| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹70.8 LAccepted-AOC GLYPTIC RAIPUR P O BHITA BURDWAN 713102 | BURDWAN | PURBA BARDHAMAN | WEST BENGAL | 713102 | ₹70.8 L | L-1 | Accepted-AOC L-1 Bidder. |
| 2 | L-2₹1.1 CrRejected-AOC | ₹1.1 Cr | L-2 | Rejected-AOC Not L-1 Bidder. |
| 3 | L-3₹1.4 CrRejected-AOC 880 1 SC ROAD BATOR HOWRAH 711104 | HOWRAH | HOWRAH | WEST BENGAL | 711104 | ₹1.4 Cr | L-3 | Rejected-AOC Not L-1 Bidder. |
| Sl No | Description | Qty | Unit | Glyptic L1 | DISCERN ENGINEERING PRIVATE LIMITED L3 | TECHNOGRATE ENGINEERS L2 |
|---|---|---|---|---|---|---|
| 10.00FIRE LINE REPLACEMENT OF NAPHTHA TANK | ||||||
| 10.00 | Supply, erec & dismntl of Scaffolding | 3 | SET | 2,87,780.52 ₹10.2 L | 5,00,000 ₹17.7 L | 4,22,800 ₹15.0 L |
| 10.00 | Dismantling of Existing piping system | 3 | SET | 1,74,039 ₹6.2 L | 50,000 ₹1.8 L | 6,04,000 ₹21.4 L |
| 10.00 | Complete erection welding & painting etc | 3 | SET | 80,797.55 ₹2.9 L | 1,50,000 ₹5.3 L | 3,02,000 ₹10.7 L |
| 10.00 | Hydrotest of piping | 3 | SET | 1,16,482.59 ₹4.1 L | 50,000 ₹1.8 L | 52,850 ₹1.9 L |
| 20.00FOAM LINE REPLACEMENT OF NAPHTHA TANK | ||||||
| 20.00 | Dismantling and erection of Dia. 40 foam | 3 | SET | 44,188.8 ₹1.6 L | 1,50,000 ₹5.3 L | 51,000 ₹1.8 L |
| 30.00SUPPLY OF MATERIAL FOR NAPHTHA TANK | ||||||
| 30.00 | GI Pipe as per IS:1239 Hy Gauge | 3 | SET | 4,36,752.41 ₹15.5 L | 12,00,000 ₹42.5 L | 5,74,200 ₹20.3 L |
| 30.00 | CS Flanges as per SA105 (Every 6 Mtr.) | 3 | SET | 1,22,879.46 ₹4.3 L | 2,00,000 ₹7.1 L | 90,600 ₹3.2 L |
Updated dates
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
23 Mar 2026, 4:30 pmClosed
DGM
Western Region Head QuartersII Plot No. -87, Sector-24, Atal RAIPUR 492018
Supply, Erection and commissioning of NGL firefighting system at NTPC Kawas
2026_NTPC_105398_1
NTPC/USSC-CPG1/9900320262
Limited
Miscellaneous Works
365 days
Western Region Head QuartersII Plot No. -87, Secto
5 documents required · 5 mandatory
₹0
₹1 L
10 Apr 2026
20 Feb 2026
25 Mar 2026
20 Feb 2026
23 Mar 2026
27 Feb 2026
20 Feb 2026 - 3 Mar 2026
FIRE LINE REPLACEMENT OF NAPHTHA TANK
Supply, erec & dismntl of Scaffolding
Dismantling of Existing piping system
Complete erection welding & painting etc
Hydrotest of piping
FOAM LINE REPLACEMENT OF NAPHTHA TANK
Dismantling and erection of Dia. 40 foam
SUPPLY OF MATERIAL FOR NAPHTHA TANK
GI Pipe as per IS:1239 Hy Gauge
CS Flanges as per SA105 (Every 6 Mtr.)
0.5" Socket with Sprinkle
Pipe Clamps
Bolts and washer
paint
Supply of FoamMaker,pourer&bends,support
FIRE LINE REPLACEMENT OF HSD TANK
Supply, erec & dismntl of Scaffolding
Dismantling of Existing piping system
Complete erection welding & painting etc
Hydrotest of piping
FOAM LINE REPLACEMENT OF HSD TANK
Dismantling and erection of Dia. 40 foam
SUPPLY OF MATERIAL FOR HSD TANK
GI Pipe as per IS:1239 Hy Gauge
CS Flanges as per SA105 (Every 6 Mtr.)
0.5" Socket with Sprilnker
Pipe Clamps
Bolts and washer
paint
Supply of FoamMaker,pourer,bends support
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
techsummary_108631.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.13 MB
RevisedTenderDocument.rar
Tender Documents • 20.70 MB
BOQ_108631.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid