| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹16.3 LAccepted-Finance | L-1 | Accepted-Finance Workable | |
| 2 | L-2₹22.3 L+₹6.0 L (36.7%)Rejected-Finance | L-2 | Rejected-Finance Above Rates | |
| 3 | L-3₹28.0 L+₹11.7 L (71.6%)Rejected-Finance | L-3 | Rejected-Finance Above Rates | |
| 4 | L-4₹28.6 L+₹12.3 L (75.4%)Rejected-Finance | L-4 | Rejected-Finance Above Rates | |
| 5 | L-5₹29.3 L+₹13.0 L (79.4%)Rejected-Finance | L-5 | Rejected-Finance Above Rates |
Tender Value
₹48 L
EMD Value
₹48,000
Closing Date
18 Jun 2020, 2:00 pmClosed
SE,EWC, Gorakhpur
SE, EWC, Shrirampuram, Mohaddipur, Gorakhpur.
Construction of 33 KV underground line on XLPE Cable for Medical College Deoria
2020_PVVNV_479351_1
01/EWC(G)/2020-21
Open Tender
Electrical Works
Item Wise
90 days
Deoria Town
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
Superintending Engineer, EWC, Gorakhpur
₹48,000
Yes
2 Mar 2021
4 Jun 2020
19 Jun 2020
4 Jun 2020
18 Jun 2020
4 Jun 2020
Amount
MATERIAL (Part A)
33 KV. Top channel ( 125x65mmX3200 mm ( 10.7 Kg/m) .
11 KV Top channel ( 100x50mmX2240 mm).
M.S. Angle Iron 65x65x6mm bracing.
Number Plate With Clamps.
Danger Board with Clamps.
Barbed wire.
Bolts, Nuts, & Washers.
Stay Rod 20x1800 mm.
Stay wire 7/8 SWG.
G.I. Pipe Holding Claimp.with Nut&Blots.50x8mm.
Stay Clamp for ST Pole 9 mtr. with Nut and Bolt by 50x8 mm MS Flat Iron make.
33 KV M.S. bracing Angle clamp with nut bolt ( Top side) for ST Pole 9 mtr with nut bolt by 50x8 mm MS flat Iron make.
33 KV M.S. bracing Angle clamp with nut bolt ( Bottom side) for ST Pole 9 mtr with nut bolt by 50x8 mm MS flat Iron make.
11 KV Top channel clamp with nut bolt for ST Pole 9 mtr with nut bolt by 50x8 mm MS flat Iron make.
HDPE pipe 160 mm dia, thickness 9.5mm.
Work (Part B)
Shifting,Loading Carriage & Unloading of following materials from store centre Deoria to work site .
ST Pole 9 mtr.
ACSR DOG Conducter.
Petty Matterials.
33 KV ‘XLPE’ Cable 3x300mm².
Laying of 33 KV 3x300 mm² ‘XLPE’ cable 350 mtrs length x 2 (Double Circuit) =700 mtrs by digging pit & making trench in Proper size(1.2 M depth x1M wide) below ground level by fixing bricks(4½˝)on both side of trench wall and 9˝ brick work at the centre of the trench along the cable.Fixing brick slab on top after filling sand around both the cable including cost of bricks As per required specification of UPPCL RESSPO Norms.
Laying of 33 KV 3x300 mm² ‘XLPE’ cable 2000 mtrs length x 2 (Double Circuit) =4000 mtrs by HDD Method without HDPE pipe in Proper size(1.2 M depth x1M wide) below ground level. As per required specification of UPPCL RESSPO Norms.
Laying of 33KV ‘XLPE’ cable in air after providing 6” dia. G.I. (B Class) pipe 3 m long Complete work with supply and fixing of 33 KV Bracing angle on double Pole .
Laying of HDPE pipe 160 mm dia, thickness 9.5mm for passing of 33 KV Cable for crossing of road in the path of 33 KV Line by HDD Method .
Chemical Earthing Complete for Cable jointing Kit with materials.
Erection of Double pole structure on 9 mtr ST Pole for one side overhead line and one site underground line including all works of evocation of pit, pole erection,proper ramming & fitting of all accessories (M.S. angle iron 65 x 65 x 6 mm bracing with clamps, top channel 100 x 50 x 2240 mm with clamps, earthing, etc. complete).
Laying, spreading, lifting and final sagging of 3 phases of ACSR Dog conductor in accordance with profile and sag chart including binding, Jumpering and fixing of P.G. Clamp as per requirement in 03 Nos. conductor in parallel.
Making plinth for poles 30 cm above , grouting in the ratio 1:4:8 (cement, sand, 40mm brick ballast),back filling of earth etc. complete). As per required specification of UPPCL RESSPO Norms.
Painting of ST Poles with two coats of Alluminium paint and red oxide paint As per required specification of UPPCL RESSPO Norms.
Fixing of barbed wire on ST Pole as per proper specification.
Fixing of danger board on ST Pole as per proper specification.
Fixing of number plate on Double pole 9 mm Long.
Jointing charges of 33 KV ‘XLPE’ C/J Kit 3x300mm² Outdoor/ Indoor.
Carriage& erection of 33 KV Metering Cubicle etc. Complete work.
Erection of Cable stand suitable for 33 KV XLPE cable 3x300mm². hanging at 132 KV S/S.
Installation of 33 KV PPMC and Pole Mounted CT/ PT Unit.
Grouting of stay rods (20 x 1800) mm including all work of excavation, cement concrete in size (0.60 x 0.60 x 0.30) m in ratio 1:4:8 cement, sand, 40mm brick ballast) as per drg including back filling, proper ramming etc. Fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing.
Providing 33 KV Cable Route Marker & inserting in ground with proper grouting (Provided by Contractor & Cable Route Marker is made by stone Plate) .
Making H.T. Connections of the proposed line, on to the existing 33 KV bay/line from where line is eminating and another at the end of line to the existing 33 KV line .The work consists of fixing of tension fitting, insulators, jumpering, clamping and binding etc. at the end as per site conditions.
UP ENTERPRISES
M/S SHUKLA ENTERPRISES
BALAJI ELECTRICAL AND CONTRACTOR
V.K. TRADERS
HARIOM ENTERPRISES
M/s Anil kumar singh
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .