| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹83.9 LAccepted-AOC KOVILPATTI | KOVILPATTI | TAMIL NADU | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹84.6 L+₹72,369.97 (0.86%)Rejected-Finance | L2 | Rejected-Finance Highest rate |
Tender Value
₹83.9 L
EMD Value
₹86,000
Closing Date
15 Jul 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director, DRDA, Virudhunagar
DRDA, Collectorate Complex, Virudhunagar
Deepening and Improvements to the Ooranies - 10 nos. in AGAMT-II-2021-22 Village panchayats of Sattur Block in Virudhunagar District in Package no.STR-1.
2022_RDTN_237316_46
C9/5832/2021 dated 18.06.2022
Open Tender
Civil Works
Works
180 days
Sattur Block
Two Cover System. Refer tender document.
5 documents required · 5 mandatory
₹0
₹86,000
DRDA, Collectorate Complex, Virudhunagar
16 Sept 2022
28 Jun 2022
15 Jul 2022
28 Jun 2022
15 Jul 2022
6 Jul 2022
6 Jul 2022
90 days
Amount
Part-1:- Rejuvenation of oorani (Desilting of Oorani & Construction of Retaining Wall 30M) @ Chinnaodaipatti village & Panchayat
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with small size boulders SS.20
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Centering charges for all concerete works including all labour charges etc., complete as per Standared specification
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Part-2:- Rejuvenation of Parai oorani (Desilting of Main pond & Construction of Retaining Wall 30M) @ Chinnaodaipatti village & Panchayat
Clearing Light Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with small size boulders SS.20
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Centering charges for all concerete works including all labour charges etc., complete as per Standared specification
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Part-3:- Rejuvenation of Agamt oorani (De-silting of Main Pond, construction of Retaining wall (48m), Renovation of Existing Bathing Ghat) @ Kanjampatti village & Panchayat.
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with small size boulders SS.20
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Centering charges for all concerete works including all labour charges etc., complete as per Standared specification
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Gravel backing for revetments including cost and conveyance and all labour charges etc complete
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete
Plastering with cement mortar 1:4 mix to 20 mm thick including cost and conveyance and all labour charges etc complete.
Part-4:- Rejuvenation of Mela oorani (construction of Bathing Ghat, Desilting of Main Pond, Baby Pond, Leading channel, Toe wall (25m)) @ K.Pudur village of Kathalampatti Panchayat.
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with small size boulders SS.20
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Centering charges for all concerete works including all labour charges etc., complete as per Standared specification
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Gravel backing for revetments including cost and conveyance and all labour charges etc complete
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete
Part-5:- Rejuvenation of AGAMT Oorani (Desilting of Main pond, Retaining wall (55.50M) at N.Subbiahapuram Village and Panchayat
Clearing Light Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with small size boulders SS.20
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Centering charges for all concerete works including all labour charges etc., complete as per Standared specification
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Part-6:- Rejuvenation of west Oorani (Desilting of Outlet supply channel, Retaining wall (50 M) at N.Venkateswarapuram village and Panchayat
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with small size boulders SS.20
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Centering charges for all concerete works including all labour charges etc., complete as per Standared specification
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Part-7:- Rejuvenation of Therku oorani (Desilting of Main Pond, Baby Pond, Retaining wall 24M & Baby pond Toe wall 66M) @ Nallamuthanpatti village & Panchayat.
Clearing Light Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with small size boulders SS.20
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Centering charges for all concerete works including all labour charges etc., complete as per Standared specification
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete.
Gravel backing for revetments including cost and conveyance and all labour charges etc complete
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete
Towards the cost for 900mm dia RCC Pipe including cost and conveyance and all labour charges etc., complete.
Part-8:- Rejuvenation of Sevelkulam Kanmai (Desilting of Supply channel, Construction Bathing Ghat & Retaining Wall 30M) at Near Mela sirukulam village
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with small size boulders SS.20
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Centering charges for all concerete works including all labour charges etc., complete as per Standared specification
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Part-9:- Rejuvenation of Soorangudi Oorani (Desilting of supply channel, Bathing ghat, Retaining wall (30m), Toe wall (12M) @ Nadusoorangudi village of Soorangudi Panchayat
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with small size boulders SS.20
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete Desilting of supply channel up to 3 m width
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Centering charges for all concerete works including all labour charges etc., complete as per Standared specification
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Gravel backing for revetments including cost and conveyance and all labour charges etc complete
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete
Part-10:- Rejuvenation of east south side of jakkammal oorani (Desilting of Supply channel, Construction of Retaining wall (50M) at Venkatachalapuram village & panchayat
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with small size boulders SS.20
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete Desilting of supply channel up to 3 m width
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Centering charges for all concerete works including all labour charges etc., complete as per Standared specification
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
GST Amount for providing Service to the above Government Contract Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
P Ponnuraj
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .