| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.4 LAccepted-AOC VILLAGE LOHINA TEHSIL HODAL DISTRICT PALWAL 121106 | LOHINA | PALWAL | HARYANA | 121106 | ₹18.4 L | L1 | Accepted-AOC AOC |
| 2 | L2₹18.9 LRejected-Finance NEAR BADI CHAUPAL VILLAGE LOHINA TEHSIL HODAL DISTRICT PALWAL | HODAL | PALWAL | HARYANA | ₹18.9 L | L2 | Rejected-Finance Reject due to higher rate quoted |
| 3 | Not Admitted-Fee/PreQual/Technical NEAR RADHA KRISHNA MANDIR LOHINA HODAL PALWAL HARYANA 121106 | HODAL | PALWAL | HARYANA | 121106 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical PLOT NO 143 MAHAWAL PATTI DEEGHOT HODAL PALWAL 121105 | HODAL | PALWAL | HARYANA | 121105 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | JS Construction L1 | Jagannath Infra Projects L1 |
|---|---|---|---|---|---|
| 1.00 | EARTH WORK IN FILLING (Excluding GST) Include all Leads and Carriage | 407.9 | cum | 427 ₹1.7 L | 427 ₹1.7 L |
Tender Value
₹17.6 L
EMD Value
₹35,160
Closing Date
10 Mar 2026, 5:00 pmClosed
MANOJ KUMAR
Municipal Council Palwal
Const. of Holika Dahan chowk in village Firojpur ward no 01 MC Palwal
2026_HRY_506164_1
202680CC6C72 BB95 409C AA14 C044A3EE8696294ULB
Open Tender
Civil Works
150 days
Palwal
2 documents required · 2 mandatory
₹2,000
₹35,160
Yes
29 Apr 2026
3 Mar 2026
11 Mar 2026
3 Mar 2026
10 Mar 2026
3 Mar 2026
EARTH WORK IN FILLING (Excluding GST) Include all Leads and Carriage
Percentage BoQ
BoQ_Ver3.0
Bidder Name :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
[10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate]
[10.8]Providing and laying of conglomerate floor 40mm thick cement concrete topping 1:2:4 [Through Rate]
[11.59]Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete. [Through Rate]
[11.69.2]Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound ) content. 2. With water thinnable cement primer on wall surface having VOC content less than 50 grams/litre [Through Rate]
[11.8.2]12 mm cement plaster of mix : 2. 1:6 (1 cement: 6 coarse sand) [Through Rate]
[11.9.2]15 mm cement plaster on rough side of single or half brick wall of mix: 2. 1:6 (1 cement: 6 coarse sand) [Through Rate]
[11.94.1]Finishing walls with textured exterior paint of required shade : 1. New work (Two or more coats applied @ 3.28 litre/10 sqm) over and including priming coat of exterior primer applied @ 2.20kg/10 sqm [Through Rate]
[13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate]
[13.41]Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories and stainless steel dash fasteners , stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.). [Through Rate]
[15.1.1.1]Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per clause 304 of MORTandH specifications Ordinary soil 1.1. Manual Means Depth up to 3 m [Through Rate]
[21.110.3]Supplying, erection, testing and commissioning of submersible motor pumping set non clog for sewerage having head 30.00 m as per the indicated requirements of discharge in LPM and power capacity in BHP as per IS marked including all accessories (like SS Pipes, SS Chain (Shackle Chain) ,SS Foundation Bolt, complete base frame, Monorail, Chain Guide Line, Auto Compiling, Duct Foot Bend (D/F Bend) etc. complete in all respect 3. Discharge Capacity (LPM) - 100 Power Capacity (BHP) - 1 [Through Rate]
[6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.15.1]Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor four level, excluding cost of centering, shuttering, finishing and reinforcement : 1. 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.30.5]Centering and shuttering including strutting, propping etc. and removal of form for 5. Lintels, beams, plinth beams, girders, bressumers and cantilevers [Through Rate]
[6.30.6]Centering and shuttering including strutting, propping etc. and removal of form for 6. Columns, Pillars, Piers, Abutments, Posts and Struts [Through Rate]
[6.33.3]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 3. Cold twisted bars [Through Rate]
[6.8.2]Providing and laying damp-proof course with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III): 4 graded stone aggregate 12.5mm nominal size) 2. 40mm thick [Through Rate]
[7.20.2]Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement Mortar 1:6 (1 cement : 6 coarse sand) [Through Rate]
[7.22.2]Brick work with common burnt clay non-modular bricks of class designation 10.5 in superstructure above plinth level up to floor IV level in all shapes and sizes in : 2. Cement mortar 1:6 (1 cement : 6 coarse sand) [Through Rate]
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_584896.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid