 Cr (8.96%)Rejected-Finance KOLKATA METROPOLITAN DEVELOPMENT AUTHORITY OFFICE OF THE SUPERINTENDING ENGINEER CIRCLE II ROADS BRIDGES SECTOR KMDA UNNAYAN BHAWAN BLOCK A 7TH FLOOR SALT LAKE CITY KOLKATA 700091 WEST BENGAL INDIA | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | ₹18.6 Cr+₹1.5 Cr (8.96%) | L3 | Rejected-Finance Quoted Higher Rate |
| 4 | L4₹18.6 Cr+₹1.6 Cr (9.31%)Rejected-Finance | ₹18.6 Cr+₹1.6 Cr (9.31%) | L4 | Rejected-Finance Quoted Higher Rate |
| 5 | Rejected-Technical KALIKA DAS NATUN BAZAR COOCH BEHAR 736101 W B | COOCH BEHAR | COOCH BEHAR | WEST BENGAL | 736101 | - | - | Rejected-Technical Technically Disqualified due to submission of bored piling credential for incomplete work |
Tender Value
₹19.6 Cr
EMD Value
₹10 L
Closing Date
27 Jan 2026, 2:00 pmClosed
Sr. SE,WC,SS,P.W.Dte.
SR.SE.WC. Social Sector P.W.Dte Surjanagar Jagatberh Purba Bardhaman
Construction of 50 Bedded Critical Care Block (CCB) (G Plus 3) within the campus of Burdwan Medical College and Hospital, District Purba Bardhaman (2nd_Call)
2025_WBPWD_980665_1
WBPWD/SS/SRSE/WC/NIT-04-2nd_Cl
Open Tender
CIVIL AND ELECTRICAL WORKS
Percentage
365 days
Burdwan Medical College and Hospital
Please refer Tender documents.
4 documents required · 4 mandatory
₹10 L
Yes
SR.SE.WC. Social Sector P.W.Dte
26 May 2026
29 Dec 2025
29 Jan 2026
30 Dec 2025
27 Jan 2026
6 Jan 2026
2 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing Bored Cast-in-situ_M-25_ grade R.C.C. pile in position as per specifications in all kinds of soil including cost of boring using drilling mud to stabilize the e and flushing the bore of excess mud with freshly prepared drilling fluid by using pumps prior to placing concrete by tremie pipe in one continuous operation and including the st of all materials and labour for placing of concrete and also including the cost of mobilization and hire charges of all equipment necessary for boring, welding of einforcement cage as necessary and lowering of reinforcement cage, preparation and placing of concrete, including the cost of concrete but excluding the cost of einforcement and labour for bending binding etc. complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. ork to be executed as per IS: 2911 (Part II Sec 2).
(a) Using hydraulic piling rig ii) Pile diameter - 600 mm. | 5,080 | mtr | 3,783.81 | ₹1,92,21,754.8 |
| 2 | Performing Lateral load test on two piles or two groups of piles by introducing a hydraulic jack with gauge between two piles or pile groups under test by applying horizontal oads in increments of about 20% of the estimated safe load at each stage and applying the next increment after the rate of displacement is nearer to 0.1 mm. per 30 minutes ill the total displacement becomes, 12 mm at the cutoff level including the cost of arranging the entire set-up, hire charges of all implements including at least two dial gauges, preparing the pile head if necessary, and removal of all arrangement after completion etc. complete in all respect including cost of carriage of all materials and as per S specification and direction of Engineer-in-charge. | 4 | each | 27,400 | ₹1,09,600 |
| 3 | Performing Vertical load test on single Pile in accordance with IS:2911(Part-IV) by hydraulic jacks on pile/piles with 1.5 times the design load including preparation of the head f piles with concrete of required strength for receiving the jacks with all ancillary arrangements for setting up gauges, construction of suitable platforms, keeping the loads and dismantling and removing all arrangement etc. complete as per IS specification and direction of Engineer-in-charge
ii) Testing load between 100 T and 150 T. | 4 | each | 67,200 | ₹2,68,800 |
| 4 | Integrity testing of Pile using Low Strain / Sonic Integrity Test / Sonic Echo Test method in accordance with IS 14893 including surface preparation of pile top by removing soil, ud, dust & chipping lean concrete lumps etc. and use of computerized equipment and high skill trained personal for conducting the test & submission of results, all complete as per direction of Engineer-incharge.
b) For Rest of South Zone & West Zone | 253 | each | 870.6 | ₹2,20,261.8 |
| 5 | Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars.
a ) In Ground floor | 107.25 | Cum | 1,956 | ₹2,09,781 |
| 6 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or tacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as quired complete.
(a) Depth of excavation not exceeding 1,500 mm.
For Foundation ( Pile cap,grade beam,tie beam ) | 0.8 | Cum | 119.27 | ₹95.42 |
| 6.01 | (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring. | 0.8 | Cum | 192.38 | ₹153.9 |
| 7 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work.
(a) With earth obtained from excavation of foundation | 0.2 | %Cum | 7,754 | ₹1,543.05 |
| 8 | A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete ncluding the cost of supply of sand. (payment to be made on measurement of finished quantity)
(B) Do - by fine sand | 0.4 | Cum | 640.86 | ₹256.34 |
| 9 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. | 4,411.64 | Sqm | 24 | ₹1,05,879.36 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.89 MB
Tendernotice_2.pdf
PDF • 1.27 MB
BOQ_2391104.xls
BOQ • 4.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .