| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.7 LAccepted-AOC | L-1 | Accepted-AOC Successful Bidder | |
| 2 | L-2₹3.1 L+₹34,059.52 (12.4%)Rejected-Finance | L-2 | Rejected-Finance Unsuccessful Bidder | |
| 3 | L-3₹3.4 L+₹62,527.02 (22.8%)Rejected-Finance | L-3 | Rejected-Finance Unsuccessful Bidder | |
| 4 | L-4₹3.6 L+₹89,127.76 (32.6%)Rejected-Finance | L-4 | Rejected-Finance Unsuccessful Bidder | |
| 5 | L-5₹3.9 L+₹1.2 L (42.4%)Rejected-Finance | L-5 | Rejected-Finance Unsuccessful Bidder |
Tender Value
₹5.9 L
EMD Value
₹7,400
Closing Date
25 Apr 2024, 11:00 amClosed
Staff Officer (Civil) KA
Office of the Area General Manager, Dungariya, Kanhan Area
Repairing of fencing and earth pits of Bhawani Sub Station under Ambara Sub Area
2024_WCL_306599_1
ka3450-civ-s-e001 of 2024-25
Open Tender
Civil Works - Others
Item Rate
60 days
Ambara Sub Area
-----N.A.-----
3 documents required · 3 mandatory
₹7,400
14 Aug 2024
15 Apr 2024
26 Apr 2024
15 Apr 2024
25 Apr 2024
15 Apr 2024
15 Apr 2024 - 22 Apr 2024
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge In mud mortar
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources).
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand)
12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand)
White washing with lime to give an even shade : New work (three or more coats)
Total impact of GST for the purpose of CTC
RAVI SINGH VERMA CONTRACTOR
MD. OWAISH SIDDIQUE
akbar ali contractor
Nasiruddin
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_317710.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .