Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAccepted-Finance 98 PANIYARE PURWA MAKRAND NAGAR SARAIMEERA KANNAUJ KANNAUJ UTTAR PRADESH 209726 | KANNAUJ | UTTAR PRADESH | 209726 | L1 | Accepted-Finance Accepted | |
| 2 | L2₹2.2 L+₹5,200 (2.45%)Accepted-Finance | L2 | Accepted-Finance Accepted | |
| 3 | L3₹2.4 L+₹27,800 (13.1%)Accepted-Finance 2ND FLOOR SHOP NO 303 MARUTI PLAZA RONCHI BANGAR TOWNSHIP MATHURA | MATHURA | UTTAR PRADESH | 281001 | L3 | Accepted-Finance Accepted |
Tender Value
₹2.8 L
EMD Value
₹4,000
Closing Date
8 Jul 2024, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SUPERINTENDING ENGINEER
SE, ETC-II, Kanpur
FOR DISMANTELLING OF 132/33KV 40MVA T/F AND ERECTION OF NEW 132/33KV 63 MVA T/F AT 132KV S/S TALGRAM UNDER ETD-FATEHGARH.
2024_UPTCL_929430_1
E-TENDER NO. 03/ETC-II(K)/2024-25
Open Tender
Electrical Works
Lump-sum
45 days
132KV SUBSTATION TALGRAM
Please refer Tender documents.
3 documents required · 3 mandatory
₹708
EE, ETD-II, Kanpur
₹4,000
23 Jul 2024
15 Jun 2024
8 Jul 2024
15 Jun 2024
8 Jul 2024
15 Jun 2024
Amount
Complete dismantling the accessories of 40 MVA, 132/33 KV Transformer after opening of Jumpers, removal of earthing and opening of cables & cable connection, draining out the transformer oil up to required level in 209 litres capacity oil drums/tanker, removal of all radiators, conservator tank, oil pipe lines all bushings, turrets, fan motors, mashalling box. RTCC panel, HV/LV LA & 33 KV CT (800/400/1) etc with proper gasket along with nuts and bolts to complete the jobs satisfactorily including proper stacking, Blanking plates, nuts and bolts. All T&P required for execution of work shall be arranged by the contractor at his own cost
Shifting of main tank of 40 MVA. 132/33 KV transformer approximate 20 mtrs away from the plinth+ including turning of tank, if required including all T&P and all other works required to complete the job satisfactory as per tech Specn
Additional shifting 1 Job for every 5 Mtr.
Shifting of main tank of New 63 MVA. 132/33 KV transformer from unloading point up to plinth, approximate 20 mtrs distance including turning of tank, if required including all T&P and all other works required to complete the job satisfactory as per tech Specn
Additional shifting 1 Job for every 5 Mtr.
Complete, erection of 63 MVA T/F by erection of radiator, conservator tank, bushing with its turrets (if available) connecting of oil pipe line. erection of cooling fans, making control cables connection of T/F, bucholz relay etc. for completing the work, topping of T/F oil and final oil filling in tank, radiator, conservator tank and all other associates work for completing of work. Work also includes erection of HV/LV LA and 33 KV CT (2000/1250/1A).
Termination of cable in RTCC & marshaling box transformer relay panel if required with the assurance of proper reflection of parameters in the meters, gauges provided on RTCC, OLTC, Marshaling box, transformer etc.
Earthing of main tank of 63 MVA T/F, T/F Neutral bushing HV and LV side, 120 KV LA & 33 KV CT by using M.S. flat 50x6/ 75x10 mm size, its jointing with already laid earth mat / Deltas, neutral bushing support for its earthing work
Placement of new RTCC panel of this new 63 MVA T/F in control room at 132 KV S/S Talgram including its Termination & fitting and laying of control cable if required as per site requirement and its connections
Jumpering of 63 MVA T/F from HV with single Moose/Zebra/Panther and LV side with Double Zebra/Moose/Panther complete up to 33 KV Main Bus
Centrifuging of complete T/F oil in T/F by connecting centrifuging pipes circulating th T/F oil through PVT. Centrifuging machine and taking the BDV value of the oil periodically till the required value is achieved. Approx. 25 KL
Making hole in part of GI Main/auxiliary structure / cutting of GI angle drilling of hole existing/ defective structure /plate/Angle and grinding machine with all cost of men, T & P etc.
After centrifuging and achieving the desired value of BDV & PPM (as per specification of T/F manufacturer), testing of T/F oil (Dissloved Gas Analysis, Tan Delta, Dielectric Strength & Water content test) is to be done at CPRI lab/before charging of T/F and after charging of T/F. Works includes sample collection, transportation and submission of reports
Getting the NOC from Electrical safety office by submission of required fee decide by Electrical safety office
M/S DHIRENDRA SINGH
P&H Engineering
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .