| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹11.4 LAccepted-AOC | ₹11.4 L | L-1 | Accepted-AOC As per the rate quoted in the financial bid. |
| 2 | L-2₹11.6 L+₹26,294 (2.31%)Rejected-Finance | ₹11.6 L+₹26,294 (2.31%) | L-2 | Rejected-Finance As per the rate quoted in the financial bid. |
| 3 | L-3₹11.6 L+₹26,294 (2.31%)Rejected-Finance | ₹11.6 L+₹26,294 (2.31%) | L-3 | Rejected-Finance As per the rate quoted in the financial bid. |
| 4 | L-4₹12.1 L+₹69,707 (6.12%)Rejected-Finance | ₹12.1 L+₹69,707 (6.12%) | L-4 | Rejected-Finance As per the rate quoted in the financial bid. |
| 5 | L-4₹12.4 L+₹97,237 (8.54%)Rejected-Finance BACHHALA PO BACHHALO LAFRIPADA DIST JAGATSINGPUR 754113 ODISHA | JAGATSINGHAPUR | ODISHA | 754113 | ₹12.4 L+₹97,237 (8.54%) | L-4 | Rejected-Finance As per the rate quoted in the financial bid. |
Tender Value
₹17.6 L
EMD Value
₹17,647
Closing Date
17 Jul 2026, 5:00 pmClosed
Superintending Engineer-III, BDA, Bhubaneswar
Office of the Superintending Engineer-III, BDA, Bhubaneswar
Construction of Metal Roof Yoga Platform at Rental Colony Park, Bhubaneswar
2026_BDABU_134928_1
BDA /634/SE-III/2026-27, Dated-04/07/2026
Open Tender
Civil Works - Others
Percentage
60 days
Bhubaneswar
Please refer Tender documents.
3 documents required · 3 mandatory
₹7,080
₹17,647
Yes
7 Sept 2026
8 Jul 2026
18 Jul 2026
8 Jul 2026
17 Jul 2026
12 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation upto 1.50mtr depth of foundation trenches for columns, basement, tie beams, walls and steps in all kinds of soil including moorum, hard stony earth, earth mixed with boulders etc but not requiring blasting with initial leads and lifts including dressing and leveling the bed sides up to required depth and depositing the excavated materials at places away from the work site with T&P for shoring, shuttering, dewatering if required etc. complete as per the drawing, design including cost of all labour, T&P etc. as required for the work complete as directed by the Engineer-in-charge. | 32.19 | CUM | 311.53 | ₹10,028.15 |
| 2 | Supplying and filling the Foundation & Plinth with clean coarse river sand of approved quality from approved quarry, laying in layers not exceeding 150mm thick, watering and ramming including cost, conveyance, royalty of all materials, cost of all labour, T&P etc. as required for the work complete as per direction of the Engineer-in-charge. | 33.85 | CUM | 534.84 | ₹18,104.33 |
| 3 | Providing & laying P.C.C. of prop.(1:4:8) in F & P, fountain, pathway toe wall, fountain base, base of column using 40mm nominal size down graded, screend, washed hard black cursher broken granite metal of approved quality & from approved quarry including laying in the layers hoisting, lowering, laying, watering and curing etc. complete to the requaired levels including cost, conveyance, royalty of all materials, cost of all labour, T&P etc. as required for the work complete and as per direction of Engineer-in-charge. | 9.85 | CUM | 5,762.74 | ₹56,762.99 |
| 4 | Providing & laying CC of prop. (1:2:4) using 12mm to 20 mm nominal size down graded, screened, washed hard black crusher broken granite chips of approved quality & from approved quarry, watering and curing etc. complete including cost, conveyance, royalty of all materials, cost of all labour, T&P etc. as required for the work complete and as per direction of Engineer-in-charge. | 6.62 | CUM | 7,661.95 | ₹50,722.11 |
| 5 | Brick work with Fly Ash Brick in cement mortar ( 1:6) in Foundation & plinth with best quality bricks of size 25cm x 12cm x 8cm having minimum crushing strength from 75 Kg/cm2 wih dimension tolerance +2% immersing (well shaped, uniform in size) includes molding, chamfering, corbelling complete as per drawing, design and specification, watering and curing for 7 days including cost, conveyance, royalty and taxes of all materials, labour, T&P etc. and as per direction of Engineer-in-charge. | 7.3 | CUM | 5,624.91 | ₹41,061.84 |
| 6 | Providing 12mm thick cement plaster in cement mortar of proportion (1:6) over even surface of brick work after racking out the joints finished smooth to proper line and plumb, watering, curing for 7 days with cost, conveyance, royalties, of all materials, cost of all labour, T&P etc. as required for the work complete as per direction of the Engineer-in-charge. | 47.7 | SQM | 188.22 | ₹8,978.09 |
| 7 | Supply, fitting and fixing of tiles in floors treads or steps and landing on 25mm thick bed of C.M. 1:1 (1 cement : 1 sand) jointed with neat cement slurry mixed with pigment to match the shades on the tiles etc. complete including cost of all materials, labour etc. all complete as required for the work and direction of Engineer-in-charge. (For Kota Stone Flooring above to 0.1 Sqm.) | 85.14 | SQM | 1,303.35 | ₹1,10,967.22 |
| 8 | Providing & applying Two coat weather coat of exterior grade of approved make and shade an even finished surface over a coat of primer at all height with all scaffolding and staging charges including cost, conveyance of all materials and cost of all labour, sundries and T&P etc. required for the work complete as directed by the Engineer in charge. | 47.7 | SQM | 185.47 | ₹8,846.92 |
| 9R.C.C. work of M-20 having minimum compressive strength of 200kg./cm2 in 15cm cubes at 28 days and in accordance with I.S. 456 and I.S. 516 using crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary as per direction of the Engineer-in-charge including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per direction of Engineer-in-charge (but excluding cost of M.S. rod/Tor steel and binding wires and labour charges for bending, binding and tying the grills. | |||||
| 9.01 | Column Footing | 2.17 | CUM | 6,495.17 | ₹14,094.52 |
stage.html
html • 0.08 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_600404.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.57 MB
DTCNmetalroofRENTAL.pdf
Tender Documents • 0.99 MB
BOQ_600404.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .