Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.3 LRejected-Finance | 1 | Rejected-Finance Above the estimated rate | |
| 2 | 2₹8.3 L+₹973.91 (0.12%)Rejected-Finance | 2 | Rejected-Finance Above the estimated rate |
| Sl No | Description | Qty | Unit | M/S MOHIT ASSOCIATES L2 | VIJAY ASSOCIATES L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in foundation in all type of soil including initial lift up to 1.50 meter and lead up to 30 meter and including back filling watering and ramming of excavated earth into the space between the structure and the sides of foundation trenches and disposal of surplus earth as directed by the Engineer-in-charge up to 30 meter distance from the foundation. | 192.58 | CUM | 79 ₹15,213.82 | 78 ₹15,021.24 Lowest |
| 2.00 | Providing and laying of Cement Concrete M-10 (CC 1:3:6) including cost of all material, labour and T&P etc. complete required for proper complition of work. | 27.34 | CUM | 5,896 ₹1,61,196.64 Lowest | 5,898 ₹1,61,251.32 |
| 3.00 | Providing first class M-150 Brick work in 1:4 cement mortar including cost of all material, labour and T&P etc. complete required for proper complition of work. | 81.86 | CUM | 4,611 ₹3,77,456.46 | 4,610 ₹3,77,374.6 Lowest |
| 4.00 | Providing and laying of Cement Concrete M-20 (RCC 1:1.5:3) including cost of all material, labour and T&P etc. complete required for proper complition of work. | 15.28 | CUM | 7,623.7 ₹1,16,490.14 | 7,622.7 ₹1,16,474.86 Lowest |
| 5.00 | Providing and laying of Cement Concrte M-25 (CC 1:1:2) including cost of all material, labour and T&P etc. complete required for proper complition of work. | 1.08 | CUM | 7,623.7 ₹8,241.22 | 7,622.7 ₹8,240.14 Lowest |
| 6.00 | Providing and fixing Cantering & shuttering for C.C. Works including cost of all material, labour, T&P, all lifts and leads, etc for proper completion of work . | 26.95 | SQM | 467 ₹12,585.65 | 466 ₹12,558.7 Lowest |
| 7.00 | Supply and Fixing drainage 75 mm Dia PVC. Pipe Including cost of all material T&P, labours etc complete. | 9 | RM | 249 ₹2,241 | 248 ₹2,232 Lowest |
| 8.00 | Providing 12 mm thick plaster in 1:4 cement mortar incl. cost of all labour, T&P material etc complete as per direction of Engineer - in charge. | 80.15 | SQM | 153.2 ₹12,278.98 | 152.2 ₹12,198.83 Lowest |
| 9.00 | Providing Brick on edge pitching on canal section incl. cost of all labour, T&P material etc complete as per direction of Engineer - in charge. | 7.5 | SQM | 545 ₹4,087.5 | 544 ₹4,080 Lowest |
| 10.00 | Earth work in Filling in embankment in ordinary soil including ramming and dressing the surface to be required levels and slopes and also including all lift and Lead upto 1 km distance including cost of all Labour T&P etc complete as directed by Engineer-in- charge. | 614.19 | CUM | 193 ₹1,18,538.67 | 192 ₹1,17,924.48 Lowest |
Tender Value
₹8.2 L
EMD Value
₹16,449
Closing Date
23 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE MGCCD8 BULANDSHAHR
EE MGCCD8 BULANDSHAHR
Construction of fall of kirari minor at KM 0.600
2026_UPIDC_1200823_8
03/EE/2026-27
Open Tender
Civil Works
Item Rate
30 days
sambhal
TENDER FEE, EMD,TECHNICAL QUALIFICATION
2 documents required · 2 mandatory
₹858
₹16,449
27 Nov 2026
17 Nov 2026
25 Nov 2026
17 Nov 2026
23 Nov 2026
17 Nov 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in foundation in all type of soil including initial lift up to 1.50 meter and lead up to 30 meter and including back filling watering and ramming of excavated earth into the space between the structure and the sides of foundation trenches and disposal of surplus earth as directed by the Engineer-in-charge up to 30 meter distance from the foundation. | 192.58 | CUM | - | - |
| 2 | Providing and laying of Cement Concrete M-10 (CC 1:3:6) including cost of all material, labour and T&P etc. complete required for proper complition of work. | 27.34 | CUM | - | - |
| 3 | Providing first class M-150 Brick work in 1:4 cement mortar including cost of all material, labour and T&P etc. complete required for proper complition of work. | 81.86 | CUM | - | - |
| 4 | Providing and laying of Cement Concrete M-20 (RCC 1:1.5:3) including cost of all material, labour and T&P etc. complete required for proper complition of work. | 15.28 | CUM | - | - |
| 5 | Providing and laying of Cement Concrte M-25 (CC 1:1:2) including cost of all material, labour and T&P etc. complete required for proper complition of work. | 1.08 | CUM | - | - |
| 6 | Providing and fixing Cantering & shuttering for C.C. Works including cost of all material, labour, T&P, all lifts and leads, etc for proper completion of work . | 26.95 | SQM | - | - |
| 7 | Supply and Fixing drainage 75 mm Dia PVC. Pipe Including cost of all material T&P, labours etc complete. | 9 | RM | - | - |
| 8 | Providing 12 mm thick plaster in 1:4 cement mortar incl. cost of all labour, T&P material etc complete as per direction of Engineer - in charge. | 80.15 | SQM | - | - |
| 9 | Providing Brick on edge pitching on canal section incl. cost of all labour, T&P material etc complete as per direction of Engineer - in charge. | 7.5 | SQM | - | - |
| 10 | Earth work in Filling in embankment in ordinary soil including ramming and dressing the surface to be required levels and slopes and also including all lift and Lead upto 1 km distance including cost of all Labour T&P etc complete as directed by Engineer-in- charge. | 614.19 | CUM | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.76 MB
BOQ_2295652.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .