| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹31.8 LAccepted-AOC AT BHEJAPUT PO DAMANJODI DIST KORAPUT ODISHA 763008 | KORAPUT | ODISHA | 763008 | ₹31.8 L | 1 | Accepted-AOC L1 |
| 2 | 2₹32.0 L+₹12,664 (0.40%)Rejected-AOC AT PO BHEJAPUT DAMANJODI KORAPUT 763008 | KORAPUT | ODISHA | 763008 | ₹32.0 L+₹12,664 (0.40%) | 2 | Rejected-AOC L2 |
| 3 | 3₹32.5 L+₹67,899 (2.13%)Rejected-AOC | ₹32.5 L+₹67,899 (2.13%) | 3 | Rejected-AOC L3 |
| 4 | 4₹33.1 L+₹1.3 L (3.99%)Rejected-AOC SATSANG MAIN ROAD BHEJAPUT DAMANJODI KORAPUT ODISHA 763008 | DAMANJODI | KORAPUT | ODISHA | 763008 | ₹33.1 L+₹1.3 L (3.99%) | 4 | Rejected-AOC L4 |
| 5 | 5₹34.6 L+₹2.8 L (8.73%)Rejected-AOC SATSANG BHEJAPUT DAMANJODI KORAPUT ODISHA 763008 | KORAPUT | ODISHA | 763008 | ₹34.6 L+₹2.8 L (8.73%) | 5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | M/S SADASHIV ENTERPRISES L18 | M/S RAHUL CONSTRUCTION L9 | S K ENGINEERING WORKS L16 | PADMANAV NAYAK L1 | M/S PALEI CONSTRUCTION L12 | M/S M H ZAMAN L5 | MD MASIHUZ ZAMAN L11 | M/S PURANDAR MALLICK L2 | M/S SOBHA BISOI L7 | M/s P.K.RAY L4 | DIPAK ENTERPRISES L17 | SURENDRANATH MALLICK L3 | M/s D.K JENA L14 | R AND B CONSTRUCTION L6 | BRAJA KISHORE DAS L8 | M/s GOURI CHANDRA MALI L15 | KETHAKI ENGINEERING CONSTRUCTION L10 | ASHOK KUMAR BEHERA L13 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | 2.8.1'Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m in all kinds of soil. | 130 | Cum | 239 ₹31,070 | 150 ₹19,500 | 150 ₹19,500 | 130 ₹16,900 | 150 ₹19,500 | 130 ₹16,900 | 149 ₹19,370 | 120 ₹15,600 | 146 ₹18,980 | 210 ₹27,300 | 205 ₹26,650 | 70 ₹9,100 Lowest | 140 ₹18,200 | 120 ₹15,600 | 146 ₹18,980 | 200 ₹26,000 | 148 ₹19,240 | 151 ₹19,630 |
| 2.00 | 2.9.1'Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m for soft rock up to 1.5 mtrs depth. | 30 | Cum | 249 ₹7,470 | 250 ₹7,500 | 250 ₹7,500 | 225 ₹6,750 | 200 ₹6,000 | 220 ₹6,600 | 200 ₹6,000 | 200 ₹6,000 | 200 ₹6,000 | 200 ₹6,000 | 145 ₹4,350 | 70 ₹2,100 Lowest | 160 ₹4,800 | 140 ₹4,200 | 200 ₹6,000 | 250 ₹7,500 | 200 ₹6,000 | 210 ₹6,300 |
| 3.00 | 2.9.3'Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m for hard rock up to 1.5 mtrs depth.( Blasting prohibated) | 30 | Cum | 269 ₹8,070 | 450 ₹13,500 | 250 ₹7,500 | 650 ₹19,500 | 250 ₹7,500 | 500 ₹15,000 | 250 ₹7,500 | 250 ₹7,500 | 250 ₹7,500 | 200 ₹6,000 | 135 ₹4,050 | 70 ₹2,100 Lowest | 500 ₹15,000 | 210 ₹6,300 | 250 ₹7,500 | 260 ₹7,800 | 250 ₹7,500 | 260 ₹7,800 |
| 4.00 | 2.25'Back Filling with available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 80 | Cum | 129 ₹10,320 | 90 ₹7,200 | 140 ₹11,200 | 50 ₹4,000 Lowest | 100 ₹8,000 | 105 ₹8,400 | 100 ₹8,000 | 50 ₹4,000 Lowest | 100 ₹8,000 | 150 ₹12,000 | 95 ₹7,600 | 50 ₹4,000 Lowest | 90 ₹7,200 | 75 ₹6,000 | 100 ₹8,000 | 190 ₹15,200 | 100 ₹8,000 | 102 ₹8,160 |
| 5.00 | 1.1.1'Transportation/carriage of balance excavated earth after back filling,building debrish,waste material,other garbage materials for disposal at the specified locations/areas,lead up to 2km as per the instruction of Engg-In-Charge. | 60 | Cum | 149 ₹8,940 | 120 ₹7,200 | 140 ₹8,400 | 71 ₹4,260 Lowest | 150 ₹9,000 | 110 ₹6,600 | 145 ₹8,700 | 150 ₹9,000 | 145 ₹8,700 | 250 ₹15,000 | 125 ₹7,500 | 200 ₹12,000 | 150 ₹9,000 | 115 ₹6,900 | 145 ₹8,700 | 300 ₹18,000 | 145 ₹8,700 | 155 ₹9,300 |
| 6.00 | 2.27'Filling of sand under floors in trenches, sides of foundations etc. including supply of sand and watering, ramming, consolidating and dressing etc. all complete as directed by the Engineer-in-Charge. | 15 | Cum. | 1,379 ₹20,685 | 1,000 ₹15,000 | 1,200 ₹18,000 | 950 ₹14,250 | 950 ₹14,250 | 1,250 ₹18,750 | 940 ₹14,100 | 850 ₹12,750 Lowest | 930 ₹13,950 | 1,000 ₹15,000 | 850 ₹12,750 Lowest | 1,000 ₹15,000 | 1,350 ₹20,250 | 850 ₹12,750 Lowest | 920 ₹13,800 | 1,900 ₹28,500 | 935 ₹14,025 | 970 ₹14,550 |
| 7.00 | 4.1.3'Providing and laying plain cement concrete at all depths below and upto ground level in foundations, fillings, non-suspended floors including tamping, curing etc. but excluding the cost of centering and shuttering etc. as specified or directed in any shape, position, thickness and finishing the top surface rough or smooth etc.all complete up to Plinth Level (CEMENT WILL BE ISSUED FREE OF COST AT NALCO'S STORE/ISSUE POINT INSIDE PLANT.) P.C.C 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 10 | Cum | 2,649 ₹26,490 | 3,200 ₹32,000 | 3,500 ₹35,000 | 3,000 ₹30,000 | 3,000 ₹30,000 | 2,900 ₹29,000 | 3,000 ₹30,000 | 3,100 ₹31,000 | 3,000 ₹30,000 | 3,100 ₹31,000 | 3,200 ₹32,000 | 2,300 ₹23,000 Lowest | 3,200 ₹32,000 | 2,750 ₹27,500 | 3,000 ₹30,000 | 3,000 ₹30,000 | 3,000 ₹30,000 | 3,100 ₹31,000 |
| 8.00 | 4.1.8'Providing and laying plain cement concrete at all depths below and upto ground level in foundations, fillings, non-suspended floors including tamping, curing etc. but excluding the cost of centering and shuttering etc. as specified or directed in any shape, position, thickness and finishing the top surface rough or smooth etc.all complete up to Plinth Level (CEMENT WILL BE ISSUED FREE OF COST AT NALCO'S STORE/ISSUE POINT INSIDE PLANT.) P.C.C.1:4:8 (1cement: 2coarse sand: 4graded stone aggregate 20 mm nominal size) | 15 | Cum | 2,749 ₹41,235 | 3,000 ₹45,000 | 3,500 ₹52,500 | 2,900 ₹43,500 | 3,000 ₹45,000 | 2,850 ₹42,750 | 3,000 ₹45,000 | 2,800 ₹42,000 | 2,900 ₹43,500 | 3,100 ₹46,500 | 3,200 ₹48,000 | 2,500 ₹37,500 Lowest | 3,100 ₹46,500 | 2,700 ₹40,500 | 2,890 ₹43,350 | 2,700 ₹40,500 | 2,950 ₹44,250 | 3,100 ₹46,500 |
| 9.00 | 4.1.13'P.C.C.1:2.5:4:11 (1 cement: 2.5 fly ash:4 course sand: 10 graded 40mm stone aggregate). | 20 | Cum | 2,779 ₹55,580 | 2,800 ₹56,000 | 3,800 ₹76,000 | 2,800 ₹56,000 | 3,500 ₹70,000 | 3,850 ₹77,000 | 3,450 ₹69,000 | 2,600 ₹52,000 | 3,350 ₹67,000 | 2,100 ₹42,000 Lowest | 3,100 ₹62,000 | 2,300 ₹46,000 | 2,800 ₹56,000 | 2,650 ₹53,000 | 3,300 ₹66,000 | 4,000 ₹80,000 | 3,400 ₹68,000 | 3,500 ₹70,000 |
| 10.00 | 4.17'Making plinth protection 50 mm thick of cement concrete 1:3:6 (1 cement:3 coarse sand : 6 graded stone aggregate 20 mm nominal size) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including finishing the top smooth,etc. all completed as per the instruction of Engg-In-Charge (CEMENT SHALL BE ISSUED FREE OF COST FROM NALCO'S STORE). | 120 | Sqm | 3,689 ₹4,42,680 | 380 ₹45,600 | 650 ₹78,000 | 280 ₹33,600 | 800 ₹96,000 | 385 ₹46,200 | 790 ₹94,800 | 250 ₹30,000 | 775 ₹93,000 | 310 ₹37,200 | 240 ₹28,800 | 120 ₹14,400 Lowest | 2,800 ₹3,36,000 | 650 ₹78,000 | 750 ₹90,000 | 750 ₹90,000 | 780 ₹93,600 | 810 ₹97,200 |
Tender Value
Refer Docs
EMD Value
₹40,000
Closing Date
18 Feb 2025, 10:30 amClosed
Manager(TnC)
ALUMINA REFINERY NALCO DAMANJODI
CONSTRUCTION OF 10 NOS TOILET AND URINAL FOR BOYS AND 10 NOS TOILET AND URINAL FOR GIRLS IN THE SR. SVM SCHOOL CAMPUS AND CONSTRUCTION OF 02 SETS OF TOILET UNIT IN DPS AT NALCO TOWNSHIP, DAMANJODI
2025_NALCO_847268_1
TnC/AR/03/eC-2800
Limited
Miscellaneous Works
Item Rate
NALCO DAMANJODI
As per tender documents
6 documents required · 6 mandatory
₹0
₹40,000
Yes
15 Nov 2025
4 Feb 2025
20 Feb 2025
4 Feb 2025
18 Feb 2025
4 Feb 2025
stage.html
html • 0.09 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_890824.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .