Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.7 LAccepted-Finance AT TULUSINAGAR PO PS BALANGIRI DIST BALANGIRI PIN 767001 | BALANGIR | ODISHA | 767001 | ₹27.7 L | L1 | Accepted-Finance Stood as 1st Lowest |
| 2 | L1₹27.7 LAccepted-Finance | ₹27.7 L | L1 | Accepted-Finance Stood as 1st Lowest |
| 3 | L1₹27.7 LAccepted-Finance | ₹27.7 L | L1 | Accepted-Finance Stood as 1st Lowest |
| 4 | L1₹27.7 LAccepted-Finance | ₹27.7 L | L1 | Accepted-Finance Stood as 1st Lowest |
| 5 | L1₹27.7 LAccepted-Finance | ₹27.7 L | L1 | Accepted-Finance Stood as 1st Lowest |
Tender Value
₹27.8 L
EMD Value
₹27,772
Closing Date
11 May 2026, 5:30 pmClosed
Superintending Engineer
Office of the SE, LSRRC and B Division, Balangir, Laltikra
Construction of two nos. of Anganwadi Centre in the RR Colony, Dhulusar of LSP, Balangir.
2026_CEEBO_128383_2
LSRRC AND BD-BGR-1/2026-27
Open Tender
Civil Works - Buildings
122 days
Dhulusar
Tender Cost, EMD,PAN,valid RC, valid GSTIN, Affidavit, No relation certificate, undertaking and any other document as per DTCN.
3 documents required · 3 mandatory
₹6,000
₹27,772
Yes
Office of the SE, LSRRC and B Division, Balangir,
20 May 2026
27 Apr 2026
12 May 2026
27 Apr 2026
11 May 2026
27 Apr 2026
27 Apr 2026 - 6 May 2026
6 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Excavation of foundation in hard or gravelly soil, stiff black cotton soil & stoney earth mixedwith boulder with all leads lifts and delifts including dressing, levelling the bed and depositing the excavated materials away from the work site including T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 68.48 | Cum | 276.9 | ₹18,962.11 | BI01010001010000000000000515BI0100001113 |
| 2 | Filling foundation and plinth with sand of approved quality,watered and rammed including cost & conveyance of all materials, royalty of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 68.48 | cum | 653.3 | ₹44,737.98 | BI01010001010000000000000515BI0100001114 |
| 3 | Back filling of excavated earth in foundation and plinth including T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 22.82 | Cum | 184.6 | ₹4,212.57 | BI01010001010000000000000515BI0100001115 |
| 4 | Cement Concrete M15 with 40 mm hard granite crusher broken aggregates metal per 1 cum free from weathered skin surface, dust and any other deleterious materials including rigid smooth centering machine mixing, watering, compacting with vibrators, hoisting and laying in position for a finished smooth surface and curing with all leads, lifts and delifts, hire and running charges of machineries construction including cost & conveyance of all materials, royalty of materials, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge.(ground floor) | 26.38 | cum | 4,971.6 | ₹1,31,150.81 | BI01010001010000000000000515BI0100001116 |
| 5 | RCC M20 with HG (CB) 20 mm size aggregates metal per 1 cum free from weathered skin surface, dust and any other deleterious materials including rigid smooth centering machine mixing, watering, compacting with vibrators, hoisting and laying in position for a finished smooth surface and curing with all leads, lifts and delifts, hire and running charges of machineries construction including cost & conveyance of all materials, royalty of materials, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge.(ground floor) | 60.16 | cum | 5,701.9 | ₹3,43,026.3 | BI01010001010000000000000515BI0100001117 |
| 6 | Fly ash brick (23cm x 11cm x 8 cm ) size having crushing strength not less than 75kg/cm2 with dimensional tolerance ±2% in cement mortar(1:6) in plinth and foundation including cost & conveyance of materials, royalty of materials, T & P required for the work,sundries, labour and labour cess etc complete as per specification and direction of Engineer-in-charge. | 10.42 | cum | 5,540.7 | ₹57,734.09 | BI01010001010000000000000515BI0100001118 |
| 7 | Fly ash brick (23cm x 11cm x 8 cm ) size having crushing strength not less than 75kg/cm2 with dimensional tolerance ±2% in cement mortar(1:6) in super structure including cost & conveyance of materials, royalty of materials, T & P required for the work,sundries, labour and labour cess etc complete as per specification and direction of Engineer-in-charge. (a) Ground Floor | 77.46 | cum | 5,574 | ₹4,31,762.04 | BI01010001010000000000000515BI01000011191 |
| 8 | 2.5 cm AS flooring with Cement Concrete (1:2:4) with 12 mm to 20 mm hard granite crusher broken aggregates metal per 1 cum free from weathered skin surface, dust and any other deleterious materials including cement punning, rigid smooth centering machine mixing, watering, compacting with vibrators, hoisting and laying in position for a finished smooth surface and curing with all leads, lifts and delifts, hire and running charges of machineries construction including cost & conveyance of all materials, royalty of materials, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 36.76 | cum | 398.1 | ₹14,634.16 | BI01010001010000000000000515BI01000011192 |
| 9 | Supply, fitting, fixing, straightening, bending, binding and placing in position of uncoated HYSD bar reinforcement complete including cost & conveyance of all materials, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 54.96 | qntl | 9,325.7 | ₹5,12,540.47 | BI01010001010000000000000515BI01000011193 |
| 10 | Rigid smooth centering and shuttering for R.C.C works including false works and dismentalling there after casting including cost, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. (a) Foundation & Plinth. | 198.6 | sqm | 249.3 | ₹49,510.98 | BI01010001010000000000000515BI01000011194 |
stage.html
html • 0.07 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
DTCN.pdf
Tender Documents • 2.21 MB
BOQ_588516.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid