| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC | ₹2.9 L | L1 | Accepted-AOC Lowest Bidder |
| 2 | L2₹2.9 L+₹460.14 (0.16%)Rejected-AOC | ₹2.9 L+₹460.14 (0.16%) | L2 | Rejected-AOC Rejected AOC |
| 3 | L3₹2.9 L+₹1,898.06 (0.66%)Rejected-Finance | ₹2.9 L+₹1,898.06 (0.66%) | L3 | Rejected-Finance Not L1 |
Tender Value
₹2.9 L
EMD Value
₹5,752
Closing Date
20 Jul 2026, 2:00 pmClosed
Assistant Engineer, Midnapore Highway Sub-Division
MIDNAPORE, PASCHIM MEDINIPUR
Construction of RCC Box drain at Ch 17.950 km, 18.020 km of Midnapore Keshpur Road at 13 Mile village under Midnapore Highway Division in the district of Paschim Medinipur
2026_WBPWD_5016515_1
WBPWD/RD/AE/MHSD/NIT-4/2026-27
Open Tender
CIVIL WORKS
Percentage
30 days
MIDNAPORE
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,752
Yes
5 Aug 2026
8 Jul 2026
22 Jul 2026
9 Jul 2026
20 Jul 2026
13 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for Structures
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge | 1 | m3 | 114 | ₹113.89 |
| 2 | Sand filling in foundation trenches and at the back of abutments, wing-walls etc. with good local sand free from earth in layers not exceeding 15 cm. including inundating each layer by profuse water and poking and ramming layer by layer complete including supply of sand. Quality of sand is to be approved by the Engineer-in-charge | 1 | m3 | 649.29 | ₹648.64 |
| 3 | Plain / Reinforced Cement Concrete in Open foundation with or without reinforcements, in any part of foundation of bridges / culverts with graded stone chips of appropriate nominal sizes, including screening and cleaning of coarse aggregates, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, cost of curing with water, including cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge, cost for quality control, sampling, testing etc. including cost of formwork but excluding reinforcement complete as per drawing and technical specifications.
PCC Grade M20
Using concrete mixer | 1 | m3 | 6,133.27 | ₹6,127.14 |
| 4 | Plain / Reinforced Cement Concrete in Substructure with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality, cement and water reducing admixtures, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete as per drawing and technical specification including the cost of necessary form work and staging complete as per drawing and technical specifications.
PCC Grade M25
Using concrete mixer | - | m3 | 6,656.61 | - |
| 5 | Plain / Reinforced Cement Concrete in Substructure with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality, cement and water reducing admixtures, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete as per drawing and technical specification including the cost of necessary form work and staging complete as per drawing and technical specifications.
RCC Grade M25
Using concrete mixer | 1 | m3 | 6,655.61 | ₹6,648.95 |
| 6 | Supplying, fitting and placing HYSD bar reinforcement in Sub-structure including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications and direction of Engineer-in-charge | 0.4 | MT | 56,253.71 | ₹22,501.48 |
| 7 | GST @ 18% on Item no 1.00 to 6.00 | - | %. | 18 | - |
| 8 | Labour Welfare Cess @ 1% on Item no 1.00 to 7.00 | - | %. | 1 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.29 MB
Tendernotice_2.pdf
PDF • 0.51 MB
BOQ_5086047.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .