| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.8 CrAccepted-AOC NAGLA VATOOL POST NARUPURA ATRAULI DISTRICT ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹1.8 Cr Quoted ₹1.5 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹1.7 Cr+₹15.7 L (10.3%)Rejected-Finance 1 234 8 | ALIGARH | UTTAR PRADESH | 202001 | ₹1.7 Cr+₹15.7 L (10.3%) | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹1.7 Cr+₹16.8 L (11.0%)Rejected-Finance | ₹1.7 Cr+₹16.8 L (11.0%) | L-3 | Rejected-Finance L-3 |
| 4 | L-4₹1.9 Cr+₹32.9 L (21.6%)Rejected-Finance | ₹1.9 Cr+₹32.9 L (21.6%) | L-4 | Rejected-Finance L-4 |
| 5 | L-5₹1.9 Cr+₹41.3 L (27.1%)Rejected-Finance ALIGARH UTTAR PRADESH | ALIGARH | UTTAR PRADESH | 202001 | ₹1.9 Cr+₹41.3 L (27.1%) | L-5 | Rejected-Finance L-5 |
| Sl No | Description | Qty | Unit | VEERESH KUMAR L1 | rupendra kumar bhardwaj L3 | S F INFRA PROJECTS L5 | M/S UNITE ENTERPRISES L6 | Santosh Kumar Sharma L2 | DEV CONSTRUCTION L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in cutting or in embankment in ordinary soil exavation to be in the form of a regular pits not exceeding 0.50m in depth and earth work in embankmentto be in 20 cm layers including ramming and dressing the surface to required levels and slopes and also including 1.5m lift and 30 lead.The earth in from cutting to be used as spoil banks within 50m distance as per directed by engineer in charge. | 1,276.2 | M3 | 50 ₹63,810 | 100 ₹1,27,620 | 50 ₹63,810 | 72 ₹91,886.4 | 40 ₹51,048 Lowest | 50 ₹63,810 |
| 2.00 | Clearing thick bushes and thorny without uprooting. | 9,880 | M2 | 4.4 ₹43,472 | 10 ₹98,800 | 10 ₹98,800 | 12 ₹1,18,560 | 5 ₹49,400 | 1 ₹9,880 Lowest |
| 3.00 | Dismantling of flexible pavment and disposal of dismantled material upto a lead of 1000 meters,stacking seviceable and disposal of unseviceable materials separately within a lead of 50 mtr. As per direction of Engineer-in-Charge | 319.05 | M3 | 150 ₹47,857.5 | 100 ₹31,905 | 200 ₹63,810 | 745 ₹2,37,692.25 | 200 ₹63,810 | 1 ₹319.05 Lowest |
| 4.00 | Brick edging on both side of the road of M-150 bricks 8cm. (3") wide and 12cm (4½") deep laid with mud mortar including all labour and supply of brick finished to required template & ramming the excavated earth as directed by the Engineer-In-Charge. | 2.84 | km | 50,000 ₹1,42,000 | 70,000 ₹1,98,800 | 60,000 ₹1,70,400 | 45,000 ₹1,27,800 | 70,000 ₹1,98,800 | 40,000 ₹1,13,600 Lowest |
| 5.00 | Providing,laying,spreading and compacting stone aggregate of specific sizes(45 to 63 mm) to water bound macadam specification including spreading in uniform thicness, hand packing,rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstics of coarse aggregates,watering and compacting to the required density grading2 as per Technical clause 405(2) | 598.22 | M3 | 200 ₹1,19,644 | 100 ₹59,822 Lowest | 2,000 ₹11,96,440 | 2,900 ₹17,34,838 | 1,000 ₹5,98,220 | 1,500 ₹8,97,330 |
| 6.00 | Providing,laying,spreading and compacting stone aggregate of specific sizes(22.4 to 53 mm) to water bound macadam specification including spreading in uniform thicness, hand packing,rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstics of coarse aggregates,watering and compacting to the required density grading 3 as per Technical clause 405(3) | 997.03 | M3 | 1,000 ₹9,97,030 | 500 ₹4,98,515 Lowest | 2,100 ₹20,93,763 | 3,000 ₹29,91,090 | 1,500 ₹14,95,545 | 1,500 ₹14,95,545 |
| 7.00 | Providing and applying Tack coat with Bitumen VG-10 using distributor at the rate of 0.30Kg. per Sqm. on the prepared primed surface cleaned with Hydraulic broom as per Technical Specification. Clause 503, S.L.-5.20, of MORD specification | 53,175 | M2 | 10 ₹5,31,750 | 10 ₹5,31,750 | 15 ₹7,97,625 | 28 ₹14,88,900 | 20 ₹10,63,500 | 5 ₹2,65,875 Lowest |
| 8.00 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm. to 5.60 mm. aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a H.M. prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN. static roller capacity, finished to required level and grades to be followed by seal coat of Type-C as per Technical Specification. Clause 508, Case II-(i) | 53,175 | M2 | 190 ₹1,01,03,250 Lowest | 280 ₹1,48,89,000 | 220 ₹1,16,98,500 | 192 ₹1,02,09,600 | 200 ₹1,06,35,000 | 270 ₹1,43,57,250 |
| 9.00 | Providing,laying seal coat sealing the voids in a bitumenious surface laid to the specified levels, grade and cross fall using Type 'C' as per Technical Specification. Clause 510, S.L.- Case III- (i) | 53,175 | M2 | 60 ₹31,90,500 | 9 ₹4,78,575 Lowest | 60 ₹31,90,500 | 75 ₹39,88,125 | 50 ₹26,58,750 | 25 ₹13,29,375 |
Tender Value
₹2.6 Cr
EMD Value
₹5.2 L
Closing Date
6 Oct 2025, 3:00 pmClosed
S.E.Drainage Circle. Aligarh
Office Of S.E.Drainage Circle. Aligarh
Renewal of Service Road of Anoopshahar Branch From Km.162.000 to 176.180
2025_UPIDC_1077687_4
13/SE/DCA/2025-26
Open Tender
Civil Works - Roads
Item Wise
90 days
ALIGARH
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,523
₹5.2 L
03.10.2025
20 Nov 2025
30 Sept 2025
6 Oct 2025
30 Sept 2025
6 Oct 2025
30 Sept 2025
3 Oct 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .