Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance 1803 6 PHASE 4 OPP METAL TREAT INDUSTRIES VITHAL UDDHYOG NAGAR ANAND 388 121 | NAGAR ANAND | BETUL | MADHYA PRADESH | 388121 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance LASJAN BYE PASS SRINAGAR J K 191101 | SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | 191101 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.7 Cr
Closing Date
18 May 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
THE EXECUIVE ENGINEER RNB DIVISION PULWAMA
THE EXECUIVE ENGINEER RNB DIVISION PULWAMA
Construction of Road from Dar Ganie Gund to Shrine of Sheikh Baqir Sahab via Sofigund at Tral (Bal.Work).
2021_PWDJK_123088_1
06 /EEP/RNB of 2021-22/826-36 Dt. 26 /04/2021
Open Tender
Civil Works
Item Rate
180 days
Dar ganie Gund Tral
as Per nit
3 documents required · 3 mandatory
₹2,600
THE EXECUIVE ENGINEER RNB DIVISION PULWAMA
Exempted
19 May 2021
26 Apr 2021
19 May 2021
26 Apr 2021
18 May 2021
26 Apr 2021
120 days
Amount
Part-1----------Site clearance /Earthwork in cutting
Site clearance including cutting of trees & up rooting out stumps including disposal of same as directed by engineer-incharge.
Earth work in excavation by mechanical means (Hydraulic excavator) over areas (Exceeding 30 cm in depth, 1.5mtr in width as well as 10 sqm on plan) including disposal of excavated earth, as directed by Engineer-incharge disposed earth to be levelled and neatly dressed: All kinds of soil. including Hard rock.
Part-2----------Stone soling /GSB filling and WBM Grade-II.
Supply and filling of Stone Soling (Quarry) including leveling dressing, ramming watering and consolidation with power roller to required gradient and camber with carriage of all material involved loading, unloading and stacking complete.
Supplying and stacking of graded stone aggregate at site of size including all carriage involved complete.63-45mm size (quarry Woyen).
Supplying and stacking of stone screenings, chippings at site including all carriage involved complete. 13.2mm nominal size (Type-A)
Supplying and stacking of moorum (stone dust) at site including all carriage involved complete.
Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening /binding material to fill up interstices of coarse aggregate, watering and compacting to the required density.
Providing and laying of 18" Φ RCC spun pipes in proper level and grade including trench excavation and cushion as per clause 2900 of MORTH specification including all carriages involved complete
Providing and laying of 12" Φ RCC spun pipes in proper level and grade including trench excavation and cushion as per clause 2900 of MORTH specification including all carriages involved complete
Part-3…(A)----------R/Wall, B/Wall.
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc (Not exceeding 1.5 Mtr in width) and for shafts, wells cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 mtr including disposal of excavated material as directed (all kinds of soil)
Providing and laying of stone soling dully hand packed including carriage of soling with loading unloading and stacking complete.
Providing and laying in position cement concrete of specified grade excl. the cost of centering and shutering. All work upto plinth level 1:4:8 (1cement: 4fine sand: 8 graded stone aggregate 40mm nominal size)(Crushed). Including carriage of all materials involved with loading unloading and stacking complete.
Random rubble messonery with hard stones from quarry in foundation in plinth including levelling up with cement concrete 1:6:12 (1 cement: 6 coarse sand : 12 graded stone Agg 20mm nominal size) upto plinth level with cement mortar 1:6 (1 cement : 6 coarse sand) including carriage of all materials involved with loading unloading and stacking complete.
Dry random rubble masory with hard stone in foundation and plinth: using quarry stone with bond stone including carriage of stones from Athwajan with loading unloading and stacking complete
Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement :2 coarse sand : 4 graded stone aggregate 20 mm nominal size) Crushed Including carriage of all materials involved with loading unloading and stacking complete.
Part-3…(B)……... Parapets in Stone Masonary.
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc (Not exceeding 1.5 Mtr in width) and for shafts, wells cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 mtr including disposal of excavated material as directed (all kinds of soil)
Providing and laying of stone soling dully hand packed including carriage of soling with loading unloading and stacking complete.
Random rubble messonery with hard stones from quarry in foundation in plinth including levelling up with cement concrete 1:6:12 (1 cement: 6 coarse sand : 12 graded stone Agg 20mm nominal size) upto plinth level with cement mortar 1:6 (1 cement : 6 coarse sand) including carriage of all materials involved with loading unloading and stacking complete.
Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement :2 coarse sand : 4 graded stone aggregate 20 mm nominal size) Crushed Including carriage of all materials involved with loading unloading and stacking complete.
Part-4------------Extension to 2.0M Span RCC Box Type Culvert.
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc (Not exceeding 1.5 Mtr in width) and for shafts, wells cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 mtr including disposal of excavated material as directed (all kinds of soil)
Providing and laying of stone soling dully hand packed including carriage of soling with loading unloading and stacking complete.
Providing and laying in position cement concrete of specified grade excl. the cost of centering and shutering. All work upto plinth level 1:4:8 (1cement: 4fine sand: 8 graded stone aggregate 40mm nominal size)(Crushed). Including carriage of all materials involved with loading unloading and stacking complete.
Providing and laying in postion spacified grade of reinforced cement concrete excluding the cost of centering, shuttering,finishing and reinforcement All work upto required level 1:1.5:3 (1cement:1.5 coarse sand: 3 graded stone aggregate 20mm nominal size)(Crushed). Including carriage of all materials involved with loading unloading and stacking complete.
Reinforcement for R.C.C work including straightening cutting, bending placing in position and binding all complete. Thermo-Mechanically Treated bars.Including carriage of all materials involved with loading unloading and stacking complete.
Centring and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached plasters, buttresses, plinth and string courses etc.
Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs landings, balconies and acess platform.
Supply and filling of Nallah boulders dully hand packed including carriage of Nallah boulders with loading unloading and stacking complete
Part-5---------------Construction of PCC side Drain.
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc (Not exceeding 1.5 Mtr in width) and for shafts, wells cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 mtr including disposal of excavated material as directed (all kinds of soil)
Providing and laying of stone soiling dully hand packed including carriage of stone soling with loading unloading and stacking complete.
Providing and laying in position cement concrete of specified grade excl. the cost of centering and shutering. All work upto plinth level 1:4:8 (1cement: 4fine sand: 8 graded stone aggregate 40mm nominal size)(Crushed). Including carriage of all materials involved with loading unloading and stacking complete.
Providing and laying in position cement concrete of specified grade excl. the cost of centering and shutering. All work upto plinth level 1:3:6 (1cement: 3 fine sand: 6 graded stone aggregate 20mm nominal size)(Crushed). Including carriage of all materials involved with loading unloading and stacking complete.
Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete.
Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with floating coat of neat cement including cement slurry, but excluding the cost of noising of steps etc. complete. 50mm thick 20 mm nominal size stone aggregate Including carriage of all materials involved with loading unloading and stacking complete.
12mm Cement Plaster of mix: 1:4 (1 cement : 4 fine sand) Including carriage of all materials involved with loading unloading and stacking complete.
Part-6 -------------Macadamization and Development of Berm.
Providing, laying, spreading and compacting graded stone spacified grading to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site for all leads and lifts laying in uniform layers with mechanical paver finisher sub-base/base course and well prepared surface and compacting with vibratory roller of 8-10 tonne capacity to achieve the desired density (clause 406 of MORTH Specifications)
Providing and applying tack coat using hot straight run bitumen of grade VG-10 including heating the bitumen with spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road the existing road surface to remove all dirt dust, mud etc finally bromming. (Clause 503 of MoRTH Specification).WBM surface @ 0.75 Kg/Sqm
Providing and laying bituminous macadam 50 mm compacted thick with 100-120 TPH Hot Mix Plant producing an averrage output of 75 tonnes per hour base course with stone agg.of quality size and grading as specified in CPWD specifications and straight run bitumen of grade VG-10 @ 3.3% by weight of total mix including Hot mixing of stone agg. and bitumen in Hot mix plant, transporting mixed material and laying mixed with paver finisher to the required level and grade, rolling with road roller of 8-10 ton capacity to achieve the required compaction and density as per cluse 501.6 and 501.7 (50mm compacted thickness complete) including cost and carriage of all materials involved. (Clause 504 of MORTH Specifications)
Providing, laying 25mm thick (compacted) semidense bituminous concrete using mineral agg. satisfying the gradation set out in specifications with 5% binder content (by weight of total mix) bitumen of grade VG-10 with the aid of Hot mix plant and paver finisher including rolling with 8-10 Ton capacity to achieve the required compaction and density including cost and carriage of all materials involved.(Clause 508 of MoRTH Specification)
Providing and laying 6mm thick seal coat of premixed fine aggregate (Passing 2.36mm and retained on 180 micron sieve) with bitumen using 128 Kgs of bitumen of grade VG-10 bitumen per cum of fine aggregate (0.768 Kg of bitumen/Sqm) and 0.60 cum of fine aggregate per 100 sqm of road surface incl. rolling and finishing complete including cost and carriage of all materials involved.(Clause 513 of MoRTH Specification)
Supply and filling of Khak Bajri including ramming, dressing, watering and consolidation with Power Road Roller (8-10 Tonne to regquired gradient and camber including all carriages with loading, un-loading, stacking etc.
RIYAZ AHMAD BHAT
M/S GH MOHI-UD-DIN DAR
M/S VALLEY ROAD CONSTRUCTION COMPANY
M/S DAR AND BROTHERS PROP. GH MOHD DAR
NAZIR AHMAD WANI
M/S ULTRA TECH ENGINEERING
stage.html
html • 0.03 MB
finance_238760.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .