Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.3 LAdmitted-Finance | -47.00% | ₹1.3 L | L1 | Admitted-Finance |
| 2 | L2₹1.5 L+₹17,506.46 (13.2%)Admitted-Finance | -40.00% | ₹1.5 L+₹17,506.46 (13.2%) | L2 | Admitted-Finance |
| 3 | L3₹1.6 L+₹22,508.31 (17.0%)Admitted-Finance | -38.00% | ₹1.6 L+₹22,508.31 (17.0%) | L3 | Admitted-Finance |
| 4 | L4₹1.7 L+₹34,687.80 (26.2%)Admitted-Finance | -33.13% | ₹1.7 L+₹34,687.80 (26.2%) | L4 | Admitted-Finance |
| 5 | L5₹1.7 L+₹34,737.82 (26.2%)Admitted-Finance | -33.11% | ₹1.7 L+₹34,737.82 (26.2%) | L5 | Admitted-Finance |
Tender Value
₹2.5 L
EMD Value
₹7,500
Closing Date
8 Aug 2026, 1:30 pmClosed
DFO Kishtwar
Forest Complex Sarkoot Kishtwar
BOQ
2026_FD_316810_1
14 of 2026
Open Tender
Agricultural or Forestry
Percentage
60 days
Nagseni Range
SBD
2 documents required · 2 mandatory
₹600
DFO Kishtwar
₹7,500
27 Aug 2026
20 Jul 2026
11 Aug 2026
20 Jul 2026
8 Aug 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared | 97.58 | Sqm | 12.49 | ₹1,218.77 |
| 2 | Earth work in excavation by manual means over areas (Exceeding 30 em and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in All kinds of Soil | 43.76 | Cum | 479.3 | ₹20,974.17 |
| 3 | Providing and laying in position cement concrete of specified grade excl. the cost of centering and shuttering, all works upto plinth level 1:5:10 (1cement : course sand : 10graded stone) aggregate 40mm nominal size crushed. | 3.93 | Cum | 4,826.5 | ₹18,968.15 |
| 4 | Providing and laying in position cement concrete of specified grade excl. the cost of centering and shuttering, all works upto plinth level 1:3:6 (1cement : course sand : 10graded stone) aggregate 40mm nominal size crushed. | 14.2 | Cum | 5,733.8 | ₹81,419.96 |
| 5 | Centring and shuttermg including strutting, propping etc. and removal of form for· Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc. | 58.64 | Sqm | 628.95 | ₹36,881.63 |
| 6 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 50mm thick with 12.5 mm nominal size stone aggregate. | 26.77 | Sqm | 562.15 | ₹15,048.76 |
| 7 | Carriage of materials from source to site of work by M.T. Sand av. 27 km and HL 2000 mtr | 10.53 | Cum | 2,391.8 | ₹25,185.65 |
| 8 | Carriage of materials from source to site of work by M.T. Bajri av. 27 km and HL 2000 mtr | 21.07 | Cum | 2,391.8 | ₹50,395.23 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
BOQ_1035142.xls
BOQ • 0.31 MB
2026_FD_316810_1.pdf
PDF • 2.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .