Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹11.7 L
EMD Value
₹11,710
Closing Date
31 Jan 2024, 3:00 pmClosed
Block Development Officer
Block Developement Office, Ammapettai
Strengthening BT to the Mela ADStreet Road in Deverayanpettai Panchayat Km 0/0-0/370
2024_RDTN_412200_1
793/2023/A2,Date..19.01.2024
Open Tender
Civil Works
Item Wise
90 days
Block Developement Office, Ammapettai
Strengthening BT to the Mela ADStreet Road in Deverayanpettai Panchayat Km 0/0-0/370
9 documents required · 9 mandatory
₹0
₹11,710
Yes
Block Developement Office, Ammapettai
3 Feb 2024
23 Jan 2024
31 Jan 2024
23 Jan 2024
31 Jan 2024
23 Jan 2024
24 Jan 2024
Amount
Strengthening BT to the Mela ADStreet Road in Deverayanpettai Panchayat Km 0/0-0/370
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in the following classification of soils as per etc., complete. Head stiff clay black cotton, hard red earth, shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders, for foundation SS20A
Picking the existing worn out BT surface to an average thickness of 50 mm and rerolling to proper camber including machinery charges and labour charges etc complete
Wet Mix Mecaddam Providing and Laying thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.21 cum for etc., complete complying withh standard specification.
Applying Prime COAT SS 1 Type over WBM surface at 4Kg / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over WBM surface at 4Kg / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
GST 18 % Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
S.NATARAJAN
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .