Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC | L1 | Accepted-AOC As per requirement | |
| 2 | Rejected-Technical | - | Rejected-Technical Bid rejected since the work order criteria is not satisfying. |
Tender Value
Refer Docs
Closing Date
23 Jun 2021, 3:00 pmClosed
VIVEK SARATKAR
PURCHASE OFFICER, CDAC, PANCHWATI PASHAN PUNE
Supply, Installation and Commissioning of HVAC Work at first floor e-Sign room at C-DAC, Pune.
2021_DIT_633524_1
CDACP/Re-Ten-HVAC/24-2149-50
Open Tender
Electrical Works
Works
30 days
PUNE
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
CDAC
Exempted
ONLINE DETAILS GIVEN IN TENDER
7 Jun 2023
11 Jun 2021
23 Jun 2021
11 Jun 2021
23 Jun 2021
11 Jun 2021
11 Jun 2021 - 15 Jun 2021
16 Jun 2021
Amount
Supply, Installation and Commissioing of HVAC Work at first floor e-Sign room at C-DAC, Pune
HIGH SIDE
Supply of Cassette AC of 1.5 TR (2star non inverter model) with One year Comprehensive warranty.
LOW SIDE
1.5TR Cassette AC- Indoor and outdoor unit Installation, testing, commissioning charges
REFREGERENT PIPING,POWER/CONTROL CABLING:-Supply, Installation, Testing & Commissioning of copper piping complete with copper fittings & charge of refregerant gas for the above units(including drilling through wall), Piping associated with Cassette AC units shall be insulated with 13 mm thick closed cell elastomeric insulation .Quoted price shall be inclusive of UV protection paint for all exposed pipes.Price shall be comprise of copper power cabling from indoor to outdoor unit as required.
CONDENSATE DRAIN PIPING-Supply, Installation Testing and Commissioning of 25 mm dia. Chlorinated Polyvinyl Chloride (CPVC) pipes, including all CPVC plain fittings, including fixing the pipes with pipes clamps at 1.00 m spacings. This includes joints of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge. Supporting arrangement in accordance with the approved shop drawings and spacification. Pipes shall be insulated with 9mm thick closed cell elastometic insulation in tubing form.
MS FRAME FOR ODU-Supply and errection of MS base frame duly applied with red-oxide primer & followed by black enamel paint for mounting of outdoor units with fitting.
Closing of Supply& Return Air duct branch coming inside E-sign room
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .