Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.6 LAdmitted-Finance 159B M G ROAD HARIDEVPUR KOLKATA WEST BENGAL 700082 UDYAM WB 10 0018308 | KOLKATA | WEST BENGAL | 700082 | L1 | Admitted-Finance | ||
| 2 | L2₹2.6 L+₹4,020.24 (1.56%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹2.6 L+₹6,873.32 (2.66%)Admitted-Finance 2129 DR SARADA PRASAD GHOSH STREET KOLKATA WB 700127 | 24 PARAGANAS NORTH | WEST BENGAL | 700127 | L3 | Admitted-Finance |
Tender Value
₹2.6 L
EMD Value
₹5,190
Closing Date
21 Jan 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER (WATER SUPPLY
OFFICE OF THE EXECUTIVE ENGINEER (WATER SUPPLY) GARDEN REACH WATER WORKS, BIDHANGARH, KOL-66
STRENGTHENING OF LEAKY PORTION ON 1050 MM DIA GANDHI MAIDAN DEDICATED LINE ON KARBALA ROAD AND 150 MM DIA QUARTER SERVICE LINE INSIDE GRWW WITH OTHER ALLIED WORKS.
2026_KMC_983118_1
EEWS/KMC/GRWW/25-26/121
Open Tender
MECHANICAL
Percentage
7 days
INSIDE GRWW.
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹5,190
2 Feb 2026
5 Jan 2026
24 Jan 2026
5 Jan 2026
21 Jan 2026
5 Jan 2026
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete (c)Depth of excavation for additional depth beyond 3000 mm. upto 4000mm. excluding cost of shoring as necessary.
Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as per direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge).(a) Depth upto 1.5 m.
Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as per direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge)(b) For additional depth beyond 1.5 m. and upto 3.00 m
Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as per direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge)(c) For additional depth beyond 3.00 m.
Hire and labour charges for 100 mm dia bamboo railing on 150 mm dia Jhau/Eucalyptus or other approved timber posts each 2.0 m in length, tied 2 number post strongly with coir ropes in the fashion of a scissor with a spacing of 1.8 m over pacca road without damaging the surface and tying strongly 3 (three) rows of bamboo railing on each leg and 1 (one) railing connecting all the pivot junctions including cost of loading unloading, stacking & carriage of all materials and labour complete, and maintaining barricading for a period beyond 5 (five) days after the reported & recorded time of completion of the entire work to the satisfaction of Engineer-in- Charge. (Note: This work should not be executed without specific permission of Superintending Engineer). (100 mm. dia bamboo railing & 150mm. dia Jhau/Eucalyptus/other approved timber posts @ 1.80m apart). (ii) Railing 3 row on each leg and 1 at pivot point.
MS PLATE AS PER IS: 2062-2011/ LATEST REVISION, MAKE: SAIL/TATA/JINDAL THICKNESS: 2 MM TO 10 MM
Fabricating M.S. pipes of different diameter in shop out of 8mm to12mm thick M.S plates supplied depart-mentally, cutting the plates to exact size & shape by gas cutting device and/or by adopting any other approved type of mechanical means, bending the same in true curvature by template and rolling machine of approved design includingproper marking, levelling joints followed by electric arc welding as per relevant I.S. specification - longitudinal and circumferential, as necessary, usiug standard electrodes including edge preparation, electricity charges and hydraulic testing of the fabricated piece all complete as per speci-fication and direction of the Engineer-in-Charge. [The Engineer-in-Charge shall approve the electrodes for arc weldingbefore use.]a) Diameter from 450 mm & upto600 mm.f)1000 mm dlameter i)10mm thick
Welding in M.S.structural work with gas or electric: (a) Tack weld
Welding in M.S.structural work with gas or electric: (B) Continuous Weld
Application of two coats of Epoxy primer as per BS 5493 by brush on the cleaned dry concrete surface with epoxy resin primer with reactive suitable hardener mixture as per specification and direction of EIC all complete. [This item will be operated on prior permission from the concerned SE/Dy Chief Engineer]
Coating of 'Epoxy' Resin of thickness not less than 160 micron with a lowviscosity,crystallization-resistant epoxy resin base with a reactive diluents combined with high build epoxy amine adducts as per BS 5493 standard and a polyamide or amido polyamine or any other suitable hardener. It shall react with epoxy resin at normal ambient temperature, suitable for solvent-free coatings as per recommended proportion for use on metal,concrete and wood surface to protect from corrosion as well as damagefrom chemical reaction after making the surface free from dust, oil and moisture etc. all complete as per instruction and to the satisfaction of ElC. [This item will be operated on prior permission from the
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation.
Hiring charge of 1 no. 125KVA 3 Phase silent DG set including supply & fixing of 400 Amp 4 pole changeover switch and laying of required capacity and lenght of cable with connection as reqd. (on temporary basis) and engaged one generator operator round the clock to run the generator as and when required(Including Fuel).
Hire charges of moveable type mounted earth excavator having minimum cutter size (1.0 cubic meter) & loader size (2.0 meter length x 0.75m width) for cutting & removal of any kind of soil, spoli etc. including cost of fuel, lubricants & manpower etc. in Water Supply Works. [ This item will be operated on prior permission from the concerned SE/Dy. Chief Engineer] For minimum engagement of 8 hrs. In a day
Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages.
Dewatering by pumps including all leads, lifts and making all arrangements of disposal. where continuous flow of water from a source other than natural or ground water is encountered in case of emergency maintenance works related to leakage. breakage and making wet connections. [Note ;- In case of any other situation demanding such emergency dewatering. use of this item is to be approved by the Superintending Engineer/Tender Accepting Authority. This item shall be executed on the specific direction duly supported by proper clarification of the E.I.C. who will be satisfied in absolute discretion that such work has not been necessitated due to any natural source of water or any fault of the Contractor]
Lead jointing to C.I pipes and specials with supply of lead and spun yarn all complete to make the joint water tight at required hydraulic pressure as per specification & direction of the Engineer-in-charge. (Lead shall be supplied departmentally to the Agency at specified Issuerates and cost thereof shall be recovered from the. works Bill of the Agency] Diameter in mm 150mm dia
Supplying including cost of installation of C.I. Leak Repair Clamps suitable for permanent repair of leakages in Socket / Spigot joints in C.I. Spun Pipes (as per IS: 1536) and D.I. Pipes (as per IS: 8329). The Clamp consists of two Cast Iron Rings supplied in overlapping semi circular halves which compress a specially shaped / contoured rubber gasket made of EPDM quality (IS:5382 Type-4) on the socket face making the Socket / Spigot Joint water right at the operating pressure. The Clamp to be supplied complete with Rubber Gaskets made of EPDM quality and coated Nut Bolts as per manufacturer specification. Fitting and fixing should be in proper position with proper care of main pipe line for leak proof condition. Diameter in mm 150
Cleaning rubbish, sludge, weeds scum, liquid earth, mud etc.etc.from road side masonary drain/ hume pipe drain/ culvert etc. by mathor labour after removing concrete.Slab/manhole cover etc.without damaging the same and refixing the same properly after cleaning as necessary and removing thesludge etc.etc.by using iron pans,buckets including all labour, tools & plants including removing the spoils in dry condition and disposing thesame by truck beyond the road side in conformity with municipal/corporation rules for such disposal including loading into truck and cleaning the road side in all respects as per direction of the Engineerin- Charge. (Payment will be made on the basis of actual stack measurment of spoils in dry condition at roadside)
Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m In ground floor including roof. (a) upto 150 mm. thick
Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. a) Pakur Variety
Supplying sign-board made of 25 mm thick sal plank with frame on all side of sal batten 50 mm x 32 mm with nailed on post 3.15mx100mmx100mm and fitting fixing such with digging holes of dia 300 mm and depth 750 mm in all sorts of soil and repacking and consolidating the gap around the post with cement concrete (1 : 3 : 6) painting 2 coats including cost of nails, bolts and nuts etc. complete in all respect as per direction of the Engineer-in-charge.Payment of concrete and painting to be made separately. (ii) 900 mm. x 600 mm. size of board.
HIRE and labour charges for diesel generating set for lighting including fuel, 300 m wire, 11 points with 200 watt bulb with post for handling & maintaining the same for day & night for the period.
Sub Total
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.34 MB
BOQ_2398727.xls
BOQ • 0.38 MB
TBID121.pdf
Tender Documents • 0.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .