| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.9 LAccepted-AOC | L1 | Accepted-AOC L1 tenderer | |
| 2 | L2₹24.7 L+₹2.8 L (13.0%)Rejected-AOC | L2 | Rejected-AOC L2 Tenderer | |
| 3 | L3₹27.0 L+₹5.1 L (23.2%)Rejected-AOC 2H 703 ANNAI THERESA NAGAR 2ND STREET TUTICORIN 628008 | TUTICORIN | TAMIL NADU | 628008 | L3 | Rejected-AOC L3 Tenderer | |
| 4 | L4₹27.3 L+₹5.4 L (24.7%)Rejected-AOC | L4 | Rejected-AOC L4 Tenderer | |
| 5 | L5₹42.4 L+₹20.5 L (93.6%)Rejected-AOC | L5 | Rejected-AOC L5 Tenderer |
Tender Value
Refer Docs
EMD Value
₹29,500
Closing Date
29 Jan 2025, 2:00 pmClosed
Superintending Engineer/Generation/Tirunelveli
Superintending Engineer / Tirunelveli Generation Circle/ Anna building, Sivanthipatti Road, Maharajanagar, Tirunelveli District - 627011
Routine Civil Maintenance of the Periyar Lower and Upper Camps by cleaning and sweeping the Power House, Camps, Inspection Bungalow, Periyar Forebay Dam, Roads, Culverts, Penstock steps and Official buildings, Cleaning of water storage tanks l
2025_EB_517208_1
SE/GC/TIN/C04/2024-25
Open Tender
Civil Works - Others
Piece-work
365 days
Periyar Lower and Upper camp
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹29,500
Yes
21 Jun 2025
7 Jan 2025
30 Jan 2025
8 Jan 2025
29 Jan 2025
9 Jan 2025
Amount
Sweeping and Cleaning inside & open spaces around the surrounding areas of Power house, offices, Dispensary and other buildings and clear away the waistes / debris from the location including cost of broom sticks, baskets, safety appliances, labour charges, lead, lift etc., complete can be done in alternative woking days.
Periyar Lower camp
Periyar Upper camp
Cleaning the toilet & utilities in Power House, Office and Dispensery building including cost of cleaning materials like brush, bleaching powder, phenoil,labour for cleaning, safety appliances, lead, lift, etc., complete it can be done in all woking days.
Periyar Lower camp
Periyar Upper camp
Cleaning of open house drains in camp etc., and clearing away the wastes / debris from the location including cost of cleaning materials, bleaching powder, labour charges, safety appliances, lead, lift, etc., complete and it can be done once in Fifteen days.
Periyar Lower camp
Cleaning the Inspection chamber / manhole and clear away the solid wastes / debris from the particular location including cost of cleaning materials, bleaching powder, phenoil, labour charges, lead, lift, etc., complete and it can be done once in four months.Periyar Lower Camp
Periyar Lower camp
Periyar Upper camp
Cleaning of sewer line including removing the block wherever required and clear away the debris from the location including cost of cleaning materials, bleaching powder, phenoil, labour, lead, lift, etc, complete and it can be done once in three months per year. Periyar Lower Camp
Periyar Lower camp
Periyar Upper camp
Attending Masonry works such as chipping, plastering, brick works and concreting works /carpentry works / plumbing works wherever essentially required and clear away the debris from the location including cost of labour, lead, lift, etc, complete but material wlll be supplied by the department. Periyar Lower Camp
Periyar Lower camp - attending Masonry works
Maintenance of Water supply arrangements to Camp, Offices, Police guard of Tamil Nadu & Kerala Police including cost of required materials, labour charges, Safety appliances, T&P etc., Complete and it can be done daily.
Periyar Upper camp
Thorough cleaning of cobweb and dirts on walls inside, outside and ceiling of Power House and other office building for Inside 60% of the total area and for Outside 25% of the total area and clear away the debris from the location including cost of broom sticks, baskets, labour charges, safety appliances, lead, lift etc., complete and it can be done once in four months per year.
Periyar Lower camp
Cleaning the Storage tank and Raw Water including cost of one coat of white washing in lime, bleaching powder, labour charges , safety appliances, lead, lift, etc, complete and it can be done once in two months per year.
Periyar Lower camp
Cleaning of Filter bed, Open channel drain, Water tank including cost of bleaching powder, labour charges , safety appliances, lead, lift etc, complete and it can be done once in one month.
Periyar Upper camp
Cleaning the open drain in road sides and clearing the vegetative items in both sides of the drains as required and clearing away the deposited / dragged silt / debris from the location including cost of cleaning materials, labour, lead, lift, etc, complete and it can be done once in four months per year.
Periyar Lower camp
Periyar Upper camp
Clearing the Open Terraces of all Building and disposing away the debris from the location as directed including cost of broom sticks, baskets, labour, all lead, lift etc., complete and it can be done once in two months per year.
Periyar Lower camp
Periyar Upper camp
Maintaining the Inspection Bungalow by providing Watch and Warden during day and Night on shift basics including house Keeping & Gardening with cost of all labour charges, lead, lift etc., complete and it can be done in daily.
Periyar Lower camp
Maintenance of Dam by sweeping the top, cleaning the silt from the drain and floor of Inspection Gallery and clearing away the debris from the location as directed including cost of all labour charges , safety appliances, lead, lift, etc., complete once in three months per year.
Periyar Upper camp
Cleaning the Culverts across the roads by removing the dragged deposited silt/ debris inside & disposing away from the location as directed including cost of hire charges for T&P, labour charges , all lead, lift, etc, complete once in three months (before and after monsoon Period) . Periyar Lower Camp
Periyar Lower camp
Periyar Upper camp
Cleaning of steps along penstock, surge tank and Dam Gallery by scrapping algae, removal of dragged silt / debris earth and clearing away weeds/vegetative growth for width of 50 cm wide on each side of steps including cost of labour charges ,Safety appliances, lead, lift etc., complete and it can be done once in Six months .
Periyar Upper camp
GST 18% as per Govt. Norms
V NARAYANAN (BID ID -1235826)
RELIABLE ENGINEERS (BID ID -1235927)
MOHIDEEN ENTERPRISES (BID ID -1236121)
Reginald Michael Dhas (BID ID -1233726)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .