Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1ST₹5.0 LAccepted-Finance 48 SATCOWRIE MITRA LANE 700054 | KOLKATA | KOLKATA | WEST BENGAL | 700054 | 1ST | Accepted-Finance 1st Lowest | |
| 2 | 2ND₹5.1 L+₹10,798.87 (2.18%)Rejected-Finance | 2ND | Rejected-Finance 2nd Lowest | |
| 3 | 3RD₹5.2 L+₹21,449.12 (4.33%)Rejected-Finance | 3RD | Rejected-Finance 3rd Lowest |
Tender Value
₹5.0 L
EMD Value
₹10,000
Closing Date
14 Nov 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE(C)/BR-IV
213B, C.R. AVENUE, KOL - 6
DEVELOPMENT OF UTTARAN PASSAGES BY LAYING ANTI SKID KOTA STONE OR EQUIVALANT AT 151,BALARAM DEY STREET IN WARD 25, 45 HARTAKI BAGAN LANE BUSTEE IN WARD 27 AND 7 SHIBNARAYAN DAS LANE IN WARD 38 UNDER BOROUGH-IV
2026_KMC_1048389_1
KMC/EE(C)IV/025/61/26-27/UTTR
Open Tender
CIVIL WORKS
Percentage
40 days
BOROUGH-IV
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹10,000
17 Nov 2026
3 Nov 2026
17 Nov 2026
3 Nov 2026
14 Nov 2026
3 Nov 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS(P) SOLING, EDGING AND METALLING??(15)Labour for taking out old soling edging including removing debris. (a) Single flat soling | 233.66 | %SQ | 9.81 | ₹2,292.2 |
| 2 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 2. Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m In ground floor including roof. (a) upto 150 mm. thick | 17.52 | M3 | 939 | ₹16,451.28 |
| 3 | BUILDING WORKS(P) SOLING, EDGING AND METALLING??(2)Labour for laying soiling with departmental bricks including carriage of departmental bricks within a lead of 150 metres preparation of bed as necessary with brick joints properly filled in and packed with brick joints properly filled in and packed with local sand or powdered earth and including necessary cushion of similar materials below the soling (and in between layers when more than one layer is used)(The item included the cost of obtaining local sand or powdered earth)(a) Single brick flat soling (thickness 75 mm) | 151.84 | %SQ | 35.84 | ₹5,441.95 |
| 4 | BUILDING WORKS ( C ) BRICKWORKS, CONCRETE WORKS Etc. A. BRICK WORKS 1. Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( 3rd Corrigenda & addenda dated 04.06.2018) | 81.76 | SQM | 361 | ₹29,515.36 |
| 5 | ORDINARY CEMENT CONCRETE ( MIX 1:2:4 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES | 17.52 | M3 | 5,498 | ₹96,324.96 |
| 6 | Raising cover and frame of Special Inspection Pit with CBW (1:4), 250 mm thick up to 100mm high with 20mm thick sand and cement plaster (1:4) including finishing with neat cement after cutting the asphaltum pavement taking out and re-fixing the existing cover and frame with cement concrete (1:1.5:3) with stone chips all round the frame surface including removal of surplus spoils. | 6 | EA | 1,511.81 | ₹9,070.86 |
| 7 | BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS?(17)18 mm. to 22 mm. thick, kota stone slab set in 20 mm thick (avg) cement mortar (1:4) in floor, stair & lobby including pointing in cement slurry with admixture of pigment matching the stone shade, including grinding & polishing as per direction of Engineer - in - charge to match with the existing work. [Slurry for bedding @ 4.4 kg/Sq.m and pointing @2.0 kg/Sq.m](Add extra for each addl, floor over the rate for item 22, 25, 26, 17, 20, 31, 32 & 15 of subhead A. (I) upto 4 th floor- Rs. 12/-per Sq.m II) above 4th floor -Rs. 16/- per Sq.m | 233.6 | SQM | 1,016 | ₹2,37,337.6 |
| 8 | BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS?(22)Supplying, fitting and fixing Marble Slab/tile of 15 to 18 mm thickness in floor, lobby, stair, landing & treads etc. over 20 mm (av.) thck base of Cement mortar (1:2) laid with white cement slurry @ 4.4 kg/Sq.m before placing marble & jointed with white cement slurry @ 2.0 kg/Sq.m with necessary pigments including grinding and Granite polishing as per direction of Engineering -in -Charge in Ground Floor. {White cement and Pigment to be supplied by the Agency].(a) With Makrana plain pink / Adranga Pink / Garbh Gulabi / Udaypur pink / Udaypur Green / Black Bhaslana.(iv) Area of each slab/tile exceeding 1.00 sq.m (This item to be executed on specific permission of Superintending Engineer)(Add extra for each addl, floor over the rate for item 22, 25, 26, 17, 20, 31, 32 & 15 of subhead A. (I) upto 4 th floor- Rs. 12/-per Sq.m II) above 4th floor -Rs. 16/- per Sq.m | 2 | SQM | 2,145 | ₹4,290 |
| 9 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 8. Brick work with 1st class bricks in cement mortar (1:6) (b) In superstructure, ground floor | 2.3 | M3 | 5,529 | ₹12,716.7 |
| 10 | BUILDING WORKS. (T)MISCELLANEOUS WORKS: A. SPECIAL WORKS. II. COMPOUND DEVELOPMENT: 17) Painting block letters or digits in Black Japan or any approved paint as per direction. a) Size 2 cm. to 2.5 cm. NB.: The above rates will be enhanced by 100% if the letters are engraved and painted. | 300 | EA | 6 | ₹1,800 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
Tendernotice_2.pdf
PDF • 0.60 MB
BOQ_2567033.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .