Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹10.8 LAccepted-AOC | ₹10.8 L | L-1 | Accepted-AOC Accepted |
| 2 | L-2₹11.0 L+₹17,016.30 (1.58%)Rejected-Finance | ₹11.0 L+₹17,016.30 (1.58%) | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹11.2 L+₹40,111.38 (3.71%)Rejected-Finance | ₹11.2 L+₹40,111.38 (3.71%) | L-3 | Rejected-Finance L-3 |
| 4 | L-4₹12.3 L+₹1.5 L (13.6%)Rejected-Finance | ₹12.3 L+₹1.5 L (13.6%) | L-4 | Rejected-Finance L-4 |
Tender Value
₹13.6 L
EMD Value
₹17,100
Closing Date
24 Mar 2023, 5:00 pmClosed
STAFF OFFICER CIVIL MCL LAKHANPUR AREA
GM Office MCL Lakhanpur area
Supply of drinking water to different villages (Gopipali Phase-I, Talibahal Phase-I and Phase-III and Limtalipada and Khaliamunda Phase-I) by water tanker at BIT for 90 days under CSR work of LKPA (Package S-IV).
2023_MCL_274190_1
MCL/GM/LKPA/SOC/22-23/111/1147 dt 07.03.23
Open Tender
Civil Works - Others
Item Rate
90 days
GM OFFICE MCL LAKHANPUR AREA
As per NIT
3 documents required · 3 mandatory
₹17,100
16 Apr 2023
10 Mar 2023
27 Mar 2023
10 Mar 2023
24 Mar 2023
10 Mar 2023
10 Mar 2023 - 13 Mar 2023
Amount
Item Description/ Heading
Supply of drinking water to different spots of the following villages through vehicle mounted/hauled tanker including loading/drawing water from departmental source from IWSS filter plant of Lakhanpur area stand post as decoded and distribution of water from the tanker to the village including the cost of diesel, mobil, hire charges of tanker, repair and maintenence, wages of driver and helper and cost of VTM including its operation, etc (everything required for the job is the responsibilty of the contractor) with following leads as per the direction of Engineer in charge- Gopipali Phase-I (Lead: 15 KM) (15000 Litre x 90 days).
Supply of drinking water to different spots of the following villages through vehicle mounted/hauled tanker including loading/drawing water from departmental source from IWSS filter plant of Lakhanpur area stand post as decoded and distribution of water from the tanker to the village including the cost of diesel, mobil, hire charges of tanker, repair and maintenence, wages of driver and helper and cost of VTM including its operation, etc (everything required for the job is the responsibilty of the contractor) with following leads as per the direction of Engineer in charge- Talibahal Phase-I and Phase-III (Lead: 08 KM) (55000 Litre x 90 days).
Supply of drinking water to different spots of the following villages through vehicle mounted/hauled tanker including loading/drawing water from departmental source from IWSS filter plant of Lakhanpur area stand post as decoded and distribution of water from the tanker to the village including the cost of diesel, mobil, hire charges of tanker, repair and maintenence, wages of driver and helper and cost of VTM including its operation, etc (everything required for the job is the responsibilty of the contractor) with following leads as per the direction of Engineer in charge- Limtalipada &Khaliamunda Phase-I (Lead: 08 KM) (25000 Litre x 90 days).
Total impact of GST for the purpose of CTC
Kshirod Kumar Dubey
Indu Kumari
RAJWANCE CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .