| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 LAccepted-Finance SAMALESWARI NAGAR BURLA | BURLA | SAMBALPUR | ODISHA | L1 | Accepted-Finance SELECTED AS LOWEST QUOTED BIDDER | |
| 2 | L2₹6.2 L+₹76,846.32 (14.3%)Rejected-Finance | L2 | Rejected-Finance NOT SELECTED | |
| 3 | L3₹6.4 L+₹95,899.13 (17.8%)Rejected-Finance | L3 | Rejected-Finance NOT SELECTED | |
| 4 | L3₹6.4 L+₹95,899.13 (17.8%)Rejected-Finance | L3 | Rejected-Finance NOT SELECTED |
Tender Value
₹6.4 L
EMD Value
₹6,351
Closing Date
11 Aug 2026, 5:00 pmClosed
SE, BID, BURLA
O/O THE SE, BID, BURLA
Repair and Renovation of sub-ordinate staff rest room-cum-SDO qtrs. at Attabira Canal Sub-Division providing with Dura-shine sheet roofing over the roof slab for the year 2026-27
2026_CEBBU_137289_1
BID-04(02 OF 12)/26-27
Open Tender
Civil Works - Buildings
Percentage
45 days
BURLA
REFER DTCN
2 documents required · 2 mandatory
₹4,000
₹6,351
Yes
9 Oct 2026
1 Aug 2026
12 Aug 2026
1 Aug 2026
11 Aug 2026
1 Aug 2026
1 Aug 2026 - 11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Fabricating, supplying and erecting of (Rafter & Purline) M.S. framed work including fitting and fixing of all materials with cost conveyance, royalty, taxes and cost of all labour etc complete as per direction of the Engineer in charge. | - | Qntl | 12,499 | - |
| 2 | Supplying, fitting & fixing big size coloured coated Durashine roofing sheet including fixing of ridges, wind ties, cost of sheet, cost of fitting, drilling holes in wind ties etc complete as per direction of the Engineer in charge. | 221.55 | Sqm | 830.5 | ₹1,83,997.28 |
| 3 | Cement concrete(1:2:4) using 12mm size H.G.Chips including cost, conveyance, royalty,taxes of materials, labour,T&P, supervision, overhead, insurance , watering, curing with all leads and lifts and all other connected operations etc. all complete as per direction of the Engineerr-in-Charge. | 3.65 | Cum | 8,126.2 | ₹29,660.63 |
| 4 | 6mm thick Cement Plaster (1:4) to RCC surfaces fini shed smooth including closed deep chiping and slury treatment, cost, conveyance, royalty and taxes of all materials, labour, T&P, supervision, overhead, insurance, watering, curing with all leads and lifts and all other connected operations etc. complete as per direction of the Engineer-in-Charge. | 38.48 | Sqm | 206.4 | ₹7,942.27 |
| 5 | 12mm thick Cement Plaster in CM(1:6) over brick masonary including cost, conveyance& royalty and taxes of all materials to site of work with labour equipments, tackles complete in all respect and as per direction of the Engineer-in-Charge. | 13.14 | Sqm | 192.9 | ₹2,534.71 |
| 6 | Priming 1 coat with approved redoxide of asian paints of ISI marks reputed manufacturer including cost conveyance, taxes, labour caharges, T&P, supervision, ovehead insurances, cess, GST, contractor profit, scaffolding etc complete. | 95.55 | Sqm | 77.3 | ₹7,386.01 |
| 7 | Painting 2 coats with weather proof Apex exterior enamel paint of Asian paints of approved shade of ISI marks of reputed manufacturer to give an even shade including cost, coveyance,taxes, labour charges, T&P, supervision, OHC & CP, scaffolding, insurances, cess, GST and all other connected operation etc complete as per direction of the Engineer in charge. | 95.55 | Sqm | 165.2 | ₹15,784.86 |
| 8 | Rigid smooth centering & shuttering for R.C.C. foundation, plinth bend, and footing bases of columns mass concrete including false works and dismantling them after casting etc including cost & conveyance of materials with all leads, lifts, sundries and T&P etc. complete as per the direction of Engineer-in-charge. | 32.4 | Sqm | 249.8 | ₹8,093.52 |
| 9 | Washing and cleaning of old plastic cement paint and distemper on wall including cost of painting sponge etc complete in all respect with all labour,T&P,CESS,VAT etc and as per direction of the E.I.C | 352.57 | Sqm | 0.3 | ₹105.77 |
| 10 | Finishing wall surface of walls with Cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials, labour T&P etc. Complete as per direction of the Engineer-In-Charge. | 352.57 | Sqm | 88.1 | ₹31,061.42 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_603607.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.93 MB
DTCN2.pdf
Tender Documents • 2.00 MB
BOQ_603607.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .