Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 7TH FLOOR EASTERN WING CENTENNIAL SQUARE 6A DR AMBEDKAR ROAD KODAMBAKKAM CHENNAI 600024 | CHENNAI | CHENNAI | TAMIL NADU | 600024 | Admitted-Finance |
| 2 | Admitted-Finance TC III TOWER B 2ND FLOOR C WING P O BOX 979 MOUNT POONAMALLEE ROAD MANAPAKKAM CHENNAI 600089 TAMIL NADU INDIA | CHENNAI | CHENNAI | TAMIL NADU | 600089 | Admitted-Finance |
| 3 | Admitted-Finance 9TH FLOOR PRIMA BAY TOWER B GATE NO 5 SAKI VIHAR ROAD POWAI MUMBAI 400072 | MUMBAI | MUMBAI | MAHARASHTRA | 400072 | Admitted-Finance |
| 4 | Rejected-Technical ELECTRICAL DIVISION 8TH FLOOR NCC HOUSE MADHAPUR HYDERABAD 500081 | HYDERABAD | HYDERABAD | TELANGANA | 500081 | Rejected-Technical NOT ACCEPTED BEING NOT MEETING BQC EXPERIENCE CRITERIA |
Tender Value
Refer Docs
Closing Date
16 Dec 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
VINOD KUMAR
TECHNIP INDIA LTD A4 SECTOR 1 NOIDA UP PIN 201301 INDIA
BORED CAST IN SITU PILING AND GROUND IMPROVEMENT WORKS FOR INTERCONNECTING PIPE RACK AND BUILDINGS FOR NRL NREP PROJECT
2021_NRL_655044_1
TPIL/CONS/NRL/082176C/022
Open Tender
Civil Works
Works
365 days
NUMALIGARH REFINERY
AS PER NIT TERMS AND CONDITIONS
6 documents required · 6 mandatory
₹0
Exempted
31 Jan 2022
29 Oct 2021
17 Dec 2021
29 Oct 2021
16 Dec 2021
11 Nov 2021
120 days
Amount
GENERAL INSTRUCTION : GROUND IMPROVEMENT : STONE COLUMNS & STONE BLANKET LAYER: All Supply, Fabrication, Erection, Construction, Testing works shall be performed as per AFC Drawings, Project Specifications, Project Standards, General Notes, Indian Codes, etc., (NOTE: For Item Sr. No. Bidder to refer the price schedule attached with tender Part-IIa at priced section)
SITE CLEARING :Grubbing, scrubbing & clearing the areas, removal of roots / boulders, breaking clods, making up the hollow produced by removal of roots / boulders with available earth, clearing the site of all objectionable / unserviceable materials by means of manual or mechanical excavation as per directions of Engineer-in-Charge. Including loading, transport, unloading and disposal of the unserviceable material at designated areas within the plant boundary and levelling the same.
GENERAL INSTRUCTION Designing & providing all material, material inspection and testing, tools, tackles and constructing stone columns as specified, and to control settlements, as per design, guidelines, material specifications, construction methods given in Job supply specification. Mobilisation of adequate number of rigs, tools, tackles, plant, calibrated equipment etc. and all accessories required for the construction of the stone columns/ ground improvement as per specifications and demobilising the same after the works are complete.
GROUND IMPROVEMENT USING STONE COLUMNS: STONE COLUMNS AROUND CONCRETE PILES FOR LIQUEFACTION MITIGATION Provide and construct stone columns by using Dry bottom feed method as per design drawings of length upto 7.5 M below bottom of FOUNDATION (2.5m below FGL) including drilling, all material supply, loading, transport, unloading, placing & ramming well graded stone aggregates, labour etc. all complete as per specifications, as per approved design drawings, Quality control & Inspection, in all types of soils, between and around concrete piles for liquefaction mitigation of soil layers as per geotechnical report. on completion of ground improvement, clearing the site to start the RCC Piling works also included in this scope. (Unit of measurement : Length as built of stone column per diameter, measured from actual Pile Cut off level (COL) to the Toe depth indicated on records.)
Same as item 4 but for Stone column of dia 600mm, between and around concrete piles of diameter 450/500/600/750mm piles
Same as item 4 but for Stone column of dia 750mm, between and around concrete piles of diameter 600/750mm piles
Same as item 4 but for Stone column of dia 900mm, between and around concrete piles of diameter 750mm piles
GROUND IMPROVEMENT USING STONE COLUMNS: STONE COLUMNS AROUND CONCRETE PILES FOR LIQUEFACTION MITIGATION Provide and construct stone columns by using Dry bottom feed method as per design drawings of length upto 12.5 M below bottom of FOUNDATION (2.5m below FGL) including drilling, all material supply, loading, transport, unloading, placing & ramming well graded stone aggregates, labour etc. all complete as per specifications, as per approved design drawings, Quality control & Inspection, in all types of soils, between and around concrete piles with liquefaction mitigation of soil layers as per geotechnical report. on completion of ground improvement, clearing the site to start the RCC Piling works also included in this scope. (Unit of measurement : Length as built of stone column per diameter, measured from actual Pile Cut off level (COL) to the depth indicated on records.)
Same as item 5 but for Stone column of dia 600mm, between and around concrete piles of diameter 450/500/600/750mm piles
Same as item 5 but for Stone column of dia 750mm, between and around concrete piles of diameter 600/750mm piles
Same as item 5 but for Stone column of dia 900mm, between and around concrete piles of diameter 750mm piles
GROUND IMPROVEMENT USING STONE COLUMNS: STONE COLUMNS AROUND CONCRETE PILES FOR LIQUEFACTION MITIGATION Provide and construct stone columns by using Dry bottom feed method as per design drawings of length upto 17.5 M below bottom of FOUNDATION (2.5m below FGL) including drilling, all material supply, loading, transport, unloading, placing & ramming well graded stone aggregates, labour etc. all complete as per specifications, as per approved design drawings, Quality control & Inspection, in all types of soils, between and around concrete piles with liquefaction mitigation of soil layers as per geotechnical report. on completion of ground improvement, clearing the site to start the RCC Piling works also included in this scope. (Unit of measurement : Length as built of stone column per diameter, measured from actual Pile Cut off level (COL) to the depth indicated on records.)
Same as item 6 but for Stone column of dia 600mm, between and around concrete piles of diameter 450/500/600/750mm piles
Same as item 6 but for Stone column of dia 750mm, between and around concrete piles of diameter 600/750mm piles
Same as item 6 but for Stone column of dia 900mm, between and around concrete piles of diameter 750mm piles
EMPTY DRILLING Empty drilling for stone columns construction measured from working level to the Cut off level as per approved design drawings for following dia stone columns and filled with sand. (Unit of measurement : Length as drilled for stone column per diameter, measured from working level to actual Cut off level (COL) to the depth indicated on records.)
Same as item 7 but for Stone column of dia 600mm
Same as item 7 but for Stone column of dia 750mm
Same as item 7 but for Stone column of dia 900mm
DESIGN CALCULATIONS Provide design calculations for item nos 4.1 to 4.3, 5.1 to 5.3, 6.1 to 6.3, 7.1 to 7.3 depicting desired increase in N-value in order to mitigate soil liquefaction below all the units & method to achieve the same in line with specification TP-1ZZZA-CV-SPE-0040-D1 for piperacks/ structures/ buildings/ sheds as per scope of work . Also, provide each piperack/structure/building/shed stone columns layout between and around concrete piles for item no. 4.1 to 4.3, 5.1 to 5.3, 6.1 to 6.3, 7.1 to 7.3 for OWNER/MPMC approval before start of execution
Approval of IIT or NIT or Government College of Engineering (having Competancy) for item no.8 before start of execution
STONE COLUMNS TESTING
Conducting Electric Static cone penetration test (ECPT) conforming to ASTM D5778-20 for specified minimum treatment depth as per design or minimum design depth of 10M which ever is more, to specify N-Value for item no.4.1 to 4.3,5.1 to 5.3 and 6.1 to 6.3, as per requirements given in IS13094:1992 clause 9.2 at specified depths to confirm improvement in N-value to nullify liquefaction potential.
COMPACTION GROUTING\ GROUND IMPROVEMENT
GENERAL INSTRUCTION: Designing & providing of Compaction grouting ( where ever it is not possible to install stone columns due to site conditions and on approval from MPMC/OWNER) all material, material inspection and testing, tools, tackles and carrying out compaction grouting as specified, and to control settlements, as per design, guidelines, material specifications, construction methods given in Job supply specification. Mobilization of adequate number of rigs, tools, tackles, plant, measurement devices, equipment etc. and all accessories required for the execution of the compaction grouting as per specifications and demobilizing the same after the works are complete.
COMPACTION GROUTING AROUND CONCRETE PILES FOR LIQUEFACTION MITIGATION
Provide and execute compaction grouting of specified length below bottom of foundation (2.5 m below FGL) including all material, labour etc. all complete as per specifications between and around 450/500/600/750mm dia concrete piles with improvement in N-values and liquefaction mitigation of soil layers as per geotechnical report. on completion of ground improvement, clearing the site to start the RCC Piling works also included in this scope. This includes Rotary Drilling with NW size (89 mm) casing/stringer rod installed in vertical/inclined direction (as per site requirements), using wash boring method & as per grid of spacing based on approved drawing, in soil from FGL/WPL to the required depth including cost of all machinery, labour, fuel & water charges as directed by Engineer In Charge. (Unit of measurement -Cubic Meter starting from 2.5 Mtr Below FGL). Empty holes up to cut off level from working level shall be filled with sand by Contractor. Nothing extra shall be payable for empty drilling & sand filling.
Same as item 10.1 but for Compaction grouting upto 7.5m below bottom of foundation, between and around concrete piles of diameter 450/500/600/750mm piles
Same as item 10.1 but for Compaction grouting upto 12.5m below bottom of foundation, between and around concrete piles of diameter 450/500/600/750mm piles
Same as item 10.1 but for Compaction grouting upto 15.5m below bottom of foundation, between and around concrete piles of diameter 450/500/600/750mm piles
Conducting Electric Static cone penetration test (ECPT) conforming to ASTM D5778-20 for specified minimum treatment depth as per design or minimum depth of 10M to specify N-Value for piled area for item no. 10.2,10.3.,10.4 as per requirements given in IS13094:1992 clause 9.2 at specified depths to confirm improvement in N-value to nullify soil liquefaction.
DESIGN CALCULATIONS Provide design calculations for item no. 10.2,10.3,10.4 depicting desired increase in N-value in order to mitigate soil liquefaction below all the piperacks/structures/buildings/sheds/units (Corresponding piling layouts provided by OWNER/MPMC) & method to achieve that N-value in line with specification TP-1ZZZA-CV-SPE- 0039-D1. Also provide compaction grouting pipes layout between and around concrete piles for item no. 10.2, 10.3, 10.4 for OWNER/MPMC approval before start of execution
Approval of IIT or NIT or Government College of Engineering (having Competancy) for item no. 11 before start of execution
PART B PILING WORKS (RCC BORED CAST INSITU PILES)
BORED CAST-IN SITU CONCRETE PILES: Mobilizing and Demobilizing of Equipment / Tools and Tackles as required for executing the Piling work and / or shifting the Equipment from one location to another as required and as directed by Engineer-In-charge. The quoted rate shall also include material Inspection and testing. Rate includes the material filled above cut-off level. Rate includes all ancillary equipments, materials, tools, temporary supports, tackles , labour etc. all complete necessary to install Bored cast-in-situ R.C.C. piles at site, as per Technical specification and demobilization of the same after completion of job.
BORED CAST-IN SITU CONCRETE PILES: Execution of pile bore by rotary and/or percussion, conventional (DMC) method means in any soil , by approved technique through all types of sub soil strata, including the supply of bentonite mud, design and supply of Ready Mix Concrete(RMC) only, casting and vibration of concrete grade M30 as per the design mix using either Ordinary Portland Cement of Grade 43/Grade 53 or Portland Pozzolana cement(fly ash based/calcined based) conforming to IS 1489 Part1&2 (with minimum cement content 400 kg/m3) , using coarse aggregates of 20mm and down size to carry a safe working load not less than that specified in drawing, including concrete quality control tests as per Approved QCP, supplying admixtures and other materials including plasticizers if required as per specification TP-1ZZZA-CV-SPE-0037 for BCIS piling/NR-0ZZZZ-CV-SPE-0002 Specification for Concrete Works/recommendations, excluding the cost of steel reinforcement but including the cost of boring with casing and/or bentonite solution/polymer (include any additive or admixture if necessary to avoid soil cave-ins) for maintaining borehole side, tremie concreting, supply of necessary materials , machineries and labours and carrying out all ancillary works, disposal of surplus materials including excavated earth/muck/other materials, vegetations, bentonite/polymer slurry etc.at designated areas for all leads and lifts within refinery premises, shifting of plant and equipment from one pile location to other, all complete as per drawing and direction of Engineer-in-charge. issue of driving records shall be in the scope of sub-contractor without any additional charge. Quoted Rate shall also include Contractor's preparedness plan and mitigation measures for working during the monsoon period. The bore hole above the pile cutoff level shall be finished with same concrete of height variable according to construction sequence (minimum 600mm) and balance height by sand or crushed stone as per drawing, specification and directions of Engineer-in-charge for the following diameter & length of piles. Rate includes supplying and mixing of approved brand of BI-POLAR CONCRETE PENETRATING CORROSION INHIBITING ADMIXTURE ( as per specification TP-1ZZZA-CV-SPE-0016) in concrete as per manufacturer's specification for protection of reinforcement against corrosion. Supply of admixture and Testing as per ASTM/ IS codes in Contractor's scope. Application of Polymer in place of Bentonite shall be as per the direction of EIC without any extra cost. Pile Measurement: Length of each pile x No of Piles. Length of each pile shall be measured from Pile Cut Off Level (C.O.L) to pile tip level as per actual driving records or as per IFC Drawings (boring / concreting/ filling above the cut-off level till working Level shall not be considered).Cut Off Level and tip level shall be strictly as per the IFC Drawings.
All above activities for Diameter of pile-450 MM, length of pile up to 20M from C.O.L
All above activities for Diameter of pile-500 MM, length of pile up to 20M from C.O.L
All above activities for Diameter of pile-600 MM, length of pile up to 20M from C.O.L
All above activities for Diameter of pile-750 MM, length of pile up to 20M from C.O.L
All above activities for Diameter of pile-450 MM, length of pile above 20M from C.O.L up to 30M from C.O.L
All above activities for Diameter of pile-500 MM, length of pile above 20M from C.O.L up to 30M from C.O.L
All above activities for Diameter of pile-600 MM, length of pile above 20M from C.O.L up to 30M from C.O.L
All above activities for Diameter of pile-750 MM, length of pile above 20M from C.O.L up to 30M from C.O.L
Extra for supply , using and proper disposal of polymer instead of bentonite as per 12.1 for Diameter of pile 450 mm, length of pile 20M , Grade of Concrete-M30, with minimum cement content of 400 kg/m3)
Extra for supply , using and proper disposal of polymer instead of bentonite as per 12.2 for Diameter of pile 500 mm, length of pile 20M , Grade of Concrete-M30, with minimum cement content of 400 kg/m3)
Extra for supply , using and proper disposal of polymer instead of bentonite as per 12.3 for Diameter of pile 600 mm, length of pile 20M , Grade of Concrete-M30, with minimum cement content of 400 kg/m3)
Extra for supply , using and proper disposal of polymer instead of bentonite as per 12.4 for Diameter of pile 750 mm, length of pile 20M , Grade of Concrete-M30, with minimum cement content of 400 kg/m3)
Extra for supply , using and proper disposal of polymer instead of bentonite as per 12.5 for Diameter of pile 450 mm, length of pile in excess of 20.0M but not more than 30 M, Grade of Concrete-M30, with minimum cement content of 400 kg/m3)
Extra for supply , using and proper disposal of polymer instead of bentonite as per 12.6 for Diameter of pile 500 mm, length of pile in excess of 20.0M but not more than 30 M , Grade of Concrete-M30, with minimum cement content of 400 kg/m3)
Extra for supply , using and proper disposal of polymer instead of bentonite as per 12.7 for Diameter of pile 600 mm, length of pile in excess of 20.0M but not more than 30 M , Grade of Concrete-M30, with minimum cement content of 400 kg/m3)
Extra for supply , using and proper disposal of polymer instead of bentonite as per 12.8 for Diameter of pile 750 mm, length of pile in excess of 20.0M but not more than 30 M , Grade of Concrete-M30, with minimum cement content of 400 kg/m3)
PILE EXTENSTION: Extending piles above cut off level, if required, including supplying and pouring M-30 Ready Mix concrete with a minimum cement content of 400 Kg/cu.m. of concrete and with water cement ratio (including water contained in the aggregates) not exceeding 0.45 including all shuttering, vibrating, curing, etc. complete but excluding reinforcement (Any building up of piles upto specified cutoff level if required to be done, due to any reason other than design change shall be at piling CONTRACTOR's cost)
All activities and scope same as item no 12.17 but for 450mm dia pile
All activities and scope same as item no 12.17 but for 500mm dia pile
All activities and scope same as item no 12.17 but for 600mm dia pile
All activities and scope same as item no 12.17 but for 750mm dia pile
EMPTY BORING: Empty boring for vertical piles measured from working level to plus 600mm above the Cut off level for following dia piles.
All activities and scope same as item no 13 but for 450mm dia pile
All activities and scope same as item no 13 but for 500mm dia pile
All activities and scope same as item no 13 but for 600mm dia pile
All activities and scope same as item no 13 but for 750mm dia pile
TRANSPORTING SURPLUS EARTH: Contractor shall transport surplus earth from Refinery premises and dispose the earth in various locations outside refinery premises as per below SOR item (13.6 and 13.7) and scope of work of the tender and as directed by NRL/MPMC as per site requirement.
Carting away, stacking and spreading bored/excavated spoil mixed with bentonite/polymer muck out side the refinery complex / refinery gate for a lead upto 5 KM from Pragati dwar (NREP gate).
Carting away, stacking and spreading bored/excavated spoil mixed with bentonite/polymer muck out side the refinery complex / refinery gate for a lead of more than 5 KM and upto 10 KM from Pragati dwar (NREP gate).
Carting away, stacking and spreading bored/excavated spoil mixed with bentonite/polymer muck out side the refinery complex / refinery gate for a lead of more than 10 KM and upto 15 KM from Pragati dwar (NREP gate).
REINFORCEMENT CAGE FOR CAST-IN-PLACE CONCRETE PILES: Supplying and placing in position high strength deformed bar reinforcement cage of specified grade conforming to IS: 1786 for RCC Cast-in-Situ piles for full length of pile, including bar bending schedule, straightening, cleaning, uncoiling, cutting, removing milscales and rust, bending to required shape & lengths as per details, binding with sub-contractor's own 18 SWG black soft annealed binding wire, supplying and placing with proper cover blocks, supports, chairs, spacers, welding, if required, to form a rigid cage; returning of unused / scrap/ unserviceable steel to storage point for all heights and depths etc., all complete including supplying as per instructions of the Engineer-in-Charge. all the rebars/dowels above C.O.L to be protected, by the piling contractor, by polyethylene sleeves against the water/soil. Included : Inspection and test of materials Measurement: Weight calculated as the unit weight multiplied by the finished net bar length as per IFC drawings. Scrap and construction materials such as joints, spacers, overlapping and supporting rods not indicated shall not be considered in the measurement. Steel Grade Fe 500D conforming to IS 1786 specified minimum percentage elongation (>14.5%) as per IS13920
INITIAL LOAD TEST
LOADING TEST (COMPRESSION) Conducting initial cyclic Vertical Load Test on pile by direct loading on piles as per project specification/ latest IS code including the necessary preparatory work, finishing pile head by breaking off the concrete above the cutoff level, disposal of concrete debris, supply & erection of kentledge of suitable magnitude, labour, excavation upto required level/depth, back filling, compaction etc., removal of load along with all preparatory work and measuring equipment after execution of test, all tools and tackles required, analyzing the results, making the report and submitting the records and reports, all complete as per specifications and directions of Engineer-in-Charge. Including all tests with regards to Definition of methodology and materials to conduct the test, NOTE : Cost of Pile excluded. Measurement : Number of test Loading test on Initial test pile .
All activities and scope same as 15 but for 450 mm dia. Bored cast in situ pile
All activities and scope same as 15 but for 500 mm dia. Bored cast in situ pile
All activities and scope same as 15 but for 600 mm dia. Bored cast in situ pile
All activities and scope same as 15 but for 750 mm dia. Bored cast in situ pile
LOADING TEST (HORIZONTAL OR LATERAL LOADING TEST) Conducting initial Lateral Load Test on pile by direct loading on piles as per project specification/ latest IS code including the necessary preparatory works, pile head preparation by breaking off the concrete above the cutoff level, disposal of concrete debris, supply & erection of kentledge of suitable magnitude, labor, excavation upto required level/depth, back filling, compaction etc., removal of load along with all preparatory works and measuring equipment after execution of test, all tools and tackles required, analyzing the results, making the report and submitting the records and reports, all complete as per specifications and directions of Engineer-in-Charge. Including all tests with regards to Definition of methodology and materials to conduct the test, NOTE: Cost of Pile excluded. Measurement : Number of test Loading test on Initial test pile
All activities and scope same as 16 but for 450 mm dia. Bored cast in situ pile
All activities and scope same as 16 but for 500 mm dia. Bored cast in situ pile
All activities and scope same as 16 but for 600 mm dia. Bored cast in situ pile
All activities and scope same as 16 but for 750 mm dia. Bored cast in situ pile
LOADING TEST (TENSILE TEST OR UPLIFT) Conducting initial Lateral Load Test on pile by direct loading on piles as per project specification/ latest IS code including the necessary preparatory works, pile head preparation by breaking off the concrete above the cutoff level, disposal of concrete debris, supply & erection of kentledge of suitable magnitude, labor, excavation upto required level/depth, back filling, compaction etc., removal of load along with all preparatory works and measuring equipment after execution of test, all tools and tackles required, analyzing the results, making the report and submitting the records and reports, all complete as per specifications and directions of Engineer-in-Charge. Including all tests with regards to Definition of methodology and materials to conduct the test, NOTE: Cost of Pile excluded. Measurement : Number of test Loading test on Initial test pile
All activities and scope same as 17 but for 500 mm dia. Bored cast in situ pile
All activities and scope same as 17 but for 600 mm dia. Bored cast in situ pile
All activities and scope same as 17 but for 750 mm dia. Bored cast in situ pile
ROUTINE LOAD TEST
LOADING TEST (COMPRESSION) Conducting Vertical Load Test on pile by direct loading on piles as per project specification/ latest IS code including the necessary preparatory work, finishing pile head by breaking off the concrete above the cutoff level, disposal of concrete debris, supply & erection of kentledge of suitable magnitude, labour, excavation up to required level/depth, back filling, compaction etc., removal of load along with all preparatory work and measuring equipment after execution of test, all tools and tackles required, analyzing the results, making the report and submitting the records and reports, all complete as per specifications and directions of Engineer-in-Charge. Including all tests with regards to Definition of methodology and materials to conduct the test, NOTE : i) Cost of Pile excluded. ii) Cost of excavation and Pile Head Breaking up to cut off level payable under respective Pile Integrity Test Item. Measurement : Number of test Loading test on working pile .
All activities and scope same as 18 but for 450 mm dia. Bored cast in situ pile
All activities and scope same as 18 but for 500 mm dia. Bored cast in situ pile
All activities and scope same as 18 but for 600 mm dia. Bored cast in situ pile
All activities and scope same as 18 but for 750 mm dia. Bored cast in situ pile
LOADING TEST (TENSILE TEST OR UPLIFT) Conducting Pull Out Test on pile by direct loading on piles as per project specification/ latest IS code including the necessary preparatory work, finishing pile head by breaking off the concrete above the cutoff level, disposal of concrete debris, supply & erection of kentledge of suitable magnitude, labour, excavation upto required level/depth, back filling, compaction etc., removal of load along with all preparatory works and measuring equipment after execution of test, all tools and tackles required, analyzing the results, making the report and submitting the records and reports, all complete as per specifications and directions of Engineer-in-Charge. Including all tests with regards to Definition of methodology and materials to conduct the test, NOTE : i) Cost of Pile excluded. ii) Cost of excavation and Pile Head Breaking up to cut off level payable under respective Pile Integrity Test Item. Measurement : Number of test Loading test on working pile
All activities and scope same as 19 but for 450 mm dia. Bored cast in situ pile
All activities and scope same as 19 but for 500 mm dia. Bored cast in situ pile
All activities and scope same as 19 but for 600 mm dia. Bored cast in situ pile
All activities and scope same as 19 but for 750 mm dia. Bored cast in situ pile
LOADING TEST (HORIZONTAL OR LATERAL LOADING TEST) Conducting Lateral Load Test on pile by direct loading on piles as per project specification/ latest IS code including the necessary preparatory works, pile head preparation by breaking off the concrete above the cutoff level, disposal of concrete debris, supply & erection of kentledge of suitable magnitude, labor, excavation upto required level/depth, back filling, compaction etc., removal of load along with all preparatory works and measuring equipment after execution of test, all tools and tackles required, analyzing the results, making the report and submitting the records and reports, all complete as per specifications and directions of Engineer-in-Charge. Including all tests with regards to Definition of methodology and materials to conduct the test, NOTE : i) Cost of Pile excluded. ii) Cost of excavation and Pile Head Breaking up to cut off level payable under respective Pile Integrity Test Item. Measurement : Number of test Loading test on working pile
All activities and scope same as 20 but for 450 mm dia. Bored cast in situ pile
All activities and scope same as 20 but for 500 mm dia. Bored cast in situ pile
All activities and scope same as 20 but for 600 mm dia. Bored cast in situ pile
All activities and scope same as 20 but for 750 mm dia. Bored cast in situ pile
INTEGRITY TEST ON WORKING PILE: Conducting Integrity test on piles (NDT Test) on all working piles of any diameter including necessary excavation and pile chipping, pile head preparation, mobilizing all necessary equipment, technicians, head preparation, setup, interpretation, computation, analysis of results and submission of reports all complete as per project specifications/ IS code and as directed by Engineer-in-charge for all dia. of piles(450mm, 500mm, 600mm &750mm). Note: Cost of Pile excluded. Measurement : Number of test
PILE CHIPPING Chipping of piles up to cut off level as shown on the drawings, ensuring that while chipping , the reinforcement is kept completely intact including cleaning and coating exposed reinforcement with cement wash completely. For specified dia. of pile. Measurement : Length of Chipping in metre
All activities and scope same as 22 but for 450 mm dia. Bored cast in situ pile
All activities and scope same as 22 but for 500 mm dia. Bored cast in situ pile
All activities and scope same as 22 but for 600 mm dia. Bored cast in situ pile
All activities and scope same as 20 but for 750 mm dia. Bored cast in situ pile
ADDITIONAL ITEMS: items applicable for the activities which are not part of above SOR items but required to complete the job as per instruction of Engineer-in- Charge
EXCAVATION Earth work in excavation for all kind of Soil including black cotton soil, soft and hardmurrum, sand, gravel, soil containing small pebbles, rubble, boulders, removable without breaking/blasting, marshy land and road shoulders etc., which can be loosened manually or mechanically operating tackles such as pick shovels, front loader (as defined in IS 1200) etc., for all types of of foundations/footings, plinth beams, pile caps or any other substructures, as pr approved design drawings, including all labour, materials, dressing of sides, pumping & bailing out water accumulated due to rain and / or subsoil waters and including disposal or stacking, leveling and neatly dressing as decided by Engineer-in-Charge including providing temporary supports to existing service lines like water pipes, sewerage, electric cables, etc., if any, complete, including shoring/ strutting /sheet pile, all materials and labour complete and as directed by Engineer-in-Charge for following depth. Dewatering system supply, installation of number of wells, pumps and all associated works complete, maintenance, etc., from Start of excavation works till Stone Column works execution and testing are completed and as per directions of Engineer-in-Charge. Rate for de-commissioning of dewatering system shall also be considered. Excavated soil shall be disposed at least up to the distance of 500 meter from the plant Boundary for backfilling and the charges for the same is included in this item. (Mode of measurement shall be as per foot print area of PCC/stone blanet dimensions) - From grade level upto 2.0m depth
EXCAVATION All activities and scope same as 23 but for excavation below 2m and upto 4m below existing ground level.
TRANSPORTATION: Transportation of surplus earth/debris, muck, marsh, vegetation remains to dumping area outside site Carting the surplus excavated earth/rocks and debris from construction area beyond the initial lead of 500 meters to the approved dumping area outside the plant boundary at any distance from the site, including re-excavating the deposited soil excavated earlier, transportation, loading, unloading, laying at all depths/heights, stacking, levelling and dressing both the area (viz. from where the earth is carted and where it is deposited) to required levels and slopes complete with all lifts. Including any payment of fee, duties and royalties etc for using the dump. Contractor shall transport surplus earth from Refinery premises and dispose the earth in various locations outside refinery premises as per below SOR item (24.1, 24.2 and 24.3) and scope of work of the tender and as directed by NRL/MPMC as per site requirement . Contractor shall coordinate and liaise with Govt official and statutory department for obtaining Mining Plan under the provision of the Assam Minor Mineral Concession Rules and Environmental Clearance from State Environment Impact Assessment Authority , Assam or any other Statutory body for excavation and transportation of surplus earth generated from construction activities.
Carting away, stacking and spreading bored/excavated soil out side the refinery complex / refinery gate for a lead upto 5 KM from Pragati dwar (NREP gate ).
Carting away, stacking and spreading bored/excavated soil out side the refinery complex / refinery gate for a lead upto 10 KM from Pragati dwar (NREP gate ).
Carting away, stacking and spreading bored/excavated soil out side the refinery complex / refinery gate for a lead upto 15 KM from Pragati dwar (NREP gate ).
DISMANTLING: Dismantling of existing structures or part at all levels and breaking in to small pieces (suitable for backfilling and disposal) including all leads and lifts, tools, tackles, compressed air, labour, crane, consumables and disposal within refinery premises as directed by Engineer-in- charge
same as item 26 for all type of RCC works
same as item 26 for all type of PCC works
same as item 26 for all type of Masonry works
same as item 26 for RCC UG pipes upto 300mm dia and cables Measurement : length of pipe rack (including group of pipes/cables within the width)
same as item 26 for Removal of existing steel, structural members, pipes, cables etc.. Including cutting and disposal anywhere within refinery premises as directed by Engineer-in-charge
M/s ITD Cementation India Limited
LandT GeoStructure Private Limited
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .