| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 CrAdmitted-Finance 5 E B 607003 | CUDDALORE | TAMIL NADU | 607003 | ₹4.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.2 Cr+₹5.8 L (1.38%)Admitted-Finance NO 16 THIRUVALLUVAR SALAI CHINNATHIRUPATHI SALEM 638 008 | SALEM | SALEM | TAMIL NADU | 638008 | ₹4.2 Cr+₹5.8 L (1.38%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SAI SAKTHI AND CO L2 | DEVI CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing the bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out of water shoring shutting walling and forming protective bunds wherever necessary etc. | 5,387 | m3 | 150 ₹8,08,050 | 140 ₹7,54,180 Lowest |
| 2.00 | Cement concrete 1:4:8 mix using 40mm gauge hard broken granite stone jelly for foundation including watering necessary and laid layers not more than 15cm thick compacting etc complete complying with standard specification and as desired (SS No 28) | 671 | m3 | 5,300 ₹35,56,300 | 5,260 ₹35,29,460 Lowest |
| 3.00 | Supply of materials for centering for so fits of all RCC slab or plain surface including strutting to 3m height using MS Sheet of size 90cm x 60cm and BG 10 gauge stiffened with welded MS angles of size 25mm x 25mm x 3mm laid over silver okay joist of size 10cm x 6.5cm spaced at about 90cm c/c and supported by Casuarinas props of 10cm to 13cm and spaced at 75cm c/c removing the same after specific period or as directed by the departmental officers etc complete for hire basis as per standard specification. | 17,543 | m2 | 320 ₹56,13,760 | 306 ₹53,68,158 Lowest |
| 4.00 | RCC Slab culvert sides | 3,183 | m2 | 630 ₹20,05,290 | 625 ₹19,89,375 Lowest |
| 5.00 | Plain Cement Concrete 1:2:4 (one cement, two fine aggregates and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 2,232 | m3 | 6,625 ₹1,47,87,000 | 6,623 ₹1,47,82,536 Lowest |
| 6.00 | Finishing the top of floor with Granolithic Finish with CC 1: 2: 4 (one cement, two sand & four HBG jelly) using chips of grade 10 mm and below for 25mm thickness and rubbed smooth etc, complete as per standard specification | 2,739 | M2 | 165 ₹4,51,935 | 162 ₹4,43,718 Lowest |
| 7.00 | Supplying fabricating and placing in position and delivery of MS or RTS rods including cost and convenience of materials to site and all labour charges for cutting , bending tying and placing and position etc complete as per standard specification. | 44,960 | Kg | 91 ₹40,91,360 | 88.8 ₹39,92,448 Lowest |
| 8.00 | Providing and laying in position, Standardised Concrete Mix M-20 Grade in accordance with IS:456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/mᶾ and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m.) 7670 kg. of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (No separate payment will be made by the Department for the excess usage of materials) | 562 | m3 | 8,150 ₹45,80,300 | 8,090 ₹45,46,580 Lowest |
| 9.00 | GST 18% | 1 | Percentage | 64,60,919 ₹64,60,919 | 63,73,162 ₹63,73,162 Lowest |
Tender Value
₹4.3 Cr
EMD Value
₹4.3 L
Closing Date
21 Sept 2023, 3:00 pmClosed
COMMISIONER, VADALUR MUNICIPALITY
COMMISIONER, VADALUR MUNICIPALITY
CONSTRUCTION OF STORM WATER DRAIN TO MARIYAMMAN KOIL ROAD, PATTAI STREET, SERAKUPPAM MAIN ROAD,NAGAPPASAMY NAGAR, BHARATHIDHASAN NAGAR AND MAIN ROAD, M.K.K NAGAR, KOTTAKARAI EAST CROSS 4 AND 2, MARUTHY NAGAR EXT25,EXT26, PARVATHI PURAM MAIN ROAD
2023_MAWS_363424_1
809/2023/E1
Open Tender
Civil Works
Works
180 days
VADALUR MUNICIPALITY
...
2 documents required · 2 mandatory
₹0
₹4.3 L
MUNICIPAL OFFICE, VADALUR MUNICIPALITY
3 Oct 2023
28 Aug 2023
21 Sept 2023
28 Aug 2023
21 Sept 2023
28 Aug 2023
29 Aug 2023
Amount
Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing the bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out of water shoring shutting walling and forming protective bunds wherever necessary etc.
Cement concrete 1:4:8 mix using 40mm gauge hard broken granite stone jelly for foundation including watering necessary and laid layers not more than 15cm thick compacting etc complete complying with standard specification and as desired (SS No 28)
Supply of materials for centering for so fits of all RCC slab or plain surface including strutting to 3m height using MS Sheet of size 90cm x 60cm and BG 10 gauge stiffened with welded MS angles of size 25mm x 25mm x 3mm laid over silver okay joist of size 10cm x 6.5cm spaced at about 90cm c/c and supported by Casuarinas props of 10cm to 13cm and spaced at 75cm c/c removing the same after specific period or as directed by the departmental officers etc complete for hire basis as per standard specification.
RCC Slab culvert sides
Plain Cement Concrete 1:2:4 (one cement, two fine aggregates and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Finishing the top of floor with Granolithic Finish with CC 1: 2: 4 (one cement, two sand & four HBG jelly) using chips of grade 10 mm and below for 25mm thickness and rubbed smooth etc, complete as per standard specification
Supplying fabricating and placing in position and delivery of MS or RTS rods including cost and convenience of materials to site and all labour charges for cutting , bending tying and placing and position etc complete as per standard specification.
Providing and laying in position, Standardised Concrete Mix M-20 Grade in accordance with IS:456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/mᶾ and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m.) 7670 kg. of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (No separate payment will be made by the Department for the excess usage of materials)
SAI SAKTHI AND CO
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
bid1.pdf
Tender Documents • 0.79 MB
BOQ_433270.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .