| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹50.7 LAccepted-AOC OPP AIR FORCE STATION VPO SORANA DISTT SAHARANPUR UP PIN 247 232 | SAHARANPUR | UTTAR PRADESH | 247232 | ₹50.7 L | L1 | Accepted-AOC Being lowest bidder |
| 2 | L2₹64.5 L+₹13.8 L (27.1%)Rejected-Finance 0 0 BASANT AVENUE PHASE II PUNJAB GURDASPUR PUNJAB 143505 | GURDASPUR | PUNJAB | 143505 | ₹64.5 L+₹13.8 L (27.1%) | L2 | Rejected-Finance Not Lowest bidder |
| 3 | L3₹68.4 L+₹17.7 L (34.9%)Rejected-Finance 93 BAPUJI NAGAR ITC ROAD SAHARANPUR 247001 UP | SAHARANPUR | UTTAR PRADESH | 247001 | ₹68.4 L+₹17.7 L (34.9%) | L3 | Rejected-Finance Not Lowest bidder |
| 4 | L4₹67.0 L+₹16.3 L (32.1%)Rejected-Finance L 87 STREET NO 7C MAHIPALPUR EXTENSION NEW DELHI 110037 | NEW DELHI | NEW DELHI | DELHI | 110037 | ₹67.0 L+₹16.3 L (32.1%) | L4 | Rejected-Finance Not Lowest bidder |
| 5 | Rejected-Technical CANADA BUILDING 224 DR D N ROAD FORT MUMBAI 400001 | MUMBAI | MUMBAI | MAHARASHTRA | 400001 | - | - | Rejected-Technical Firm did not submitted requisite documents even after short fall corrigendum issued by this HQ. |
| Sl No | Description | Qty | Unit | VIJAY ENTERPRISES L2 | NSC Projects Pvt. Ltd. L4 | SUBHASH CHAND CONTRACTOR L1 | G.H. INFRASTRUCTURE PRIVATE LIMITED L3 |
|---|---|---|---|---|---|---|---|
| 1.00Installation of existing Runway light fitting with base of following type, at location that is at new raised surface of runway also includes transport to the runway at site from store,DGPS survey marking (X,Y,Z coordinates) in presence of rep of user and submission of completion drawing for approval of user, including compaction and ramming the surface and making good the existing surface with adequate materials to match the existing surface coring by core cutting eqpt on rigid/flexible pavement upto cutting circular hole of dia 350 mm and depth of 150 mm or as required for fixing of existing fitting in PQC rigid/flexible pavement of runway as per requirement for fixing of light fitting and precise alignment at all as specified and directed by user for the following :- Notes :- (a) Please note that the Runway Light Fittings are in the custody of Air Force Authorities and the same shall be collected by the contractor from the Air Force Authorities for fixing and the cost thereof shall be included in the unit rate quoted. (b) In case of any damage during re-installation of AFLS the contractor will be required to repair/ replace the same without any additional cost to the govt. (c) Before re installation of the AFLS the same shall be collected from AF authority. (d) For Re installation of AFLS, DGPS survey will be conducted by the contractor at DLC Level for precise conduit laying and also after PQC laying at the finished top surface for Core cutting & cost of the same is deemed to be included in quoted rate. (e) Rates for Inner/Outer core cutting for inset lights shall be deemed to be included in the quoted rate of the item. (f) Rate for making hole on bottom surface of shallow base for insertion of HDPE pipe shall be deemed to be included in quoted rate. | |||||||
| 1.01 | Cat-II Approach light (Inset) | 60 | Each | 11,500 ₹6,90,000 | 11,770 ₹7,06,200 | 9,500 ₹5,70,000 | 4,500 ₹2,70,000 Lowest |
| 1.02 | Simple Approach light (Inset) | 4 | Each | 11,500 ₹46,000 | 11,770 ₹47,080 | 9,500 ₹38,000 | 4,500 ₹18,000 Lowest |
| 1.03 | Supplimentry Approach light (Inset) | 54 | Each | 11,500 ₹6,21,000 | 11,770 ₹6,35,580 | 9,500 ₹5,13,000 | 4,500 ₹2,43,000 Lowest |
| 1.04 | Runway edge light (Elevated) | 27 | Each | 650 ₹17,550 Lowest | 1,486 ₹40,122 | 2,000 ₹54,000 | 4,500 ₹1,21,500 |
| 1.05 | Runway edge light (Inset) | 4 | Each | 11,500 ₹46,000 | 11,770 ₹47,080 | 9,500 ₹38,000 | 4,500 ₹18,000 Lowest |
| 1.06 | Stop way end light (Elevated) | 32 | Each | 700 ₹22,400 | 1,486 ₹47,552 | 450 ₹14,400 Lowest | 4,500 ₹1,44,000 |
| 1.07 | Runway Threshold Light (inset) | 22 | Each | 11,500 ₹2,53,000 | 11,770 ₹2,58,940 | 9,000 ₹1,98,000 | 4,500 ₹99,000 Lowest |
| 2.00 | Installation of Isolation Transformer of capacity 300W 6.6A/6.6A with primary and secondary connector kits at existing position including connection of earth wire complete including transportation of transformer from store to the runway site all as directed.
Note : Please note that the Isolation Transformers are in the custody of Air Force Authorities and the same shall be collected by the contractor from the Air Force Authorities for laying and the cost thereof shall be included in the unit rate quoted. | 207 | Each | 800 ₹1,65,600 | 371 ₹76,797 Lowest | 450 ₹93,150 | 14,000 ₹28,98,000 |
| 3.00 | Laying only of AFLS Primary XLPE cable of 1 core X 6/8 Sqmm, single conductor XLPE Insulated non shielded, 5 KV rated voltage, complete including testing after laying all as specified and directed.
Note : Please note that the XLPE cable is in the custody of Air Force Authorities and the same shall be collected by the contractor from the Air Force Authorities for laying and the cost thereof shall be included in the unit rate quoted. | 6,500 | RM | 47 ₹3,05,500 | 38 ₹2,47,000 Lowest | 40 ₹2,60,000 | 90 ₹5,85,000 |
Tender Value
₹70.5 L
EMD Value
₹1.3 L
Closing Date
24 Jun 2026, 6:00 pmClosed
CWE (AF) Ambala
HQ CWE (AF) Ambala Cantt-133001
CWE/AF AMB/SAR-T08/2026-27 INSTALLATION OF RUNWAY LIGHT FITTINGS AND OTHER CONNECTED ITEMS AT OVER RUN AREA OF UNDERSHOOT 27 END AND UNDERSHOOT 09 END AT AF STN SARSAWA UNDER GE AF SARSAWA
2026_MES_768282_1
CWE/AF AMB/SAR-T08/2026-27
Open Tender
Civil Works
Item Rate
120 days
Sarsawa
For MES enlisted contractor Class C Category b i and for un-enlisted contractor
refer NIT
8 documents required · 8 mandatory
₹1,000
GE (AF) Sarsawa
₹1.3 L
Yes
17 Sept 2026
27 May 2026
26 Jun 2026
27 May 2026
24 Jun 2026
18 Jun 2026
27 May 2026 - 16 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Installation of existing Runway light fitting with base of following type, at location that is at new raised surface of runway also includes transport to the runway at site from store,DGPS survey marking (X,Y,Z coordinates) in presence of rep of user and submission of completion drawing for approval of user, including compaction and ramming the surface and making good the existing surface with adequate materials to match the existing surface coring by core cutting eqpt on rigid/flexible pavement upto cutting circular hole of dia 350 mm and depth of 150 mm or as required for fixing of existing fitting in PQC rigid/flexible pavement of runway as per requirement for fixing of light fitting and precise alignment at all as specified and directed by user for the following :- Notes :- (a) Please note that the Runway Light Fittings are in the custody of Air Force Authorities and the same shall be collected by the contractor from the Air Force Authorities for fixing and the cost thereof shall be included in the unit rate quoted. (b) In case of any damage during re-installation of AFLS the contractor will be required to repair/ replace the same without any additional cost to the govt. (c) Before re installation of the AFLS the same shall be collected from AF authority. (d) For Re installation of AFLS, DGPS survey will be conducted by the contractor at DLC Level for precise conduit laying and also after PQC laying at the finished top surface for Core cutting & cost of the same is deemed to be included in quoted rate. (e) Rates for Inner/Outer core cutting for inset lights shall be deemed to be included in the quoted rate of the item. (f) Rate for making hole on bottom surface of shallow base for insertion of HDPE pipe shall be deemed to be included in quoted rate. | |||||
| 1.01 | Cat-II Approach light (Inset) | 60 | Each | - | - |
| 1.02 | Simple Approach light (Inset) | 4 | Each | - | - |
| 1.03 | Supplimentry Approach light (Inset) | 54 | Each | - | - |
| 1.04 | Runway edge light (Elevated) | 27 | Each | - | - |
| 1.05 | Runway edge light (Inset) | 4 | Each | - | - |
| 1.06 | Stop way end light (Elevated) | 32 | Each | - | - |
| 1.07 | Runway Threshold Light (inset) | 22 | Each | - | - |
| 2 | Installation of Isolation Transformer of capacity 300W 6.6A/6.6A with primary and secondary connector kits at existing position including connection of earth wire complete including transportation of transformer from store to the runway site all as directed.
Note : Please note that the Isolation Transformers are in the custody of Air Force Authorities and the same shall be collected by the contractor from the Air Force Authorities for laying and the cost thereof shall be included in the unit rate quoted. | 207 | Each | - | - |
| 3 | Laying only of AFLS Primary XLPE cable of 1 core X 6/8 Sqmm, single conductor XLPE Insulated non shielded, 5 KV rated voltage, complete including testing after laying all as specified and directed.
Note : Please note that the XLPE cable is in the custody of Air Force Authorities and the same shall be collected by the contractor from the Air Force Authorities for laying and the cost thereof shall be included in the unit rate quoted. | 6,500 | RM | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
Tender08T.pdf
Tender Documents • 0.90 MB
BOQ_860374.xls
BOQ • 0.53 MB
Dateextension1t08.pdf
PDF • 0.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .