Loading…
Loading…
Tender Value
₹39.9 L
EMD Value
₹79,780
Closing Date
6 Oct 2026, 5:00 pm
Executive Engineer RNB Division Chadoora
CHADOORA
Construction of Boundary wall at HS Buzgoo.
2026_PWDJK_326169_2
NIT NO 74
Open Tender
Civil Works
Percentage
45 days
CHADOORA
AS PER NIT
4 documents required · 4 mandatory
₹1,100
Yes
Executive Engineer RNB Division Chadoora
₹79,780
Yes
26 Sept 2026
26 Sept 2026
7 Oct 2026
26 Sept 2026
6 Oct 2026
26 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres. All kinds of soil | 117.45 | cum | 256.85 | ₹30,167.03 |
| 2 | Providing and laying of 75mm stone soling in trenches hand packed including all leads, lifts, loading, unloading, dressing, head load, ramming with iron rammer all carriage of materials involved from approved nearest sources to site of work(all complete). | 21.75 | cum | 1,000 | ₹21,750 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 21.75 | cum | 5,202.9 | ₹1,13,163.08 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size | 208.8 | cum | 5,733.6 | ₹11,97,175.68 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 696 | Sqm | 286.35 | ₹1,99,299.6 |
| 6 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in :Cement mortar 1:6 ( 1 cement : 6 coarse sand) Extra for brick work with common burnt clay bricks/cement concrete bricks in
superstructure upto floor five level | 154.36 | cum | 9,027.2 | ₹13,93,438.59 |
| 7 | 12 mm thick cement plaster of mix 1 : 6 ( 1 cement : 6 fine sand) | 1,705.65 | sqm | 266.2 | ₹4,54,044.03 |
| 8 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with. 1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) | 14.7 | Cum | 9,106.5 | ₹1,33,865.55 |
| 9 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | 520.3 | Kg | 181.6 | ₹94,486.48 |
| 10Carriage of materials by MT from source to site of work including loading unloading complete. | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.12 MB
BOQ_1102832.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .