Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-Finance | ₹8.3 L | L1 | Accepted-Finance L1 |
| 2 | L2₹8.7 LRejected-Finance VILLAGE GONNAN GARH DISTRICT AMROHA UTTAR PRADESH | AMROHA | UTTAR PRADESH | ₹8.7 L | L2 | Rejected-Finance L2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Self Declaration Certificate is not enclosed |
| Sl No | Description | Qty | Unit | JAGDESH PRASAD L1 | M/S SHIV KUMAR CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth into the trenches or into the space between the structure and the side of foundation trenches or into the plinth with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of labour, all T & P, leads and lift etc complet. | 140 | CUM | 60 ₹8,400 | 65 ₹9,100 |
| 2.00 | Providing and Laying M-10 (C.C.1:3:6) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | 20.61 | CUM | 4,500 ₹92,745 | 4,700 ₹96,867 |
| 3.00 | Providing and Laying C.C. M-15(1:2.4) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | 5.46 | CUM | 4,500 ₹24,570 | 4,800 ₹26,208 |
| 4.00 | Providing and Laying first class M-150 brick work in (1:4 ) cement mortar including cost of all materials, labour T & P, all lifts and leads etc. complete. | 69.13 | CUM | 4,600 ₹3.2 L | 4,800 ₹3.3 L |
| 5.00 | Providing and Laying R.C.C. M-20(1:1.5:3) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | 18.35 | CUM | 4,700 ₹86,245 | 4,700 ₹86,245 |
| 6.00 | Providing and Laying C.C. M-25(1:1:2) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | 2.5 | CUM | 4,800 ₹12,000 | 4,800 ₹12,000 |
| 7.00 | Providing and fixing Cantering & shuttering including cost of all material, labour, T&P, all lifts and leads, etc for proper completion of work . FOR CC WORK | 34.66 | SQM | 600 ₹20,796 | 700 ₹24,262 |
| 8.00 | Providing and fixing Cantering & shuttering including cost of all material, labour, T&P, all lifts and leads, etc for proper completion of work . FOR RCC WORK | 71.68 | SQM | 650 ₹46,592 | 800 ₹57,344 |
| 9.00 | Supply and fixing of 20mm expansion joint in slab between dirt wall and slab including cost all labour, T&P material etc complete as per direction of Engineer - in charge. | 10.2 | SQM | 750 ₹7,650 | 750 ₹7,650 |
| 10.00 | Providing and fixing steel reinforcement including cost of steel, binding wire, bending, binding, welding, cutting, placing in proper position, all lifts and leads ,all labour and T&P etc | 1.75 | MT | 60,000 ₹1.1 L | 60,000 ₹1.1 L |
Tender Value
Refer Docs
EMD Value
₹17,000
Closing Date
25 Apr 2026, 5:00 pmClosed
EE M G C C Div 8 Bulandshahr
M G C C Div 8 Bulandshahr
Lot 5 Construction of VRB at km. 0.700 of Chopa Shobhapur Minor
2026_UPIDC_1123632_7
05/EE/2025-26
Open Tender
Civil Works - Canal
120 days
SAMBHAL
2 documents required · 2 mandatory
₹856
₹17,000
Yes
4 May 2026
20 Apr 2026
27 Apr 2026
20 Apr 2026
25 Apr 2026
20 Apr 2026
20 Apr 2026 - 25 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth into the trenches or into the space between the structure and the side of foundation trenches or into the plinth with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of labour, all T & P, leads and lift etc complet. | - | CUM | - | - |
| 2 | Providing and Laying M-10 (C.C.1:3:6) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | 1 | CUM | - | - |
| 3 | Providing and Laying C.C. M-15(1:2.4) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | - | CUM | - | - |
| 4 | Providing and Laying first class M-150 brick work in (1:4 ) cement mortar including cost of all materials, labour T & P, all lifts and leads etc. complete. | 1 | CUM | - | - |
| 5 | Providing and Laying R.C.C. M-20(1:1.5:3) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | - | CUM | - | - |
| 6 | Providing and Laying C.C. M-25(1:1:2) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | - | CUM | - | - |
| 7 | Providing and fixing Cantering & shuttering including cost of all material, labour, T&P, all lifts and leads, etc for proper completion of work . FOR CC WORK | 1 | SQM | - | - |
| 8 | Providing and fixing Cantering & shuttering including cost of all material, labour, T&P, all lifts and leads, etc for proper completion of work . FOR RCC WORK | - | SQM | - | - |
| 9 | Supply and fixing of 20mm expansion joint in slab between dirt wall and slab including cost all labour, T&P material etc complete as per direction of Engineer - in charge. | 1 | SQM | - | - |
| 10 | Providing and fixing steel reinforcement including cost of steel, binding wire, bending, binding, welding, cutting, placing in proper position, all lifts and leads ,all labour and T&P etc | - | MT | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
TD5.pdf
Tender Documents • 2.26 MB
BOQ_2127260.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid