Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹2.4 Cr
EMD Value
₹3.1 L
Closing Date
23 Nov 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
GE(AF) E/M CHAKERI
O/o GE(AF) E/M CHAKERI
ADDN ALTN IMPROVEMENT TO AC PLANT AT 101 and 110 BLOCK AT AFS KANPUR.
2026_MES_795843_1
8848/E8
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
area under GE(AF) E/M CHAKERI
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,000
GE(AF) E/M CHAKERI
₹3.1 L
Yes
27 Oct 2026
27 Oct 2026
30 Nov 2026
27 Oct 2026
23 Nov 2026
16 Nov 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Shifting and Relocation of AHU (02 Nos of 21760 CFM) from Block 110 to Block 101 by complete dismantling AHU from foundation incl electrical connection from panel,motor,incl misc civil work, incl misc electrical wiring work and refixing the same AHU at AHU room of adjacent 101 Block and re assembling the parts,conecting all accesories of AHU, making good for use and re-commisioning complete all as as specified & directed by the Engr-in-charge | 2 | Each job | 1.25 | ₹2.5 |
| - | Supply , install , commissioning and testing of Double Skin Floor Mounted Air Handling Unit with 6 Rows Deep Coil of nominal capacity 35000 CFM complete all as specified and directed by Engg-in- charge. | 2 | Each | - | - |
| 3Supply, laying, jointing, testing and commissioning of factory pre-insulated bonded chilled-water (CHW) piping for outdoor above-ground installation, complete in all respects, comprising: Carrier pipe: Carbon-steel pipe to IS 3589, Fe 410 (or as shown on drawings), bevelled ends for welding, surface prepared and primed for foam adhesion. Insulation: Rigid PUF/PIR, closed-cell ≥90%, density 60–80 kg/m³, thermal conductivity λ ≤ 0.028 W/m·K @ 24 °C, water absorption ≤2% (24 h), compressive strength ≥0.30 MPa; foam fully bonded to carrier and jacket (bonded system) conforming to EN 253. Outer jacket: UV-stabilised HDPE casing, minimum thickness as per EN 253 by size (approx. 2.5–3.5 mm), suitable for continuous outdoor exposure; continuous vapour barrier across joints. Field joints: HDPE sleeves/couplers with electro/butt-fusion or heat-shrink system and injected PUF/PIR to restore full thickness; vapour stops each side; jointing to EN 489/EN 448 or OEM standard. Supports & bridges: High-density insulation inserts/saddles (≥160 kg/m³) at supports, same thickness as line insulation; SS bands/clamps; guides/stops as per layout to control expansion. Valves & appurtenances (insulation): Removable PIR/PUF insulation boxes for all inline valves/strainers/instruments on the route, same insulation thickness as line, fully vapour-sealed to adjoining jacket; quick-release closures. Identification: Flow arrows, colour bands and line IDs on jacket at ≤15 m intervals and at fittings/branches. Measurement: Per running metre along pipe centreline between terminal points, including expansion offsets/loops. No separate measurement for bends, reducers, tees, end-caps, field joints, vapour stops, support inserts/saddles, guides/stops, removable valve/strainer/instrument insulation boxes, clamps/bands, markers/labels—deemed included in the rate. Exclusions (measured elsewhere): Supply of valves/instruments; major structural steel support frames and civil pedestals if required (standard clamps/shoes/inserts are included). Rate to include: Supply of carrier pipe, insulation, HDPE jacket, all factory/field joint kits and consumables, fittings/specials (bends/tees/reducers/end-caps), removable insulation boxes for all inline items on the route, support inserts and standard supports, guides/stops, vapour barriers/tapes/mastics, identification, erection, testing, flushing and documentation—complete. Insulation thickness to be provided (edit if your design differs): • 200 NB: 90 mm PUF/PIR • 150 NB: 80 mm • 100 NB: 65 mm • 80 NB: 50 mm | |||||
| 3.2 | 200 NB pre-insulated bonded CHW piping system, PUF 90 mm, HDPE jacket | 200 | RM | 100 | ₹20,000 |
| - | 150 NB pre-insulated bonded CHW piping system, PUF 80 mm, HDPE jacket | 40 | RM | 53 | ₹2,120 |
| - | 100 NB pre-insulated bonded CHW piping system, PUF 65 mm, HDPE jacket | 104 | RM | 10 | ₹1,040 |
| - | 80 NB pre-insulated bonded CHW piping system, PUF 50 mm, HDPE jacket | 24 | RM | - | - |
| 4Supplying, installation, balancing and commissioning of fabricated at site GSS sheet metal rectangular/ round ducting complete with neoprene rubber gaskets, elbows, splitter dampers, vanes, hangers, supports, bends, transitions, reducers, end caps, collars etc as required complete in all respect in confirmation with IS : 655 and approved drawings and specifications of following sheet thickness complete as required. | |||||
| - | 20 Gauge | 314 | Sqm | 100 | ₹31,400 |
| - | 20 Gauge | 100 | Sqm | 53 | ₹5,300 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.41 MB
Workdetails.pdf
Additional Documents • 0.09 MB
8848_tender_1.pdf
Tender Documents • 0.74 MB
integrity_pact.pdf
Additional Documents • 0.47 MB
8848E8_CreditSchdule_1.pdf
Additional Documents • 0.24 MB
Tender_Acceptance_Letter.pdf
Additional Documents • 0.08 MB
BOQ_892660.xls
BOQ • 0.38 MB
8848corri.pdf
PDF • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .