| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹70.8 LAccepted-AOC GLYPTIC RAIPUR P O BHITA BURDWAN 713102 | BURDWAN | PURBA BARDHAMAN | WEST BENGAL | 713102 | L-1 | Accepted-AOC L-1 Bidder. | |
| 2 | L-2₹1.1 Cr+₹35.0 L (49.4%)Rejected-AOC | L-2 | Rejected-AOC Not L-1 Bidder. | |
| 3 | L-3₹1.4 Cr+₹64.9 L (91.7%)Rejected-AOC 880 1 SC ROAD BATOR HOWRAH 711104 | HOWRAH | HOWRAH | WEST BENGAL | 711104 | L-3 | Rejected-AOC Not L-1 Bidder. |
| Sl No | Description | Qty | Unit | Glyptic L1 | DISCERN ENGINEERING PRIVATE LIMITED L3 | TECHNOGRATE ENGINEERS L2 |
|---|---|---|---|---|---|---|
| 10.00FIRE LINE REPLACEMENT OF NAPHTHA TANK | ||||||
| 10.00 | Supply, erec & dismntl of Scaffolding | 3 | SET | 2,87,780.52 ₹10,18,743.04 Lowest | 5,00,000 ₹17,70,000 | 4,22,800 ₹14,96,712 |
| 10.00 | Dismantling of Existing piping system | 3 | SET | 1,74,039 ₹6,16,098.06 | 50,000 ₹1,77,000 Lowest | 6,04,000 ₹21,38,160 |
| 10.00 | Complete erection welding & painting etc | 3 | SET | 80,797.55 ₹2,86,023.33 Lowest | 1,50,000 ₹5,31,000 | 3,02,000 ₹10,69,080 |
| 10.00 | Hydrotest of piping | 3 | SET | 1,16,482.59 ₹4,12,348.37 | 50,000 ₹1,77,000 Lowest | 52,850 ₹1,87,089 |
| 20.00FOAM LINE REPLACEMENT OF NAPHTHA TANK | ||||||
| 20.00 | Dismantling and erection of Dia. 40 foam | 3 | SET | 44,188.8 ₹1,56,428.35 Lowest | 1,50,000 ₹5,31,000 | 51,000 ₹1,80,540 |
| 30.00SUPPLY OF MATERIAL FOR NAPHTHA TANK | ||||||
| 30.00 | GI Pipe as per IS:1239 Hy Gauge | 3 | SET | 4,36,752.41 ₹15,46,103.53 Lowest | 12,00,000 ₹42,48,000 | 5,74,200 ₹20,32,668 |
| 30.00 | CS Flanges as per SA105 (Every 6 Mtr.) | 3 | SET | 1,22,879.46 ₹4,34,993.29 | 2,00,000 ₹7,08,000 | 90,600 ₹3,20,724 Lowest |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
6 Mar 2026, 4:30 pmClosed
DGM
Western Region Head QuartersII Plot No. -87, Sector-24, Atal RAIPUR 492018
Supply, Erection and commissioning of NGL firefighting system at NTPC Kawas
2026_NTPC_105398_1
NTPC/USSC-CPG1/9900320262
Limited
Miscellaneous Works
Works
365 days
Western Region Head QuartersII Plot No. -87, Secto
5 documents required · 5 mandatory
₹0
₹1 L
10 Apr 2026
20 Feb 2026
9 Mar 2026
20 Feb 2026
6 Mar 2026
27 Feb 2026
20 Feb 2026 - 3 Mar 2026
FIRE LINE REPLACEMENT OF NAPHTHA TANK
Supply, erec & dismntl of Scaffolding
Dismantling of Existing piping system
Complete erection welding & painting etc
Hydrotest of piping
FOAM LINE REPLACEMENT OF NAPHTHA TANK
Dismantling and erection of Dia. 40 foam
SUPPLY OF MATERIAL FOR NAPHTHA TANK
GI Pipe as per IS:1239 Hy Gauge
CS Flanges as per SA105 (Every 6 Mtr.)
0.5" Socket with Sprinkle
Pipe Clamps
Bolts and washer
paint
Supply of FoamMaker,pourer&bends,support
FIRE LINE REPLACEMENT OF HSD TANK
Supply, erec & dismntl of Scaffolding
Dismantling of Existing piping system
Complete erection welding & painting etc
Hydrotest of piping
FOAM LINE REPLACEMENT OF HSD TANK
Dismantling and erection of Dia. 40 foam
SUPPLY OF MATERIAL FOR HSD TANK
GI Pipe as per IS:1239 Hy Gauge
CS Flanges as per SA105 (Every 6 Mtr.)
0.5" Socket with Sprilnker
Pipe Clamps
Bolts and washer
paint
Supply of FoamMaker,pourer,bends support
stage.html
html • 0.04 MB
techsummary_108631.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.13 MB
RevisedTenderDocument.rar
Tender Documents • 20.70 MB
BOQ_108631.xls
BOQ • 0.32 MB
ExtensionofDates.pdf
PDF • 0.03 MB
ExtensionofDates.pdf
PDF • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .