Loading…
Loading…
Tender Value
₹21.1 L
EMD Value
₹42,200
Closing Date
20 Jul 2026, 3:00 pm
EXECUTIVE ENGINEER NALANDA BUILDING DIVISION BIHARSHARIF
EE
NALANDA BUILDING DIVISION BIHARSHARIF
SUPERINTENDING ENGINEER PATNA CIRCLE
SE
RAISING OF PERIMETER WALL (UP TO 21"FT ) AT SUB JAIL HILSA IN DIST- NALANDA FOR YEAR 2026-2027
134818
NIT 1/BCD/NALANDA/2026-27 GR 2
Open Tender
CIVIL
Nalanda
• AS PER NIT
CIVIL
PERCENTAGE
L1
1
8 documents required · 8 mandatory
₹5,000
Processing Fee: 590
₹42,200
AT SE OFFICE , PATNA CIRCLE, BCD 02-07-2026 03:00 pm
25 Jun 2026
25 Jun 2026
21 Jul 2026
25 Jun 2026
20 Jul 2026
25 Jun 2026
2 Jul 2026
B.O.Q. OF RAISING OF PERIMETER WALL (UP TO 21"FT ) AT SUB JAIL HILSA IN DIST- NALANDA FOR YEAR 2026-2027
B.O.Q. AMOUNT :- 2108398
SL.NO. S.O.R NO. PARTICULAR ITEMS WISE QTY UNIT RATE AMOUNT
1 15.2.2 Demolishing cement concrate Including Disposal of Material…etc .com 32.70 CUM 599.8 19613
2 15.7.4 Demolishing brick work including stacking of serviceable materialand disposal of unserviceable material within 50 meters lead: 16.55 CUM 823.7 13632
3 5.9 Centring and shuttering including strutting,propping etc. and removal of
5.9.5 Lintels, beams, plinth bams, griders, bressumers andcontilevers 174.42 SQM 404.7 70588
5.9.6 Columns,Pillars, Piers, Abutments, Posts and Struts 87.12 SQM 494.4 43072
4 5.33.A Providing and laying in position machine batched, machine mixed andmachine vibrated design mix cement concrete of specified grade forreinforced cement concrete structural elements, excluding the cost ofcentring, shuttering finishing and reinforcement, M-20 grde reinforcdcement concrete
5.33A.2.2 Beams, planth beams, girders, bressumers, contilevers,Suspended floors lintels roofs and staircases including spiralstaircases, shelves etc. 49.48 cum 5677.20 280908
5 5.22 Reinforcement for RCC work including straightening. Cutting, bending, placing in position and binding all complete.
5.227A Thermo-Mechanically Treated bars TMTC-500-8mm dia 1635.00 KG 94.5 154508
5.22.7B Thermo-Mechanically Treated bars TMTC-500-10mm dia 2943.00 KG 92.6 272522
5.22.7C Thermo-Mechanically Treated bars TMTC-500-12mm dia 1962.00 KG 90.8 178150
6 13.12 15 mm cement plaster on rough side of single or half brick wall of mix.
13.12.4 1:6 (1 cement: 6 coarse sand) 506.80 SQM 162.80 82507
7 13.116 Forming groove of uniform size from 12x12 mm and upto 25x15 mm in plastered surface as per approved pattern using wooden battens, nailed to the under layer including removal of wooden battens, repairs to the edges of plaster panel and finishing the groove complete as per specifications and direction of the Engineer-in-Charge 506.80 MTR 47.1 23870
8 13.78 Applying one coat of cement primer of approved brand and manufacture on wall surface
13.78.1 Cement primer 3696.59 SQM 38.60 142688
9 13.79 Finishing walls with water proofing cement paint of approved brand and manufacture and of required shade to give an even shade
13.79.1 New work (three or more coats) 506.80 SQM 81.20 41152
13.79.2 Old work (one or more coats) 3191.89 SQM 61.10 195024
10 10.33.4 Labour for fitting and fixing barbed wire fencing in six rows horizontal up to a height of 1.85m and two diagonals including fixing of post in cement concrete at 2.5m centres including cost of staples (but excluding the cost of cement concrete, angle, iron post, its cutting and making holes, nuts & bolts) all complete as per building specification and direction of E/l. 581.40 MTR 74.6 43372
11 10.33.6 Drilling 6mm Dia. In M.S. angle iron for fixing of staples etc. as per building specification and direction of E/l. 1452.00 NOS 9.00 13068
12 16.18 Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used.
16.18.1 With G.I. barbed wire 4651.20 MTR 15.80 73489
13 10.32 Steel work welded in built up sections/framed worK including cuttinghoisting, rixing in position and applying a priming coat of approved steelprimer using structural steel, etc. as required.
10.32.2 In gratings, frames, guard bar, ladders, railings, brackts. gates &similar works 1796.85 KG 114.60 205919
14 13.81 Applying priming coat:
13.81.3 With ready mixed zinc chromate yellow primer ofapproved brand and manufacture on steel galvanizediron/steel works 45.74 SQM 34.60 1583
15 13.82 Painting with ready mixed paint of approved brand and manufacture
13.82.1 New steel work (two or more coats) 45.74 SQM 83.50 3819
16 ###### Carriage of Materials
Coarse Sand 30.15 cum 655.05 19750
Stone Chips 42.06 cum 2758.74 116033
17 ###### Difference cost of Materials
Cement 446.40 PER BAG 13.15 5870
Total Amount Rs= 2108398
Executive Engineer
Nalanda Building Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NIT. E.T 01.pdf
NIT • 1.41 MB
BOQ RAISING PERIMETRE WALL Sub-Jail Hilsa.xlsx
NIT • 0.02 MB
Download all tender documents and submit your bid