Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 LAccepted-AOC H NO 18 BY LANE NO 09 SATGAON PRAGATI NAGAR GUWAHATI ASSAM 781171 | KAMRUP METRO | ASSAM | 781171 | L1 | Accepted-AOC Lowest bidder | |
| 2 | L2₹15.9 L+₹7.4 L (87.4%)Rejected-Finance MES COLONY KUMBHIGRAM AIRPORT CACHAR ASSAM 788109 | KUMBHIGRAM | CACHAR | ASSAM | 788109 | L2 | Rejected-Finance Other than lowest bidder |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
25 Sept 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE GUWAHATI
GE GUWAHATI PO SATGAON DISTT KAMRUP - 781027
REPAIR/MAINT TO WATER SUPPLY INSTALLATION INCLUDING CLEANING OF OH/UG RESERVOIR AT BASISTHA ARES UNDER GE GUWAHATI
2021_MES_468170_1
GE/GUW/T/24/8145 of 2021-22
Open Tender
Civil Works
Item Rate
180 days
GUWAHATI
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GE GUWAHATI
₹20,000
Yes
17 Nov 2021
14 Aug 2021
27 Sept 2021
14 Aug 2021
25 Sept 2021
11 Sept 2021
14 Aug 2021 - 21 Aug 2021
60 days
Amount
Taking down defective burnt out electric driven centrifugal pump/motor (Make- Kirlosker) of capacity 40 HP working on 3 phase, 440 volts 50 Hz, duly disconnecting electric and mechanical connection from pump and transport to civil workshop, dismantling and opening the motor into parts and taking out burnt out starter winding, cleaning, servicing slots etc. drying all parts and sort out defective spares, rewinding the starter winding with suitable size of super enameled copper wire as per existing gauge including replacement of insulating materials, varnishing, heating up starter winding in heating chamber to achieve insulation resistance at least 6 Ohms and reassembling after replacement of defective parts/spares including testing at workshop, transporting to site and reinstalled, mounting to its original position including coupling with respective pump and reconnect all disconnected connections, disconnected cable connections and mechanical support etc. including painting to motor with one coat of synthetic enamel paint as per existing colour after and including preparation of old painted surfaces including testing and commissioning complete all as required and as directed. Note:- New spare as required shall be measured and paid separately as 'supply only' under following items:
Supply only Bearing DE complete all as required and as directed.
Supply only Bearing NDE complete all as required and as directed.
Supply only PVC Cooling fan suitable for motor complete all as required and as directed.
Supply only CI Impeller suitable for Pump Set complete all as required and as directed.
Supply only Pump Shaft complete all as required and as directed.
Supply only Shaft sleeve Nut complete all as required and as directed.
Supply only Split Gland complete all as required and as directed.
Supply only CI Gland flange complete all as required and as directed.
Supply only Shaft coupling bolts with rubber bush complete all as required and as directed.
Supply only Set of Key complete all as required and as directed.
Taking down defective burnt out electric driven centrifugal pump/motor (Make- Kirlosker) of capacity 25 to 30 HP working on 3 phase, 440 volts 50 Hz, duly disconnecting electric and mechanical connection from pump and transport to civil workshop, dismantling and opening the motor into parts and taking out burnt out starter winding, cleaning, servicing slots etc. drying all parts and sort out defective spares, rewinding the starter winding with suitable size of super enameled copper wire as per existing gauge including replacement of insulating materials, varnishing, heating up starter winding in heating chamber to achieve insulation resistance at least 6 Ohms and reassembling after replacement of defective parts/spares including testing at workshop, transporting to site and reinstalled, mounting to its original position including coupling with respective pump and reconnect all disconnected connections, disconnected cable connections and mechanical support etc. including painting to motor with one coat of synthetic enamel paint as per existing colour after and including preparation of old painted surfaces including testing and commissioning complete all as required and as directed. Note:- New spare as required shall be measured and paid separately as 'supply only' under following items:
Supply only Pump Shaft complete all as required and as directed.
Supply only DE bearing suitable for 25 to 30 HP pump set complete all as required and as directed
Supply only NDE bearing suitable for 25 to 30 HP pump set complete all as required and as directed
Supply only Shaft sleeve Nut complete all as required and as directed.
Supply only Split Gland complete all as required and as directed.
Supply only CI Gland flange complete all as required and as directed.
Supply only Shaft coupling bolts with rubber bush complete all as required and as directed.
Supply only Set of Key complete all as required and as directed.
Taking down defective burnt out electric driven centrifugal pump/motor (Make- Kirlosker) of capacity 5 to 10 HP working on 3 phase, 440 volts 50 Hz, duly disconnecting electric and mechanical connection from pump and transport to civil workshop, dismantling and opening the motor into parts and taking out burnt out starter winding, cleaning, servicing slots etc. drying all parts and sort out defective spares, rewinding the starter winding with suitable size of super enameled copper wire as per existing gauge including replacement of insulating materials, varnishing, heating up starter winding in heating chamber to achieve insulation resistance at least 6 Ohms and reassembling after replacement of defective parts/spares including testing at workshop, transporting to site and reinstalled, mounting to its original position including coupling with respective pump and reconnect all disconnected connections, disconnected cable connections and mechanical support etc. including painting to motor with one coat of synthetic enamel paint as per existing colour after and including preparation of old painted surfaces including testing and commissioning complete all as required and as directed. Note:- New spare as required shall be measured and paid separately as 'supply only' under following items:
Supply only Bearing DE complete all as required and as directed.
Supply only Bearing NDE complete all as required and as directed.
Supply only PVC Cooling Fan suitable for pump set 10 HP motor complete all as required and as directed.
Supply only Casing wear ring complete all as required and as directed.
Supply only Bearing Cover complete all as required and as directed.
Supply only Pump Shaft complete all as required and as directed.
Supply only Set of Key complete all as required and as directed.
S&F, Battery, 12 volts, 180 AH, 25 plates suitable for DG Set including initial charging complete all as specified and as directed.
S&F in repair, Fully Automatic Star-delta starter, 40 HP, complete all as specified and directed.
S&F in repair, Fully Automatic Star-delta starter, 30 HP, complete all as specified and directed.
S&F in repair, Fully Automatic Star-delta starter, 10 HP, complete all as specified and directed.
S&F in repair, Fully Automatic Star-delta starter, 7.5 HP, complete all as specified and directed.
S&F in repair, MCCB, 100 Amps, 25 KA, 415 Volts, 4 Pole with adjustable thermal & adjustable magnetic setting complete as specified and as directed.
Taking out defective burnt out electric driven centrifugal motor (Make- GEC) of capacity 125 HP working on 3 phase, 440 volts 50Hz duly disconnecting electric and mechanical connection from pump and transport to civil workshop, dismantling and opening the motor into parts and taking out burnt out starter winding, cleaning, servicing slots etc. drying all parts and sort out defective spares, rewinding the starter winding with suitable size of super enameled copper wire as per existing gauge including replacement of insulating materials, varnishing, heating up starter winding in heating chamber to achieve insulation resistance at least 6 Ohms and reassembling after replacement of defective parts/spares including testing at workshop, transporting to site and reinstalled, mounting to its original position including coupling with respective pump and reconnect all disconnected connections, disconnected cable connections and mechanical support etc. including painting to motor with one coat of synthetic enamel paint as per existing colour after preparation of old painted surfaces including testing and commissioning complete all as required and as directed.
Taking out centrifugal pump (Make- Kirlosker) of 125 HP capacity from its foundation duly disconnecting suction and delivery lines, transport the same to authorised civil workshop and back to site after repairs, dismantling, opening and sort out defective spares/parts and cleaning, servicing including greasing, servicing of spares after replacement of defective spares including painting of pump with two coats of synthetic enameled paint as per existing colour after and including preparation of old painted surfaces of pump and re-fixing, mounting the base to its original foundation, testing and commissioning complete all as required and as directed. Note:- New spare as required shall be measured and paid separately as 'supply only' under following items:-
Supply only Impeller first Stage, Cat Part No. 157 complete all as required and as directed.
Supply only Impeller Second Stage, Cat Part No. 158 complete all as required and as directed.
Supply only S S Shaft, Cat Part No. 180 complete all as required and as directed.
Supply only Ball Bearing DE, Cat Part No. – 260 complete all as required and as directed.
Supply only Ball Bearing NDE ,Cat Part No. - 263 complete all as required and as directed.
Supply only Key for Impeller & Shaft, Cat Part No. 320 complete all as required and as directed.
Supply only Key for Coupling, Cat Part No. 321 complete all as required and as directed.
Supply only Fine threaded MS Nuts & Bolts of size 5" Long & 3/4" dia complete all as required and as directed.
Supply only Gasket Set for 125 HP Pump Set complete all as required and as directed.
Cleaning of RCC OHT of 20 mtr staging height at Main pump house Basishta, capacity 1,00,000 Gallons, using following stages cleaning process including arrangement of necessary T&P, labour and Chemicals mechanize etc before starting process of cleaning complete all as specified and as directed. (a) Mechanized Dewatering (b) Sludge Removal (c) High Pressure Cleaning (d) Vaccum cleaning (e) Antibacterial spray (f) UV radiation. (g) Painting two coats of black bituminous paint on internal surface of Over Head water reservoir after cleaning the tank. Note:- (i) The entire work shall be carried out by well experienced personal/firms having experience of similar nature of work. (ii) Entire T&P and all Safty measure during the work shall be arranged by the contractor at his own cost. (iii) "Date of cleaning" shall be written over the outer surface at appropriate level to be decided by Engineer-in-charge with synthetic enamel paint of letteres not less than 100mm height and the cost of the same shall be deemed to include in the quoted unit rate of the contractor.
Cleaning of RCC OHT of 20 mtr staging height at Main pump house Basishta, capacity 76,000 Gallons, using following stages cleaning process including arrangement of necessary T&P, labour and Chemicals mechanize etc before starting process of cleaning complete all as specified and as directed. (a) Mechanized Dewatering (b) Sludge Removal (c) High Pressure Cleaning (d) Vaccum cleaning (e) Antibacterial spray (f) UV radiation. (g) Painting two coats of black bituminous paint on internal surface of Over Head water reservoir after cleaning the tank. Note:- (i) The entire work shall be carried out by well experienced personal/firms having experience of similar nature of work. (ii) Entire T&P and all Safty measure during the work shall be arranged by the contractor at his own cost. (iii) "Date of cleaning" shall be written over the outer surface at appropriate level to be decided by Engineer-in-charge with synthetic enamel paint of letteres not less than 100mm height and the cost of the same shall be deemed to include in the quoted unit rate of the contractor.
Cleaning of RCC OHT of 20 mtr staging height in MAP Qtrs Basishta, capacity 18,000 Gallons, using following stages cleaning process including arrangement of necessary T&P, labour and Chemicals mechanize etc before starting process of cleaning complete all as specified and as directed. (a) Mechanized Dewatering (b) Sludge Removal (c) High Pressure Cleaning (d) Vaccum cleaning (e) Antibacterial spray (f) UV radiation. (g) Painting two coats of black bituminous paint on internal surface of Over Head water reservoir after cleaning the tank. Note:- (i) The entire work shall be carried out by well experienced personal/firms having experience of similar nature of work. (ii) Entire T&P and all Safty measure during the work shall be arranged by the contractor at his own cost. (iii) "Date of cleaning" shall be written over the outer surface at appropriate level to be decided by Engineer-in-charge with synthetic enamel paint of letteres not less than 100mm height and the cost of the same shall be deemed to include in the quoted unit rate of the contractor.
Cleaning of RCC Semi Uner Ground Sump at Main Pump house Basishta, capacity 1,50,000 Gallons, using following stages cleaning process including arrangement of necessary T&P, labour and Chemicals mechanize etc before starting process of cleaning complete all as specified and as directed. (a) Mechanized Dewatering (b) Sludge Removal (c) High Pressure Cleaning (d) Vaccum cleaning (e) Antibacterial spray (f) UV radiation. (g) Painting two coats of black bituminous paint on internal surface of Semi UG sump after cleaning the tank. Note:- (i) The entire work shall be carried out by well experienced personal/firms having experience of similar nature of work. (ii) Entire T&P and all Safty measure during the work shall be arranged by the contractor at his own cost. (iii) "Date of cleaning" shall be written over the outer surface at appropriate level to be decided by Engineer-in-charge with synthetic enamel paint of letteres not less than 100mm height and the cost of the same shall be deemed to include in the quoted unit rate of the contractor.
Cleaning of RCC Semi Uner Ground Sump at Main Pump house Basishta, capacity 1,00,000 Gallons, using following stages cleaning process including arrangement of necessary T&P, labour and Chemicals mechanize etc before starting process of cleaning complete all as specified and as directed. (a) Mechanized Dewatering (b) Sludge Removal (c) High Pressure Cleaning (d) Vaccum cleaning (e) Antibacterial spray (f) UV radiation. (g) Painting two coats of black bituminous paint on internal surface of Semi UG sump after cleaning the tank. Note:- (i) The entire work shall be carried out by well experienced personal/firms having experience of similar nature of work. (ii) Entire T&P and all Safty measure during the work shall be arranged by the contractor at his own cost. (iii) "Date of cleaning" shall be written over the outer surface at appropriate level to be decided by Engineer-in-charge with synthetic enamel paint of letteres not less than 100mm height and the cost of the same shall be deemed to include in the quoted unit rate of the contractor.
M&L, in repairs, earthing to panel/motor/lightning arrester complete with galvanized steel earth plate electrode of 60 cm x 60 cm x 6mm thick buried directly in ground [earth pit not less than 2.25 metre deep below normal ground level] with top edge of the plate not less than 1.5 m below normal ground level, connected to galvanized earth strip of 25x4mm/connected to copper earth strip of 20x3mm by means of bolts, nuts, check nuts and washers of galvanized iron or steel all as shown in electrical plate No. 3 of MES SSR Part I connected to earth test point using earth strip of 25x4mm as earth lead all as specified and testing on completion including provision of earth lead protected by 40 mm dia light grade GI pipe & watering pipe shall be 20 mm bore medium grade GI pipe including all excavation and earth work in any type of soil, PCC pit with RCC cover, char coal, salt, funnel etc complete. Note : Rate quoted by tenderers shall be deemed to include for following provisions;-[i]. Excavation & earth work in any type of soil including removing of surplus material upto 50 M.[ii]. PCC 1:3:6 type C1 using 20mm graded stone aggregate in pit & 40mm thick precast RCC 1:2:4 type B1 cover 50x50 cm with 8mm TMT bars @ 10 cm C/C both ways with handles.[iii]. Main earthing lead from earth electrode to test point upto 7.5 mtr.[iv]. Funnel with watering pipe [GI pipe] 20mm bore [ISI marked] medium grade & copper lugs, charcoal & salt as reqd.[v]. GI protection pipe of size 40 mm bore light grade 7.5m.
S&F in repair, Aviation light low intesity aviation obstruction lamp of LED 302 Nos, 230 volts grade on the top of OHT tanks including conection copper cable of size 2.5 sq mm two core upto 150 meter of length complete all as specified and directed.
S&F in repair 200 mm bore cast iron flanged & drilled both ends sluice valve, (ISI marked) long body type, conforming to IS 14846-2000; Class PN-1.6 with iron wheel head & brass spindle including all jointing materials and mild steel nuts, bolts, washers, rubber / fibre board gaskets etc and testing complete all as specified & directed.
S&F in repair 150 mm bore cast iron flanged & drilled both ends sluice valve, (ISI marked) long body type, conforming to IS 14846-2000; Class PN-1.6 with iron wheel head & brass spindle including all jointing materials and mild steel nuts, bolts, washers, rubber / fibre board gaskets etc and testing complete all as specified & directed.
S&F in repair 100 mm bore cast iron flanged & drilled both ends sluice valve, (ISI marked) long body type, conforming to IS 14846-2000; Class PN-1.6 with iron wheel head & brass spindle including all jointing materials and mild steel nuts, bolts, washers, rubber / fibre board gaskets etc and testing complete all as specified & directed.
S&F in repair 80 mm bore cast iron flanged & drilled both ends sluice valve, (ISI marked) long body type, conforming to IS 14846-2000; Class PN-1.6 with iron wheel head & brass spindle including all jointing materials and mild steel nuts, bolts, washers, rubber / fibre board gaskets etc and testing complete all as specified & directed.
M&L GI pipe of 80 mm dia medium grade with all fittings complete laid in trenches including necessary taking up/down complete all as specified and directed.
M&L GI pipe of 50 mm dia medium grade with all fittings complete laid in trenches including necessary taking up/down complete all as specified and directed.
Supply, install, test and commission LT Panel board, TPN 415 Volts, 50 Hz, out door cubical type floor mounted CPRI approved factory made, double door dust and vermin proof IP-54, fabricated out of CRCA sheet not less than 3.15 mm thick with 2mm thick for internal compartment duly powder coated fixed on angle iron pedestal made out of 50x50x6 mm with cable chamber for individual feeders for incomming and outgoing connections, one set of LED indicator lamp RYB with switch and fuse and the panel board shall be provided with proper ventillation including suitable size of cable alley copper bus bar suitable for carrying of current 400 Amps with suitable connections from MCCB out going to main bus bar shall be carried out with TPN copper bus bars of suitable rating and connections from main bus bar to out going MCCB's (intake point) will be carried out with TPN copper bus bar as per MCCB rating duly insulated and colour coded heat shrinkable sleeve and shall be rigidly mounted on suitable size of bridge insulator including necessary PCC foundation of minimum 0.35 m height positioned and fixed with suitable nut, bolts, washers etc to the MC pedestal all as specified and directed comprising of the following :- (i) Incoming :MCCB 315 Amps 4 Pole 50 Hz 415 V with thermal magnectic release having rupturing capacity 36 KA - 1Nos (ii) Outgoing: MCCB 250 Amps 4 Pole 50 Hz 415 V with thermal magnectic release having rupturing capacity 25 KA - 2Nos. (iii) 3 Phase digital multi function meter model A, class 1, 5A with relay Vega Series - 1Nos (iv) Indicating lamp 240 volts LED type - set of three. (v) Fully automatic star delta starter suitable of 125 HP Centrifugal motor - 02 Nos (01 working and 01 standby) (vi) Single phase preventor (VSP-3) - 01 Nos (vii) Power capacitor of 50 Kvar capacity (20 Kvar- 02 Nos, 5 Kvar - 02 Nos) - 02 set
Supply, install, test and commission LT Panel board, TPN 415 Volts, 50 Hz, out door cubical type floor mounted CPRI approved factory made, double door dust and vermin proof IP-54, fabricated out of CRCA sheet not less than 3.15 mm thick with 2mm thick for internal compartment duly powder coated fixed on angle iron pedestal made out of 50x50x6 mm with cable chamber for individual feeders for incomming and outgoing connections, one set of LED indicator lamp RYB with switch and fuse and the panel board shall be provided with proper ventillation including suitable size of cable alley copper bus bar suitable for carrying of current 200 Amps with suitable connections from MCCB out going to main bus bar shall be carried out with TPN copper bus bars of suitable rating and connections from main bus bar to out going MCCB's (intake point) will be carried out with TPN copper bus bar as per MCCB rating duly insulated and colour coded heat shrinkable sleeve and shall be rigidly mounted on suitable size of bridge insulator including necessary PCC foundation of minimum 0.35 m height positioned and fixed with suitable nut, bolts, washers etc to the MC pedestal all as specified and directed comprising of the following :- (i) Incoming: MCCB 100 Amps 4 Pole 50 Hz 415 V with thermal magnectic release having rupturing capacity 16 KA - 1Nos . (ii) Outgoing: MCCB 63 Amps 4 Pole 50 Hz 415 V with thermal magnectic release having rupturing capacity 16 KA - 2Nos (iii) 3 Phase digital multi function meter model A, class 1, 5A with relay Vega Series - 1Nos (iv) Indicating lamp 240 volts LED type - set of three. (v) Fully automatic star delta starter suitable of 40 HP Centrifugal motor - 02 Nos (01 working and 01 standby) (vi) Single phase preventor (VSP-3) - 01 Nos
Supply, install, test and commission LT Panel board, TPN 415 Volts, 50 Hz, out door cubical type floor mounted CPRI approved factory made, double door dust and vermin proof IP-54, fabricated out of CRCA sheet not less than 3.15 mm thick with 2mm thick for internal compartment duly powder coated fixed on angle iron pedestal made out of 50x50x6 mm with cable chamber for individual feeders for incomming and outgoing connections, one set of LED indicator lamp RYB with switch and fuse and the panel board shall be provided with proper ventillation including suitable size of cable alley copper bus bar suitable for carrying of current 100 Amps with suitable connections from MCCB out going to main bus bar shall be carried out with TPN copper bus bars of suitable rating and connections from main bus bar to out going MCCB's (intake point) will be carried out with TPN copper bus bar as per MCCB rating duly insulated and colour coded heat shrinkable sleeve and shall be rigidly mounted on suitable size of bridge insulator including necessary PCC foundation of minimum 0.35 m height positioned and fixed with suitable nut, bolts, washers etc to the MC pedestal all as specified and directed comprising of the following :- (i) Incoming: MCCB 63 Amps 4 Pole 50 Hz 415 V with thermal magnectic release having rupturing capacity 16 KA - 1Nos (ii) Outgoing: MCCB 32 Amps 4 Pole 50 Hz 415 V with thermal magnectic release having rupturing capacity 16 KA - 2Nos (iii) 3 Phase digital multi function meter model A, class 1, 5A with relay Vega Series - 1Nos (iv) Indicating lamp 240 volts LED type - set of three. (v) Fully automatic star delta starter suitable of 10 HP Centrifugal motor - 02 Nos (01 working and 01 standby) (vi) Single phase preventor (VSP-3) - 01 Nos
M & L for Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for laying of GI pipe and getting out in any type of soil complete all as specified and directed.
M & L for Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm.complete all as specified and directed.
M & L for Removing excavated material n exc. 50m and depositing where directed at a level n exc. 1.5 m above the starting pointcomplete all as specified and directed.
Goswami Traders
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .