| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.9 LAccepted-AOC NO ADDRESS FOUND | ₹19.9 L | L1 | Accepted-AOC Low Rate |
| 2 | L2₹20.4 LRejected-Finance | ₹20.4 L | L2 | Rejected-Finance High Rate |
| Sl No | Description | Qty | Unit | ANBARASU L1 | SANTHAN L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for 160 mm HDPE Pipe and depositing on bank with initiallead of 10 m and lift of 2 M in narrow trenches for layingof pipes for water supply and sewerage works in thefollowing type of soils as directed by Departmentalofficers such as Hard stiff clay, stiff black cotton, hard red earth, shales,murram gravel, stoney earth and earth mixed with smallsize boulders and hard gravelly soil.One cubicmetre Excluding Refilling | 1,150 | 1 m3 (One Cubic meter) | 207 ₹2.4 L | 220 ₹2.5 L |
| 2.00 | Supplying and Delivery of 160 mm dia PN 10 HDPE PIPE includind all cost of materials and other chrges etc complete complying with standard Specifications | 1,150 | 1 m3 (One Cubic meter) | 1,176 ₹13.5 L | 1,200 ₹13.8 L |
| 3.00 | Lowering HDPE pipes and specials to trench and laying to proper grade and alignment, jointing with PVC couplers with cement paste | 1,150 | 1 m3 (One Cubic meter) | 28 ₹32,200 | 30 ₹34,500 |
| 4.00 | Jointing HDPE Pipes and Specials by butt fusion welding / electro fusion welding joints using fusion equipment as per ISO 21307-2011 and as per IS 7634 (part-2) : 2012 including cost of hire charges for butt fusion equipment power supply arrangements etc., complete as per directed byTWAD Board Officers. | 192 | 1 m3 (One Cubic meter) | 341 ₹65,472 | 356 ₹68,352 |
| 5.00 | Refilling with Excavated soil including all labour chrges etc complete complying with standard Specifications | 1,150 | 1 m3 (One Cubic meter) | 27.5 ₹31,625 | 29 ₹33,350 |
| 6.00 | Supply and delivery of 80 mm dia DI Single Air Release Valve- specification as per p68 of SoR.IS marking suitable for use in water supply main including, loading, freight, unloading and stocking at site and all the incidental charges etc ., complete and as directed by TWAD Board officers. | 6 | 1 m3 (One Cubic meter) | 16,845 ₹1.0 L | 17,000 ₹1.0 L |
| 7.00 | Supply and delivery of specials required for fixing the Air Valve 150mm x80mm DIA/F TEE | 162 | 1 m3 (One Cubic meter) | 147.5 ₹23,895 | 150 ₹24,300 |
| 8.00 | 50 mm GI Pipe | 6 | 1 m3 (One Cubic meter) | 473 ₹2,838 | 490 ₹2,940 |
| 9.00 | 160 mm HDPE Stubend / flanged | 12 | 1 m2 (One Square meter) | 500 ₹6,000 | 534 ₹6,408 |
| 10.00 | 50 mm GI Elbow | 12 | 1 m2 (One Square meter) | 192 ₹2,304 | 212 ₹2,544 |
Tender Value
₹24 L
EMD Value
₹24,000
Closing Date
10 Feb 2026, 6:00 pmClosed
EXECUTIVE OFFICER
VIKRAVANDI TOWN PANCHAYAT
Providing 160 mm dia HDPE Pipe Line at Reddykuppam in Vikravandi Town Panchayat.
2026_DTP_650069_1
a1/41/2026
Open Tender
Waste Paper
90 days
Providing 160 mm dia HDPE Pipe Line at Reddykuppa
Providing 160 mm dia HDPE Pipe Line at Reddykuppam in Vikravandi Town Panchayat.
2 documents required · 2 mandatory
₹0
₹24,000
Yes
27 Feb 2026
2 Feb 2026
10 Feb 2026
2 Feb 2026
10 Feb 2026
2 Feb 2026
2 Feb 2026 - 10 Feb 2026
Earth work excavation for 160 mm HDPE Pipe and depositing on bank with initiallead of 10 m and lift of 2 M in narrow trenches for layingof pipes for water supply and sewerage works in thefollowing type of soils as directed by Departmentalofficers such as Hard stiff clay, stiff black cotton, hard red earth, shales,murram gravel, stoney earth and earth mixed with smallsize boulders and hard gravelly soil.One cubicmetre Excluding Refilling
Supplying and Delivery of 160 mm dia PN 10 HDPE PIPE includind all cost of materials and other chrges etc complete complying with standard Specifications
Lowering HDPE pipes and specials to trench and laying to proper grade and alignment, jointing with PVC couplers with cement paste
Jointing HDPE Pipes and Specials by butt fusion welding / electro fusion welding joints using fusion equipment as per ISO 21307-2011 and as per IS 7634 (part-2) : 2012 including cost of hire charges for butt fusion equipment power supply arrangements etc., complete as per directed byTWAD Board Officers.
Refilling with Excavated soil including all labour chrges etc complete complying with standard Specifications
Supply and delivery of 80 mm dia DI Single Air Release Valve- specification as per p68 of SoR.IS marking suitable for use in water supply main including, loading, freight, unloading and stocking at site and all the incidental charges etc ., complete and as directed by TWAD Board officers.
Supply and delivery of specials required for fixing the Air Valve 150mm x80mm DIA/F TEE
50 mm GI Pipe
160 mm HDPE Stubend / flanged
50 mm GI Elbow
MS Bolt & Nut Jointing Including Cost of material, Bolts, Nuts, RI Shuts etc., 150MM D/F JOINT
80 mm D/f Joint
Testing of HDPE pipes for water supply with hydraulic testing equipment by filling with water and testing to recommended pressure in convenient stretches and attending the bursts if any occured during the test, excluding the cost of pipes but including other incidential and operational charges etc., complete for the following diametres of pipes.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_779413.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
BOQ_779413.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid