| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹82.2 LAccepted-AOC VPO DODA SHRI MUKATSAR SAHIB | ₹82.2 L | L1 | Accepted-AOC Lowest Quoted Amount |
Tender Value
₹82.2 L
EMD Value
₹1.6 L
Closing Date
6 Feb 2026, 12:00 pmClosed
DSCO Keshav Kumar
Opposite Aggarwal Hospital, Kishanpura Road, Sangrur
Laying and Jointing of RCC UGPL Works, Fixing of ARV, AAV, GV/Sluice Valves, Construction of Haudies and all other allied works.
2025_DOA_152512_7
DSWC/SGR/2025-26/24
Open Tender
Pipe Laying Works
365 days
Sangrur
Please refer tender documents.
3 documents required · 3 mandatory
₹2,000
₹1.6 L
24 Mar 2026
26 Jan 2026
6 Feb 2026
26 Jan 2026
6 Feb 2026
26 Jan 2026
FINANCIAL BID NO.: DSWC/SGR/2025-26/24
Rates for Civil Works (Approved by CCS Punjab Chandigarh)
Name of the Firm/Bidder
Phone Number of Bidder Email id of Bidder
Total Estimated Amount of Work Rs.
Quoted by Contractor (As % less of Estimated Amount) Quote (+/-%)
Note: Please quote only figure (upto 2 decimal points) in above blue colour box in minus or plus. Do not put %age sign after this figure. Please check Quoted Rate in Next cell.
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline, lowering and jointing of 400 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - Andana (C/o 12424/L) (Extension), Tehsil-Moonak and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 883.58 /Cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 595 /Mtrs 71 Rupee Seventy One Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . /Joints 208 Rupees Two Hundred Eight Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (400 mm) 6 /Cut hole 105 Rupees One Hundred Five Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 3 /Cut hole 41 Rupees Fourty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (400 mm) /Riser & Valve 707 Rupees Seven Hundred Seven Only
Fixing of Air vent Pipes with C.C 1:2:4 (150 mm) /Air pipe Rupees Two Hundred Eighty Seven and Seventy Eight Paise Only
Fixing of Gate valves with C.C 1:2:4 (400 mm) 1 /Gate Valve 2052 Rupees Two Thousand Fifty Two Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Eighty Six Only
B.B.C 1:8:16 0.6 cum 3870 Rupees Three Thousand Eight Hundred Seventy Only
Plain Cement Concrete 1:2:4 0.14 cum 5104 Rupees Five Thousand One Hundred Four Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum Rupees Five Thousand Fourty Four and Thirty Five Paise Only
12.5 mm thick cement plaster work 1:4 15.32 cum 202.3 Rupees Two Hundred Two and Thirty Paise Only
RCC Slab 1:2:4 0.21 cum 8200.34 Rupees Eight Thousand Two Hundred And Thirty Four Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only
Total Cost for ONE Haudi
Total Cost for ONE Haudis
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 0 each 4000 Rupees Three Thousand Only
Road Cut 0 each 15000 Rupees Fifteen Thousand Only
Nimar for jointing the pipe 32.844 Kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2020 0 Ton 209.86 Rupees Two Hundred Nine and Eighty Six Paise Only
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency 0
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 300 mm Dia RCC Pipes, fixing of AVP, Risers, Construction of Haudies at Village - BHUTAL KHURD (C/o 3739/L), Tehsil-Moonak and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 4503 /Cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 3950 /Mtrs 84 Rupee Eighty Four Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . /Joints 116.9 Rupees One Hundred Sixteen and Ninety Paise Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (300 mm) 38 /Cut hole 75 Rupees Seventy Five Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 10 /Cut hole 41 Rupees Fourty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (300 mm) /Riser & Valve 487.53 Rupees Four Hundred Eighty Seven and Fifty Three Paise Only
Fixing of Air vent Pipes with C.C 1:2:4 (150 mm) /Air pipe Rupees Two Hundred Eighty Seven and Sixty Six Paise Only
Fixing of Gate valves with C.C 1:2:4 (300 mm) 13 /Gate Valve 1454.44 Rupees One Thousand Four Hundred Fifty Four and Fourty Four Paise Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Eighty Six Only
B.B.C 1:8:16 0.6 cum 3870 Rupees Three Thousand Eight Hundred Seventy Only
Plain Cement Concrete 1:2:4 0.14 cum 5102 Rupees Five Thousand One Hundred Two Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 5044 Rupees Five Thousand Fourty Four Only
12.5 mm thick cement plaster work 1:4 15.32 cum 202.2 Rupees Two Hundred Two and Twenty Paise Only
RCC Slab 1:2:4 0.21 cum Rupees Eight Thousand One Hundred Ninety Eight and Thirty Paise Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only
Total Cost for ONE Haudi
Total Cost for ELEVEN Haudis
Cost of Other Items
Providing and Fixing of jaal 1 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 1 each 4000 Rupees Three Thousand Only
Road Cut 0 each 15000 Rupees Fifteen Thousand Only
Nimar for jointing the pipe 123.872 Kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2020 219.063 Ton Rupees One Hundred Sixty and Thirty Paise Only
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency 0
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 450 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - SANGATPURA (C/o 34450/95150/L) (Extension), Tehsil-Lehra and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 15142.05 /Cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 9405 /Mtrs 71 Rupee Seventy One Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . /Joints 235.12 Rupees Two Hundred Thirty Five and Twelve Paise Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (450 mm) 83 /Cut hole 116 Rupees One Hundred Sixteen Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 20 /Cut hole 41 Rupees Fourty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (450 mm) /Riser & Valve 765.49 Rupees Seven Hundred Sixty Five and Forty Nine Paise Only
Fixing of Air vent Pipes with C.C 1:2:4 (150 mm) /Air pipe Rupees Two Hundred Eighty Seven And Seventy Eight Only
Fixing of Gate valves with C.C 1:2:4 (450 mm) 11 /Gate Valve 2172.88 Rupees Two Thousand One Hundared Seventy Two and Eighty Eight Paise Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Eighty Six Only
B.B.C 1:8:16 0.6 cum 3870 Rupees Three Thousand Eight Hundred Seventy Only
Plain Cement Concrete 1:2:4 0.14 cum 5104 Rupees Five Thousand One Hundred Four Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum Rupees Five Thousand Fourty Four and Thirty Five Paise Only
12.5 mm thick cement plaster work 1:4 15.32 cum 202.3 Rupees Two Hundred Two and Thirty Paise Only
RCC Slab 1:2:4 0.21 cum 8200.34 Rupees Eight Thousand Two Hundred And Thirty Four Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only
Total Cost for ONE Haudi
Total Cost for EIGHT Haudis
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 0 each 4000 Rupees Three Thousand Only
Road Cut 0 each 15000 Rupees Fifteen Thousand Only
Nimar for jointing the pipe 576.338 Kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2020 1133.592 Ton 172.94 Rupees One Hundred Seventy Two and Ninty Four Paise Only
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency 0
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 700 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - RATTAKHERA (C/o 44000/L) (Extension), Tehsil-Lehra and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 2342.81 /Cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 1125 /Mtrs 87 Rupee Eighty Seven Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . /Joints 388.2 Rupees Three Hundred Eighty Eight and Twenty Paise Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (700 mm) 10 /Cut hole 172 Rupees One Hundred Seventy Two Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 4 /Cut hole 41 Rupees Fourty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (700 mm) /Riser & Valve 1121.5 Rupees One Thousand One Hundred twenty One and Fifty Paise Only
Fixing of Air vent Pipes with C.C 1:2:4 (150 mm) /Air pipe 287.88 Rupees Two Hundred Eighty Seven And Eighty Eight Only
Fixing of Gate valves with C.C 1:2:4 (700 mm) 3 /Gate Valve 2921.68 Rupees Two Thousand Nine Hundared Twenty One And Sixty Eight Paise Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Eighty Six Only
B.B.C 1:8:16 0.6 cum 3871 Rupees Three Thousand Eight Hundred Seventy One Only
Plain Cement Concrete 1:2:4 0.14 cum 5106 Rupees Five Thousand One Hundred Six Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 5045 Rupees Five Thousand Fourty Five Only
12.5 mm thick cement plaster work 1:4 15.32 cum 202.25 Rupees Two Hundred Two and Twenty Five Paise Only
RCC Slab 1:2:4 0.21 cum 8202 Rupees Eight Thousand Two Hundred Two Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only
Total Cost for ONE Haudi
Total Cost for ONE Haudis
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 0 each 4000 Rupees Three Thousand Only
Road Cut 0 each 15000 Rupees Fifteen Thousand Only
Nimar for jointing the pipe 177.93 Kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2020 334.88 Ton 209.86 Rupees Two Hundred Nine and Eighty Six Paise Only
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency 0
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 300 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - SHERGARH (C/o 34100/R), Tehsil-Moonak and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 5825.4 /Cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 5110 /Mtrs 84 Rupee Eighty Four Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . /Joints 116.98 Rupees One Hundred Sixteen and Ninty Eight Paise Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (300 mm) 38 /Cut hole 75 Rupees Seventy Five Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 10 /Cut hole 41 Rupees Fourty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (300 mm) /Riser & Valve 487.53 Rupees Four Hundred Eighty Seven and Fifty Three Paise Only
Fixing of Air vent Pipes with C.C 1:2:4 (150 mm) /Air pipe Rupees Two Hundred Eighty Seven And Sixty Six Only
Fixing of Gate valves with C.C 1:2:4 (300 mm) 15 /Gate Valve 1454.44 Rupees One Thousand Four Hundred Fifty Four and Fourty Four Paise Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Eighty Six Only
B.B.C 1:8:16 0.6 cum 3870 Rupees Three Thousand Eight Hundred Seventy Only
Plain Cement Concrete 1:2:4 0.14 cum 5102 Rupees Five Thousand One Hundred Two Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 5044 Rupees Five Thousand Fourty Four Only
12.5 mm thick cement plaster work 1:4 15.32 cum 202.2 Rupees Two Hundred Two and Twenty Paise Only
RCC Slab 1:2:4 0.21 cum Rupees Eight Thousand One Hundred Ninty Eight and Thirty Paise Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only
Total Cost for ONE Haudi
Total Cost for THIRTEEN Haudis
Cost of Other Items
Providing and Fixing of jaal 1 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 1 each 4000 Rupees Three Thousand Only
Road Cut 0 each 15000 Rupees Fifteen Thousand Only
Nimar for jointing the pipe 160.25 Kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2020 282.631 Ton Rupees One Hundred Sixty and Thirty Paise Only
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency 0
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 350 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - LEHAL KALAN (C/o 4170/R) (Extension), Tehsil-Lehra and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 1071.53 /Cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 785 /Mtrs 76 Rupee Seventy Six Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . /Joints Rupees One Hundred Sixty and Seventy Paise Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (350 mm) 9 /Cut hole 95 Rupees Ninty Five Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 4 /Cut hole 41 Rupees Fourty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (350 mm) /Riser & Valve 570.75 Rupees Five Hundred Seventy and Seventy Five Paise Only
Fixing of Air vent Pipes with C.C 1:2:4 (150 mm) /Air pipe 287.88 Rupees Two Hundred Eighty Seven And Eoghty Eight Paise Only
Fixing of Gate valves with C.C 1:2:4 (350 mm) 2 /Gate Valve 1736 Rupees One Thousand Seven Hundared Thirty Six Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Eighty Six Only
B.B.C 1:8:16 0.6 cum 3871 Rupees Three Thousand Eight Hundred Seventy One Only
Plain Cement Concrete 1:2:4 0.14 cum 5106 Rupees Five Thousand One Hundred Six Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 5045 Rupees Five Thousand Fourty Five Only
12.5 mm thick cement plaster work 1:4 15.32 cum 202.25 Rupees Two Hundred Two and Twenty Five Paise Only
RCC Slab 1:2:4 0.21 cum 8202 Rupees Eight Thousand Two Hundred Two Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only
Total Cost for ONE Haudi
Total Cost for THREE Haudis
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 0 each 4000 Rupees Three Thousand Only
Road Cut 0 each 15000 Rupees Fifteen Thousand Only
Nimar for jointing the pipe 28.888 Kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2020 68.904 Ton 172.94 Rupees One Hundred Seventy Two and Ninty Four Paise Only
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency 0
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 300 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - BHATHUAN (C/o 23280/L) (Extension), Tehsil-Moonak and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 723.9 /Cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 635 /Mtrs 84 Rupee Eighty Four Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . /Joints 117 Rupees One Hundred Seventeen Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (300 mm) 6 /Cut hole 75 Rupees One Hundred Twenty Seven Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 2 /Cut hole 41 Rupees Fourty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (300 mm) /Riser & Valve 487.87 Rupees Four Hundred Eighty Seven and Eighty Seven Paise Only
Fixing of Air vent Pipes with C.C 1:2:4 (150 mm) /Air pipe 287.88 Rupees Two Hundred Eighty Seven and Eighty Eight Paise Only
Fixing of Gate valves with C.C 1:2:4 (300 mm) 2 /Gate Valve 1454.78 Rupees One Thousand Four Hundred Fifty Four and Seventy Eight Paise Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Eighty Six Only
B.B.C 1:8:16 0.6 cum 3871 Rupees Three Thousand Eight Hundred Seventy One Only
Plain Cement Concrete 1:2:4 0.14 cum 5106 Rupees Five Thousand One Hundred Six Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 5045 Rupees Five Thousand Fourty Five Only
12.5 mm thick cement plaster work 1:4 15.32 cum 202.25 Rupees Two Hundred Two and Twenty Five Paise Only
RCC Slab 1:2:4 0.21 cum 8202 Rupees Eight Thousand Two Hundred Two Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only
Total Cost for ONE Haudi
Total Cost for ONE Haudis
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 0 each 4000 Rupees Three Thousand Only
Road Cut 0 each 15000 Rupees Fifteen Thousand Only
Nimar for jointing the pipe 19.914 Kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2020 35.209 Ton Rupees One Hundred Sixty and Thirty Paise Only
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency 0
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 400 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - KHANDEBAD (C/o 85181/R) (Extension), Tehsil-Lehra and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 727.65 /Cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 490 /Mtrs 71 Rupee Seventy One Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . /Joints 208 Rupees Two Hundred Eight Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (400 mm) 4 /Cut hole 105 Rupees One Hundred Five Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 1 /Cut hole 41 Rupees Fourty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (400 mm) /Riser & Valve 707 Rupees Seven Hundred Seven Only
Fixing of Air vent Pipes with C.C 1:2:4 (150 mm) /Air pipe 287 Rupees Two Hundred Eighty Seven Only
Fixing of Gate valves with C.C 1:2:4 (400 mm) 1 /Gate Valve Rupees Two Thousand Fifty and Fifty Five Paise Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Eighty Six Only
B.B.C 1:8:16 0.6 cum 3870 Rupees Three Thousand Eight Hundred Seventy Two Only
Plain Cement Concrete 1:2:4 0.14 cum 5104 Rupees Five Thousand One Hundred Eight Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum Rupees Five Thousand Fourty Five and Twenty Five Paise Only
12.5 mm thick cement plaster work 1:4 15.32 cum 202.3 Rupees Two Hundred Two and Twenty Five Paise Only
RCC Slab 1:2:4 0.21 cum 8200.34 Rupees Eight Thousand Two Hundred Four Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only
Total Cost for ONE Haudi
Total Cost for ZERO Haudis
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 0 each 4000 Rupees Three Thousand Only
Road Cut 0 each 15000 Rupees Fifteen Thousand Only
Nimar for jointing the pipe 27.048 Kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2020 0 Ton 209.86 Rupees Two Hundred Nine and Eighty Six Paise Only
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency 0
Grand Total (A+B+C+D+E+F+G+H)
Credit of Damaged lined water channel existing on site to be deducted from the bill of Agency 0
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
NIRUGPL252624.pdf
Tender Documents • 0.50 MB
DNITUGPL252624.pdf
Tender Documents • 1.16 MB
FBUGPL252624.xls
Additional Documents • 0.18 MB