| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹22.1 LAccepted-AOC | ₹22.1 L | 1 | Accepted-AOC lesser the estimate rate |
| 2 | 2₹23.3 LRejected-Finance MOULIVAKKAM 116 | NAGAPATTINAM | TAMIL NADU | 608002 | ₹23.3 L | 2 | Rejected-Finance higher the estimate rate |
| Sl No | Description | Qty | Unit | GOOD CARE ENVIRO SYSTEM PVT LTD L2 | KARTHICK CONTRACTOR & MATERIAL SUPPLIERS L1 |
|---|---|---|---|---|---|
| 1.00 | Removal of the Black Topped (BT) surface to 50 to 70mm depth using Milling machine, including conveying the milled waste materials away from the worksite to an average distance including hire and running charges for the machine, conveyance charges, unload | 4,965 | M2 | 91 ₹4.5 L | 86.56 ₹4.3 L |
| 2.00 | Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications | 4,965 | M2 | 30 ₹1.5 L | 28.45 ₹1.4 L |
| 3.00 | Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cu.m of 19.00-9.50mm, 0.17 cu.m of 9.50-2.36mm and 0.26 cu.m of 2.36 and below with 47.28kgs of VG40 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 149 | M3 | 11,586 ₹17.3 L | 11,033 ₹16.4 L |
Tender Value
₹26.5 L
EMD Value
₹26,500
Closing Date
5 Mar 2026, 3:00 pmClosed
commissioner
13,sendurai main rd,elil nagar,dindigul
TNCRUDP Fund-IMPROVEMENT OF BT SURFACE AT R.M.COLONY 3RD CROSS STREET WEST CROSS STREET 1(078003R099)LAXMANAPURAM 2ND LANE(078009R347)CHELLANDIAMMAN KOIL 3RD STREET(078010R375) NARAYANA NAGAR MAIN ROAD(078012R1309)IN DCMC
2026_MAWS_666791_4
2855/2023/E4
Open Tender
Civil Works
13, sendurai main rd, elil nagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹26,500
5 May 2026
26 Feb 2026
5 Mar 2026
26 Feb 2026
5 Mar 2026
26 Feb 2026
Removal of the Black Topped (BT) surface to 50 to 70mm depth using Milling machine, including conveying the milled waste materials away from the worksite to an average distance including hire and running charges for the machine, conveyance charges, unload
Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cu.m of 19.00-9.50mm, 0.17 cu.m of 9.50-2.36mm and 0.26 cu.m of 2.36 and below with 47.28kgs of VG40 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_801035.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
BOQ_801035.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid