Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 CrAdmitted-Finance SALEM TAMIL NADU | ₹2.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.5 Cr+₹5.4 L (2.24%)Admitted-Finance 1 82 ANNA NAGAR 5TH STREET DHARMAPURI MAIN ROAD KOTTAMETTUPATTI VILLAGE OMALUR 636455 | OMALUR | SALEM | TAMIL NADU | 636455 | ₹2.5 Cr+₹5.4 L (2.24%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical CHENNAI | CHENNAI | TAMIL NADU | 600001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | D KAMARAJ L1 | Pownambal Construction L2 |
|---|---|---|---|---|---|
| 1.00 | Engagement of JCB Excavator for Earth work excavation for leveling the uneven surface and filling ruts and pot holes including consolidation etc.complete. | 70 | Hours | 909 ₹64,266.3 Lowest | 925 ₹65,397.5 |
| 2.00 | Dismantling the existing damaged cement concrete flooring using concrete breaker including hire charges and all labour charges and clearing the site for giving new course etc complete. | 100 | Hours | 2,377 ₹2,40,077 Lowest | 2,390 ₹2,41,390 |
| 3.00 | Earthwork Excavation for foundation in all soils and sub soils except hard rock with blasting including refilling with excavated earth for sides of foundation etc.complete with standard specification. | 280 | Cu.m | 102.96 ₹29,117.09 Lowest | 115 ₹32,522 |
| 4.00 | Supply and Filling with M-sand in layers not more than 15cm TK including well consolidation ramming etc. complete with standard specification. | 35 | Cu.m | 1,493 ₹52,777.55 Lowest | 1,500 ₹53,025 |
| 5.00 | Providing and laying plain cement concrete, 1:5:10 (One Cement, five ‘M’ sand and ten coarse aggregates) using 40mm size HBG metals including cost of all materials ,labour charges, well compaction and curing.etc complete with standard specification. | 1,000 | Cu.m | 5,020.9 ₹50,71,109 Lowest | 5,150 ₹52,01,500 |
| 6.00 | Providing steel centering to Concrete works including side supports and removal of centering after curing including all labour charges etc complete with standard specification. | 700 | Sq.mtr | 700 ₹4,94,900 Lowest | 710 ₹5,01,970 |
| 7.00 | Providing and laying plain cement concrete, 1:2:4 (One Cement, two ‘M’ sand and four coarse aggregates) using 20mm size HBG metals including cost of all materials ,labour charges, well compaction and curing.etc complete with standard specification | 96 | Cu.m | 6,950 ₹6,73,872 Lowest | 7,000 ₹6,78,720 |
| 8.00 | Construction of Granular Sub base by providing close graded material (grade V-IRC HBG 53mm to 2.36 mm metal)mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers and with motor grader on required surface including spreading water with water sprinkler and compacting with vibratory soil compactor to achieve the desired density complete as per clause 401 | 1,500 | Cu.m | 2,200 ₹33,33,000 Lowest | 2,300 ₹34,84,500 |
| 9.00 | Supply, fabrication and placing in position of MS/RTS Steel rods to the required shape and size including cost of MS/RTS steel rods, GI binding wire and all labour charges.etc complete with standard specification. | 48 | MT | 89,898 ₹43,58,255.04 Lowest | 90,000 ₹43,63,200 |
| 10.00 | Providing and laying reinforced cement concrete 1:2:4 (One Cement, two M sand and four coarse aggregates) using 20mm size HBG metals including laying in panels in a standard size with all side supports for giving expansion joints, excluding cost of steel but including cost of other materials, all labour charges, well compaction with vibrator and curing. Etc complete with standard specification. | 1,180 | Cu.m | 8,300.2 ₹98,92,178.36 Lowest | 8,500 ₹1,01,30,300 |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
17 Oct 2024, 3:00 pmClosed
THE ADMINISTRATOR
CHENGALRAYAN CO-OPERATIVE SUGAR MILLS LTD.,PERIYASEVALAI.
LAYING CEMENT CONCRETE CANE YARD
2024_TNCSF_484226_1
1499/2024/CCSM/NADP/CIVIL/P1
Open Tender
Civil Works
Works
7 days
CHENGALRAYAN CO-OP SUGAR MILLS LTD., PERIYASEVALAI.
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
₹1.3 L
Yes
29 Oct 2024
14 Sept 2024
18 Oct 2024
14 Sept 2024
17 Oct 2024
14 Sept 2024
Amount
Engagement of JCB Excavator for Earth work excavation for leveling the uneven surface and filling ruts and pot holes including consolidation etc.complete.
Dismantling the existing damaged cement concrete flooring using concrete breaker including hire charges and all labour charges and clearing the site for giving new course etc complete.
Earthwork Excavation for foundation in all soils and sub soils except hard rock with blasting including refilling with excavated earth for sides of foundation etc.complete with standard specification.
Supply and Filling with M-sand in layers not more than 15cm TK including well consolidation ramming etc. complete with standard specification.
Providing and laying plain cement concrete, 1:5:10 (One Cement, five ‘M’ sand and ten coarse aggregates) using 40mm size HBG metals including cost of all materials ,labour charges, well compaction and curing.etc complete with standard specification.
Providing steel centering to Concrete works including side supports and removal of centering after curing including all labour charges etc complete with standard specification.
Providing and laying plain cement concrete, 1:2:4 (One Cement, two ‘M’ sand and four coarse aggregates) using 20mm size HBG metals including cost of all materials ,labour charges, well compaction and curing.etc complete with standard specification
Construction of Granular Sub base by providing close graded material (grade V-IRC HBG 53mm to 2.36 mm metal)mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers and with motor grader on required surface including spreading water with water sprinkler and compacting with vibratory soil compactor to achieve the desired density complete as per clause 401
Supply, fabrication and placing in position of MS/RTS Steel rods to the required shape and size including cost of MS/RTS steel rods, GI binding wire and all labour charges.etc complete with standard specification.
Providing and laying reinforced cement concrete 1:2:4 (One Cement, two M sand and four coarse aggregates) using 20mm size HBG metals including laying in panels in a standard size with all side supports for giving expansion joints, excluding cost of steel but including cost of other materials, all labour charges, well compaction with vibrator and curing. Etc complete with standard specification.
Laying Expansion joint using bituminous pad 20mm thickness during laying of concrete with necessary side supports,including cost of material and labour charges etc., complete with standard specification.
Pownambal Construction (BID ID -1166866)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .