Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical REGAL TAILOR CRPF ROAD REGAL CHOWRAH NEEMUCH NEEMUCH MADHYA PRADESH 458441 | NEEMUCH | MADHYA PRADESH | 458441 | Accepted-Technical bid accepted. |
| 2 | Accepted-Technical | Accepted-Technical bid Accepted. |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹27.9 L
EMD Value
₹2.8 L
Closing Date
11 Mar 2026, 1:00 pmClosed
EO
NPP Etawah
Construction Work of Boundary wall and Gate for Making a Park on vacant land near the Tanki from Pakka Talab intersection to on the road Purbiya tola.
2026_DOLBU_1120353_1
1786/J.N.V./E-Ni.su./2025-26 date 25.02.2026
Open Tender
Construction Works
Percentage
30 days
ETAWAH
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,658
EO
₹2.8 L
23 Mar 2026
26 Feb 2026
11 Mar 2026
26 Feb 2026
11 Mar 2026
26 Feb 2026
Earth Work in excavation in ordinary soil (loam,clay or sand) including lift up to 1.50m and lead up to 30m and including filling watering and remming of excavated earth in to the trenches or in to the space between the building and the side of foundation trenches or in to the plinth and removal and disposal of surplus earth as directed b the Engineer in charge up to a distance of 30m from the foundation trenches. (S.I. No. 251) For wall, Gate, Column, Less Column
Providing and laying cement concrete in 1:4:8(1cement:4coarse sand : 8 Stone) ballast 40mm gauge) uring complete including cost of formwork in foundation and floors. (S.I.No. 281) Gate Column less.
Class-150 brick in 1:3 cement and coarse sand of 1.25FM Mortar in foundation and plinth including supply of all materials, labour and tools and plants, ets. required for proper completion of the work. (S.I. No. 307) upto GL Gate(Upto GL) Less.
Class-150 brick in 1:3 cement and coarse sand in Super structure all materials. Labour and tools and plants, etc. required for proper completion of the work (S.I. No. 307+310) Above GL, Stairs, Less Column.
12mm thick cement plaster with cement mortor in proportion of 1:3 cement & Coarse sand of single cost on fair side of plastering upto floor two level including brick wall for plastering upto floor two level including internal rounded angles not exceeding 80mm in girth, chemfers and finished even and stooth. No. Extra for mixing any 1 cement: 3 coarse sand (S.I. No. 13.9) Less folumn
finishing wall with premium Acrylic smooth exterior paint with silicone additives...........all complete. (S.I.No. 13.47.1) Less Column
R.C.C. work with cement approved course sand and 2cm gauge approved grite in the proportion of 1:2:4 in beam excluding supply of reinforcement and its binding but including its fixing and binding the same with 24BWGGI binding wire and including the cost of binding wire moulds all other material labour & T&P etc. required for preparation of the work binding wire cost being including in the item. (S.I. No. 285) Plinth Beam, top Beam, Gate (Plinth Beam), Top Beam.
R.C.C. work with cement approved course sand and 2cm gauge approved grite in the proportion of 1:1.5:3 in Columen excluding supply of reinforcement and its binding but including its fixing and binding the same with 24BWGGI binding wire and including the cost of binding wire moulds all other material labour & T&P etc.required for perparation of the work binding wire cost being including in the item. (S.I.No. 289). For column, Upto GL, Above GL, Gate, Upto GL, Above GL, 2nd Gate, Upto GL, Above GL.
R.C.C work with Cement approved coarse sand and 2 cm gauge approved stone ballast in the proportion of 1:1.5:3 in Slab excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B, W, G,G,I)binding wire and including necessary crent ering shuttering etc. and also including supply all matterial labour and .....At Nala, Slab.
Mild Steel of iron in plain work such as reinforced concert of reinforcement wrought to required shape as necessary including benefited for proper completion for the work and including supply of all steel and wastage and over lapping and hook. (S.I.No. 504) Column, Beam, Slab.
M.S. or iron work in angle iron door and window frame including cutting welding & wastage including supply of all material, labour T&P etc. required for proper completion of work(S.I. No. 503) for Gate, For railing.
Painting or varnishing new work on grill or gate with one coat of ready mixed priming paint and two coat of approved superier quality rady mixed paint including supply of all material Labour T&P etc. Required for proper completion of work. Paint to be used should confirm the ISI No. 103, 1950(S.I. No. 641+642)
Add 18.00% G.S.T charge
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
BOQ_2083988.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .