| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 CrAdmitted-Finance | ₹2.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.6 Cr+₹94.1 L (35.5%)Admitted-Finance DAULAT RAM MARKET RAILWAY ROAD DADRI GAUTAM BUDH NAGAR U P | DADRI | GAUTAM BUDH NAGAR | UTTAR PRADESH | ₹3.6 Cr+₹94.1 L (35.5%) | L2 | Admitted-Finance |
| 3 | L3₹4.0 Cr+₹1.4 Cr (51.1%)Admitted-Finance | ₹4.0 Cr+₹1.4 Cr (51.1%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S R.K.Gupta Contractor L2 | Noshe Ali Contractor L3 | MAA PURNAGIRI CONSTRUCTION L1 |
|---|---|---|---|---|---|---|
| 1.00 | Supply and stacking of 45-90 mm guage hard stone ballast for pot holes, from approved quarry including royalty, cartage, octroi, sales tax & all other taxes whatsoever applicable under rules and also including stacking to the required template after screening at road side, including dressing of side berms as required where metal is to be stacked as per direction of Engineer incharge in dipretions, leaks, pot holes & undulations | 306.38 | cum | 3,308.88 ₹10,13,774.65 | 3,200 ₹9,80,416 | 2,700 ₹8,27,226 Lowest |
| 2.00 | Supply and stacking of 45-63mm guage hard stone ballast for pot holes, from approved quarry including royalty, cartage, octroi, sales tax & all other taxes whatsoever applicable under rules and also including stacking to the required template after screening at road side, including dressing of side berms as required where metal is to be stacked as per direction of Engineer incharge in dipretions, leaks, pot holes & undulations | 453.9 | cum | 3,245.58 ₹14,73,168.76 | 3,500 ₹15,88,650 | 2,700 ₹12,25,530 Lowest |
| 3.00 | Supply and stacking of 22.4-53 mm guage hard stone ballast for Top coat, from approved quarry including royalty, cartage, octroi, sales tax & all other taxes whatsoever applicable under rules and also including stacking to the required template after screening at road side, including dressing of side berms as required where metal is to be stacked as per direction of Engineer incharge in dipretions, leaks, pothols & undulations | 865.47 | cum | 3,229.35 ₹27,94,905.54 | 3,800 ₹32,88,786 | 2,700 ₹23,36,769 Lowest |
| 4.00 | Same as Item No. 1 above but Crushed stone dust of approved quality and quarry. | 263.87 | cum | 3,169.82 ₹8,36,420.4 | 3,500 ₹9,23,545 | 3,000 ₹7,91,610 Lowest |
| 5.00 | Consolidation of 45-90mm gauge stobe ballast | 306.38 | cum | 235.2 ₹72,060.58 | 300 ₹91,914 | 150 ₹45,957 Lowest |
| 6.00 | Consolidation of 45-63mm gauge stobe ballast | 453.9 | cum | 224 ₹1,01,673.6 | 300 ₹1,36,170 | 150 ₹68,085 Lowest |
| 7.00 | Consolidation of 22.4-53mm gauge stobe ballast | 865.47 | cum | 224 ₹1,93,865.28 | 300 ₹2,59,641 | 150 ₹1,29,820.5 Lowest |
| 8.00 | Water allowance for consolidation of stone ballast to be allowed on item No. 1 between 15th Nov to 31st May (6+7) | 1,319.37 | cum | 23.52 ₹31,031.58 Lowest | 300 ₹3,95,811 | 35 ₹46,177.95 |
| 9.00 | Bitumin Painting over W.B.M. surface (Ist Coat Painting) including supply of 13.2mm guage stone grit and bitumin including maintenance of stone grit and bitumin including maintenance of road side patries & watering them during operation for proper completion of work as directed by the Engineer in charge & also including road roller charges and its fuel, the wages of fireman and T&P etc required for proper copletion of the work as per direction of Engineer in charge, including cost of tack coat (Bitumen shall be used @ 0.60kg/sqm) | 20,577.99 | sqm | 217.74 ₹44,80,651.54 | 580 ₹1,19,35,234.2 | 110 ₹22,63,578.9 Lowest |
| 10.00 | Providing and laying of 50mm thick compacted (Avg.) bituminous macadam with 100-120 TPH on hot mix plant prepared/existing surface with specified graded crushed stone aggregate for base/binding course over a tack coat including of aggregates with F.E. Loader and Hot mix plant, transporting the mixed material in tipper, to site upto paver finished to the required level & grade, rolling by power roller to achieve the desirt density, Bitumin will be used for BM @ 3.40% by woight including supply of all materials, labour, T&P etc required for proper completion of the work as per direction of the Engineer in charge. | 1,028.9 | CUM | 12,029 ₹1,23,76,638.1 | 10,400 ₹1,07,00,560 | 9,400 ₹96,71,660 Lowest |
Tender Value
₹3.7 Cr
EMD Value
₹7.4 L
Closing Date
29 Dec 2022, 5:00 pmClosed
PGM (E)
A-1/4 Upsida Complex, Lakhanpur, Kanpur
Upgradation of Road at I.A Babrala Distt. Sambhal
2022_SIDC_758159_1
cd_4_194_dt_28112022
Open Tender
Civil Works
Item Rate
120 days
Babrala
Please refer Tender documents.
4 documents required · 4 mandatory
₹7,318
UPSIDA
₹7.4 L
14 Feb 2023
15 Dec 2022
30 Dec 2022
15 Dec 2022
29 Dec 2022
15 Dec 2022
Amount
Supply and stacking of 45-90 mm guage hard stone ballast for pot holes, from approved quarry including royalty, cartage, octroi, sales tax & all other taxes whatsoever applicable under rules and also including stacking to the required template after screening at road side, including dressing of side berms as required where metal is to be stacked as per direction of Engineer incharge in dipretions, leaks, pot holes & undulations
Supply and stacking of 45-63mm guage hard stone ballast for pot holes, from approved quarry including royalty, cartage, octroi, sales tax & all other taxes whatsoever applicable under rules and also including stacking to the required template after screening at road side, including dressing of side berms as required where metal is to be stacked as per direction of Engineer incharge in dipretions, leaks, pot holes & undulations
Supply and stacking of 22.4-53 mm guage hard stone ballast for Top coat, from approved quarry including royalty, cartage, octroi, sales tax & all other taxes whatsoever applicable under rules and also including stacking to the required template after screening at road side, including dressing of side berms as required where metal is to be stacked as per direction of Engineer incharge in dipretions, leaks, pothols & undulations
Same as Item No. 1 above but Crushed stone dust of approved quality and quarry.
Consolidation of 45-90mm gauge stobe ballast
Consolidation of 45-63mm gauge stobe ballast
Consolidation of 22.4-53mm gauge stobe ballast
Water allowance for consolidation of stone ballast to be allowed on item No. 1 between 15th Nov to 31st May (6+7)
Bitumin Painting over W.B.M. surface (Ist Coat Painting) including supply of 13.2mm guage stone grit and bitumin including maintenance of stone grit and bitumin including maintenance of road side patries & watering them during operation for proper completion of work as directed by the Engineer in charge & also including road roller charges and its fuel, the wages of fireman and T&P etc required for proper copletion of the work as per direction of Engineer in charge, including cost of tack coat (Bitumen shall be used @ 0.60kg/sqm)
Providing and laying of 50mm thick compacted (Avg.) bituminous macadam with 100-120 TPH on hot mix plant prepared/existing surface with specified graded crushed stone aggregate for base/binding course over a tack coat including of aggregates with F.E. Loader and Hot mix plant, transporting the mixed material in tipper, to site upto paver finished to the required level & grade, rolling by power roller to achieve the desirt density, Bitumin will be used for BM @ 3.40% by woight including supply of all materials, labour, T&P etc required for proper completion of the work as per direction of the Engineer in charge.
Providing and laying semi-dense buituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler , transporting the hot mix to work site by tipper , laying with paver finisher equiped with electronic sensor to the required grade , level and alignment and rolling with smooth wheeled , vibratory and tandem rollers to achieve the desired compaction and density as per specification , complete and as per directions of engineer-in-charge.25mm completed thickness with bitumen og grade VG-30@ 5%( percentage by weight of total mix ) and lime filler @ 2% ( percentage by weight of aggegate ) prepared in batch type hot mix plant of 100-120 TPH capacity.
Brick edging on both sides of the road with Ist class bricks 8cm wide & 12cm deep laid with mud mortar including labour, & supply of bricks finished to required level & in proper alignment & also including dressing & ramming the excavated earth as directed by Engineer in charge including supply of all material labour & T&P etc required for proper completion of the work.
Earth filling in embankment in patri dressing including cost of earth & cartage beyond 5.0km including ramming and dressing the surface in required levels and slopes and also including royalty, supply of all labour T&P etc for proper completion of work.
Providing and laying of 2.5mm thick road marking strips (retroreflective) of specified shade/colour using hot thermoplastic material by fully/semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shose heater driven by experienced operator on road surface including cost of material labour T&P, cleaning the road surface of all dirt, seals, oil, grease and foreign material etc, complete as per direction of Engineer-in-charge and accordance with applicable specifications.
Cleaning Jungles including uprooting of trunk vegetation grass, bushes, wood trees and sapling of girth upto 30cm measured at a height of 1 meter above ground level and removal of rubbish upto a distance of 50 meters out side the periphery of area cleared .Same as Above Item 259 But Grass only
Preparation and consolidating OF SUB GRADE with road roller 0f 8 to 1012 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade disposal of surplus earthwith lead up to 50 metres. with road roller.
Extra for compaction of earth work in embankment under opti- mum moisture conditions to give at least 95% of the maximum dry density ( proctor density).
Providing & applying VG-10 Tack Coat with bitumen using emulsion pressure distributer at the rate of 0.30kg/sqm on the prepared surface/granular surface cleaned with mechanical brooms. (503) (iii) on WBM.
Providing & applying VG-10 Tack Coat with bitumen using emulsion pressure distributer at the rate of 0.35kg/sqm on the prepared surface/granular surface cleaned with mechanical brooms. (503) on Bituminous surface .
M/S R.K.Gupta Contractor
Noshe Ali Contractor
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
etenderdocument.pdf
Tender Documents • 1.18 MB
feeformatn.xls
Tender Documents • 0.02 MB
capabilitystatement.pdf
Tender Documents • 0.43 MB
BOQ_1246531.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .