Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.2 L+₹16,119.58 (7.90%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹2.2 L+₹16,132.74 (7.91%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹2.4 L+₹34,450.29 (16.9%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹3.0 L+₹92,196.47 (45.2%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.3 L
EMD Value
₹9,870
Closing Date
11 Jul 2026, 6:00 pmClosed
office of the executive engineer rew ang
office of the executive engineer rew ang
P BUND NALLAH DANGI NEAR GRAVEYARD BONPOIRA BLOCK SHAHABAD
2026_RDPR_314717_12
ENIT50of2026-27
Open Tender
Civil Works
Percentage
30 days
anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹9,870
14 Jul 2026
6 Jul 2026
13 Jul 2026
6 Jul 2026
11 Jul 2026
6 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earthwork in excavation by manual means in trenches for foundations etc ( exceeding 1.5m in width) and exceeding 10 sqm on plan,depth upto 1.5m including disposal of excavated earth upto 1m from cutting edge,disposed earth to be levelled and neatly dressed. | 20.72 | cum | 479.3 | ₹9,931.1 |
| 0.0 | Supply and providing of stone soling hand packed tightly in bed & concrete including levelling & ramming and carriage of 5 kms inl HL OF 75 mtr | 3.67 | cum | 1,337.9 | ₹4,910.09 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 | 41.2 | cum | 5,733.5 | ₹2,36,220.2 |
| 0.0 | PLUMS @20% | 10.36 | cum | - | - |
| 0.0 | Centering and shuttering including strutting,
propping etc. and removal of form work | 51 | sqm | 286.35 | ₹14,603.85 |
| 0.0 | carriage of materials sand /agg BY MT 15 KM and hl 75mtr | 55.75 | cum | 605.6 | ₹33,762.2 |
| 0.0 | Provision for pvc weep holes 75mm dia incl. all charges | 125 | rmtr | 110 | ₹13,750 |
| 0.0 | signboard/photograph | 1 | no | 2,000 | ₹2,000 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.34 MB
BOQ_1019354.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .