Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAdmitted-Finance | ₹4.2 L | L1 | Admitted-Finance |
| 2 | L2₹4.2 L+₹1,905.30 (0.45%)Admitted-Finance | ₹4.2 L+₹1,905.30 (0.45%) | L2 | Admitted-Finance |
| 3 | L3₹4.5 L+₹29,247.30 (6.96%)Admitted-Finance | ₹4.5 L+₹29,247.30 (6.96%) | L3 | Admitted-Finance |
| 4 | L4₹5.0 L+₹83,531.91 (19.9%)Admitted-Finance | ₹5.0 L+₹83,531.91 (19.9%) | L4 | Admitted-Finance |
| 5 | L5₹5.0 L+₹84,300.80 (20.0%)Admitted-Finance | ₹5.0 L+₹84,300.80 (20.0%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ABDUL MUJEEB P L5 | C H Kunhikoya L4 | MOHAMMED MP L8 | MOHAMMED NAVAB SHAH C G L7 | Mohammed Rafeeq L3 | MOHAMMED ALI AKBER P L2 | ABDUL SHUKOOR CP L9 | irshad L6 | Saleem Khan A P L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratchesetc. complete | 1,117.7 | Sqm | 30 ₹33,531 | 13.75 ₹15,368.38 | 15 ₹16,765.5 | 2 ₹2,235.4 Lowest | 10 ₹11,177 | 10 ₹11,177 | 25 ₹27,942.5 | 11 ₹12,294.7 | 10 ₹11,177 |
| 2.00 | Finishing walls with water proofing cement paint of required shade : Old work (one or more coats applied @2.20kg/10 sqm) over priming coat of primer applied @0.80 litrs/10sqm complete including cost of Priming coat. | 1,117.7 | Sqm | 120 ₹1,34,124 | 90 ₹1,00,593 | 140 ₹1,56,478 | 110 ₹1,22,947 | 170 ₹1,90,009 | 95 ₹1,06,181.5 | 190 ₹2,12,363 | 120 ₹1,34,124 | 76 ₹84,945.2 Lowest |
| 3.00 | Repairs to plaster of thickness 12mm to 20mm in patches of area 2.5sq.metres and under including cutting the patch in proper shape, rakingout joints and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground within 50metres lead: Cement mortar 1:4 | 48.84 | Sqm | 800 ₹39,072 | 800 ₹39,072 | 800 ₹39,072 | 550 ₹26,862 | 500 ₹24,420 Lowest | 600 ₹29,304 | 700 ₹34,188 | 540 ₹26,373.6 | 650 ₹31,746 |
| 4.00 | Dismantling roofing including ridges, hips valleys and gutters etc., and stacking the material within 50 metres lead of: G.S Sheet | 10.66 | Sqm | 300 ₹3,198 | 400 ₹4,264 | 100 ₹1,066 | 10 ₹106.6 Lowest | 200 ₹2,132 | 200 ₹2,132 | 250 ₹2,665 | 127 ₹1,353.82 | 400 ₹4,264 |
| 5.00 | Providing corrugated G.S. sheet roofing including vertical/curved surface fixed with polymer coated JorL hooks, bolts and nuts 8mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead and including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete upto any pitch in horizontal/vertical or curved surfaces) excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. | 10.66 | Sqm | 1,400 ₹14,924 | 1,200 ₹12,792 Lowest | 2,000 ₹21,320 | 1,400 ₹14,924 | 1,500 ₹15,990 | 2,500 ₹26,650 | 2,000 ₹21,320 | 1,800 ₹19,188 | 2,000 ₹21,320 |
| 6.00 | Painting Steel work with Deluxe Multi surface paint to give an even shade. Two or more coats applied on @0.90ltr/10sqm) over under coat of primer applied@ 0.80 ltr/10 sqmof approved and manufacture | 2.78 | Sqm | 200 ₹556 | 240 ₹667.2 | 500 ₹1,390 | 80 ₹222.4 Lowest | 150 ₹417 | 500 ₹1,390 | 1,600 ₹4,448 | 166 ₹461.48 | 400 ₹1,112 |
| 7.00 | Painting Wood work with Deluxe Multi surface paint to give an even shade. Two or more coats applied on @0.90ltr/10sqm) over under coat of primer applied @0.75ltr/ 10sqm of approved and manufacture | 50.55 | Sqm | 200 ₹10,110 | 160 ₹8,088 | 190 ₹9,604.5 | 100 ₹5,055 Lowest | 130 ₹6,571.5 | 200 ₹10,110 | 600 ₹30,330 | 160 ₹8,088 | 160 ₹8,088 |
| 8.00 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50metres lead as per direction of Engineer in charge. 1:4:8 or leaner mix | 3.55 | Cum | 500 ₹1,775 Lowest | 1,083.53 ₹3,846.53 | 1,500 ₹5,325 | 1,000 ₹3,550 | 2,000 ₹7,100 | 1,000 ₹3,550 | 2,500 ₹8,875 | 2,100 ₹7,455 | 3,500 ₹12,425 |
| 9.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering --All work upto plinth level: 1:2:4 (1 cement : 2 M.Sand : 4 granite chips 20 mm nomoinal size) foundation and plinth | 3.55 | Cum | 15,000 ₹53,250 | 23,000 ₹81,650 | 14,000 ₹49,700 | 19,000 ₹67,450 | 16,000 ₹56,800 | 10,000 ₹35,500 Lowest | 16,000 ₹56,800 | 18,000 ₹63,900 | 17,000 ₹60,350 |
| 10.00 | Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying: (a) after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253
kg/sqm.
(b) laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10cm.
(c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/sqm mixed with water proofing cement compound @0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. Using rough kota stone. (d) fourth and final layer of brick tiling with cement mortar (which will be paid for separately. For the purpose of measurement the entire treated surface will be measured. | 131.4 | Sqm | 1,250 ₹1,64,250 | 1,200 ₹1,57,680 | 1,200 ₹1,57,680 | 2,000 ₹2,62,800 | 800 ₹1,05,120 Lowest | 1,000 ₹1,31,400 | 1,260 ₹1,65,564 | 1,300 ₹1,70,820 | 830 ₹1,09,062 |
Tender Value
₹6.8 L
EMD Value
₹13,641
Closing Date
4 Aug 2025, 3:00 pmClosed
Executive Engineer, LPWD Kavaratti
Executive Engineer, LPWD Kavaratti
Repair and Maintenance of Agricultural Demonstration Unit at Minicoy
2025_UTL_3057_1
NIT No. 52/NIT/EE Kvt/2024-25
Open Tender
Civil Works
Item Rate
30 days
Minicoy
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹13,641
14 Aug 2025
19 Jul 2025
4 Aug 2025
19 Jul 2025
4 Aug 2025
19 Jul 2025
Amount
Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratchesetc. complete
Finishing walls with water proofing cement paint of required shade : Old work (one or more coats applied @2.20kg/10 sqm) over priming coat of primer applied @0.80 litrs/10sqm complete including cost of Priming coat.
Repairs to plaster of thickness 12mm to 20mm in patches of area 2.5sq.metres and under including cutting the patch in proper shape, rakingout joints and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground within 50metres lead: Cement mortar 1:4
Dismantling roofing including ridges, hips valleys and gutters etc., and stacking the material within 50 metres lead of: G.S Sheet
Providing corrugated G.S. sheet roofing including vertical/curved surface fixed with polymer coated JorL hooks, bolts and nuts 8mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead and including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete upto any pitch in horizontal/vertical or curved surfaces) excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.
Painting Steel work with Deluxe Multi surface paint to give an even shade. Two or more coats applied on @0.90ltr/10sqm) over under coat of primer applied@ 0.80 ltr/10 sqmof approved and manufacture
Painting Wood work with Deluxe Multi surface paint to give an even shade. Two or more coats applied on @0.90ltr/10sqm) over under coat of primer applied @0.75ltr/ 10sqm of approved and manufacture
Demolishing cement concrete manually/by mechanical means including disposal of material within 50metres lead as per direction of Engineer in charge. 1:4:8 or leaner mix
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering --All work upto plinth level: 1:2:4 (1 cement : 2 M.Sand : 4 granite chips 20 mm nomoinal size) foundation and plinth
Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying: (a) after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. (b) laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10cm. (c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/sqm mixed with water proofing cement compound @0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. Using rough kota stone. (d) fourth and final layer of brick tiling with cement mortar (which will be paid for separately. For the purpose of measurement the entire treated surface will be measured.
Providing and fixing Cast Iron Gate in approved pattern with locking arrangement and neat finishing with deluxe multi surface paint including priming coat.
MOHAMMED ALI AKBER P (BID ID -10971)
Mohammed Rafeeq (BID ID -10922)
C H Kunhikoya (BID ID -10947)
ABDUL MUJEEB P (BID ID -10965)
irshad (BID ID -10968)
MOHAMMED NAVAB SHAH C G (BID ID -10962)
MOHAMMED MP (BID ID -10958)
ABDUL SHUKOOR CP (BID ID -10956)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .