Loading…
Loading…
Tender ID
| # | Company | Amount |
|---|---|---|
| 1 | ₹2.2 Cr |
Tender Value
₹2.3 Cr
EMD Value
₹1 L
Closing Date
12 Feb 2026, 5:00 pmClosed
Abhay Kumar
APCCF-cum-Special Secretary
Old Secretariat, Sinchai Bhawan, Patna
Abhay Kumar
APCCF-cum-Special Secretary
Setting an Integrated Forest and Wildlife Control Room envisioned to be implemented will be a state-of-the-art facility, staffed with highly trained personnel and equipped with advanced technology to effectively manage various aspects of wildlife-related issues. The bidder shall design, procure, supply, implement, commission, operationalize, test, UAT, Go-Live, support, and maintain the control room and related equipment and software for a period of 2 years from the date of installation and Commissioning and successful user acceptance test along with setting up of an ancillary control center at one location in field with its 1 year maintenance.
124071
03/e-PROC/VTR/2025-26
Short Tender
IT-Related-works
Patna
• Name of the Bidder
• Name of the Agency/Company
• Address of the Agency/Company
• PAN No.
• GST Registration No.
• Contact No.
• Email Id
IT-Related-works
ITEM RATE
L1
1
20 documents required · 20 mandatory
₹1,000
Processing Fee: 3540
₹1 L
Yes
In the office of the Director, Ecology and Environment, Aranya Bhawan , Patna
18 Feb 2026
30 Jan 2026
13 Feb 2026
1 Feb 2026
12 Feb 2026
1 Feb 2026
6 Feb 2026
Inbound call distribution system with Backup
Inbound call distribution - Set Up Inbound call distribution system is responsible for receiving the distress calls from different people from Our office region to raise the issue and log/inform the problem. This system will receive call on a dedicated phone number and will distribute among the customer agents sitting inside the control room.
SIP LINE (10 Lines) with backup - Call waiting time should be reduced so there should not be waiting for caller.
Call recording and Data Backup - Services – Cloud based object storage service.
Forest Incident management system
Incident management system
Incident management system
Alerting Software
Alerting Software
Alerting Software - Support & Operation : Production support cost for application and operational cost for technical support of the application.
FRV Monitoring Software
FRV Monitoring Software - Development & Installation : Field Response Vehicle system is management and handling the field vehicles with Android device mounted on vehicles. Alerts are sent to these response vehicles based on the incidence. Also, these systems manages the location of vehicles which could be displayed. Geofencing and location alerts would be part of this application. Locations are to be displayed on control room
FRV Monitoring Software - Support & Operation: Production support cost for application and operational cost for technical support of the application.
Reporting Software
Reporting Software Development & Installation: Reporting software involves analysis and data collection and graphical plotting. Application collects data from other systems and relate the data to show a complete picture of the analysis of incidences and actions with response time.
Reporting Software Support & Operation: Production support cost for application and operational cost for technical support of the application.
Cloud Services
Cloud Servers (QTY 5) • 2vCPU
Vulnerability Assessment report
Vulnerability Assessment report - Security: Security assessment report for application from third party vendor from govt empanelled agency for security audits of applications.
Notifications (Email, SMS)
Notification Service (Email, SMS) Notifications are to be sent to various users as per Alert Application.
75-inch or larger Smart TV with 4K display and HDMI
75 Inch or larger Monitors Screen
Tablets
Android Devices on Vehicles - These are systems with touch screens are to be mounted on Field vehicles. These systems will have pre-installed app installed. These systems will have power connectors to get connected with the Vehicle Battery for power requirements.
GPS Sims from telecom provider for data communication
Computer Systems
• Processor: Intel Core i5 12 Gen
Wiring and Installation
Networking
WAN Internet Connection 75 Mbps or Above
Maintenance and Support
Cloud Server 5, Computer Systems 4 & Networking
Inbound call distribution system with Backup
Items
Software & Hardware System (for 1st year)
Next year maintenance of Software (for 2nd Year)
New Mobile control Room Setup, Maintenance.
aoc.json
Purchase Order
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NIT 03-2025-26 Forest Intergrated Control Room final.pdf
NIT • 1.04 MB
Financial excel sheet.xlsx
NIT • 0.02 MB
C1 06.02.2026 Corrigendum 03eproc.pdf
Corrigendum • 2.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .