| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.2 LAccepted-AOC GATHA BHADERWAH DISTRICT DODA P O UDRANA J K PIN 182221 | DODA | JAMMU AND KASHMIR | 182221 | L1 | Accepted-AOC being Lowest | |
| 2 | L2₹23.8 L+₹3.6 L (17.6%)Rejected-Finance | L2 | Rejected-Finance Higher than L1 | |
| 3 | L3₹24.5 L+₹4.3 L (21.4%)Rejected-Finance | L3 | Rejected-Finance Higher than L1 | |
| 4 | L4₹25.5 L+₹5.3 L (26.1%)Rejected-Finance | L4 | Rejected-Finance Higher than L1 | |
| 5 | L5₹36.7 L+₹16.4 L (81.4%)Rejected-Finance | L5 | Rejected-Finance Higher than L1 |
Tender Value
Refer Docs
EMD Value
₹56,000
Closing Date
12 Mar 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer,TLMD-I,JKPTCL,Jammu
Office of the Executive Engineer TLMD I Jammu
Laying of PCC in 132/33KV Yard of Grid station Jhajjar Kotli
2021_PDD_119078_1
TLMD-I/J/19 dated 03-03-2021
Open Tender
Civil Works
Turn-key
60 days
Jhajjar kotli
Refer Tender Document
3 documents required · 3 mandatory
₹2,000
Executive Engineer TLMD I Janipur Jammu
₹56,000
Yes
21 May 2021
3 Mar 2021
13 Mar 2021
4 Mar 2021
12 Mar 2021
4 Mar 2021
4 Mar 2021 - 8 Mar 2021
90 days
Amount
Total Area = 5143.50 sq.mtr.
Clearing jungle including uprooting of unwanted vegetataion in the 132 KV and 33 KV Yard.
Removal of kankara already laid in the yard= 1566sqmtr. X0.04 m= 62.64cu. Mtr.
Carriage of kankara from yard to stacking site, avg. Distance 100 mtrs.= 62.4 cu. Mtr.
Earthwork in excavation by manual means over area mentioned above including disposal of excavated work for maintaining surface levelled required for concreting of yard (Average depth 0.30 mtr.) 5143.50x 0.30= 1543.050cu. Mtr. 40% Hard Soil= 617.22 cu. Mtr.
60% Soft Soil = 925.83 cu. Mtr.
Disposal of Excavated Soil upto loading point away from yard =1543.05 cu. Mtr.
Mechanical transport for disposal of excavated soil = 1543.05 cu. Mtr.
Fine dressing and ramming of excavated yard = 5143.50 sqmtr.
Cost of total kankara to be laid in the yard alongwith crusher dust as lean pad =5143.50x 0.04=205.74cu. Mtr. +10% wastage=226.31 cu. Mtr.-kankara already available (i.e.=62.64)=163.67 cu. Mtr.
M.T of knakara to be laid as lean pad =163.67 cu. Mtr.
Manual carriage of kankara to be laid as lean pad= 226.31 cu. Mtr.
Spreading of kankara to be used as lean pad = 226.31 cu. Mtr.
Crusher dust to be used alongwith kankara for lean pad purpose:- Supply and carriage of crusher dust (average depth 0.025 mtr.) = 5143.50 x 0.025 = 128.59 cu. mtr.
M.T of Crusher dust = 128.59 cu. Mtr.
Manual carriage of crusher dust for laying in yard =128.59 cu. Mtr.
Spreading and ramming of crusher dust alonwith sprinkling the water =128.59 cu. Mtr.
Providing and laying of cement concrete 1:5:10 = 5143.50 x 0.0762 m = 391.93 cu. Mtr.
Carriage of sand by M.T 176.37 cu. Mtr.
Carriage of Bajri by M.T. 352.74 cu. Mtr.
Manual Carriage of sand and bajri at work site in yard (176.37+352.74)= 529.11 cu. Mtr.
Providing and fixing of PVC Rain water drainage pipes 4"/6" alongwith stainless steel perforated covers including fixing the same = 200 holesx 1.0 mtr. Deep= 200 Rm +10%wastage= 220 Rm
Earthwork in excavation for digging the pits for fixing the rain water pipes in the holes= 200x1.0 m deepx0.75x0.75 = 112.5 cu. Mtr. 40%Hard soil = 45 cu. Mtr.
60% soft soil = 67.5 cu. Mtr.
Backfilling of the excavated soil after fixing of rain water pipes along with stainless steel perforated covers.= 112.50 cu. Mtr.
Supply of stone aggregate 20 mm for laying and spreading stone aggregate 20mm on top layer average depth 0.15 mtr.= 5143.50 x0.15= 771.56 cu. Mtr. +10% wastage=848.68 cu. Mtr.
Mechanical carriage of 20 mm stone aggregate= 848.68 cu. Mtr.
Manual carriage of stone aggregate 20 mm = 848.68 cu. Mtr.
Spreading of stone aggregate 20 mm in uniform manner= 848.68 cu. Mtr.
LAKSHMAN SINGH
M/S KRISHANA ENTERPRISES
Mukesh Chand/Randev Enterprices
M/s Meelu Enterprises
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .