Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC R N B ROAD KOKRAJHAR 783370 | KOKRAJHAR | ASSAM | 783370 | ₹1.3 Cr | L1 | Accepted-AOC L1 AS PER CS |
| 2 | L2₹1.3 Cr+₹3.8 L (2.94%)Rejected-Finance NULL | ₹1.3 Cr+₹3.8 L (2.94%) | L2 | Rejected-Finance AS PER CS |
| 3 | L3₹1.4 Cr+₹6.5 L (4.97%)Rejected-Finance | ₹1.4 Cr+₹6.5 L (4.97%) | L3 | Rejected-Finance AS PER CS |
| 4 | L4₹1.4 Cr+₹11.0 L (8.48%)Rejected-Finance PIYALI PHUKAN NAGAR CHANDMARI GUWAHATI 24 KAMRUP M ASSAM | GUWAHATI | KAMRUP M | ASSAM | ₹1.4 Cr+₹11.0 L (8.48%) | L4 | Rejected-Finance AS PER CS |
| 5 | L5₹1.5 Cr+₹15.9 L (12.2%)Rejected-Finance JATIA GUWAHATI | GUWAHATI | ₹1.5 Cr+₹15.9 L (12.2%) | L5 | Rejected-Finance AS PER CS |
| Sl No | Description | Qty | Unit | Harunur Rashid L2 | Kamal Singh Dugar L1 | OK Enterprise L5 | M/s Maa Construction L4 | SURAJIT BORAH L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00LPLAIN CEMENT WORKS | ||||||||
| 2.00Plain cement concrete works with coarse aggregate of sizes 13mm to 32mm in foundation bed for footing steps, walls, brick works etc. as directed and specified including dewatering if necessary, and curing complete (shuttering where necessary shall be measured and paid separately). | ||||||||
| 3.00 | a). In prop. 1:3: 6 (1 cement:3 coarse sand : 6 coarse agg. by volume (using mixture machine) | 72 | CUM | 4,500 ₹3,24,000 | 7,300 ₹5,25,600 | 5,270.9 ₹3,79,504.8 | 4,112.56 ₹2,96,104.32 Lowest | 4,292.86 ₹3,09,085.92 |
| 4.00REINFORCED CEMENT CONCRETE WORKS | ||||||||
| 5.00Providing and laying plain/reinforced cement croncrete works cement with coarse sand & 20mm down graded stone aggregate including dewatering if necessary, and curing complete but excluding cost of form work and reinforcement for reinforced cement concrete work (form work and reinforcement will be measured and paid separately) | ||||||||
| 6.00Columns, pillars, posts, struts, suspended floor, roof, landing, shelf and support, balcony, lintel, sill band, beam, girder, bressumer, cantilever, staircase (except spiral staircase and landing ) including preparing the top surface and finishing of nosing above plinth level. | ||||||||
| 7.00Without using admixture, plasticiser | ||||||||
| 8.00M20 or Prop. 1:1.5:3 | ||||||||
| 9.00 | iv) From 3rd floor level to 4th floor level. | 20.93 | CUM | 7,500 ₹1,56,975 | 9,300 ₹1,94,649 | 7,549.1 ₹1,58,002.66 | 7,237.69 ₹1,51,484.85 | 6,331.46 ₹1,32,517.46 Lowest |
| 10.00PLYBOARD SHUTTERING (FORMWORK) | ||||||||
Tender Value
₹1.5 Cr
EMD Value
₹2.9 L
Closing Date
13 Feb 2026, 2:00 pmClosed
REGISTRAR
ADMINISTRATIVE BUILDING COTTON UNIVERSITY
Civil, Electrical, Sanitary and Fire Fighting Works.
2026_CU_50825_1
CU/EC/2026/166/1531-36
Open Tender
Civil Works - Building
Item Rate
30 days
COTTON UNIVERSITY
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
Yes
₹2.9 L
Yes
2 Jun 2026
6 Feb 2026
13 Feb 2026
6 Feb 2026
13 Feb 2026
7 Feb 2026
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .