Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.6 LAccepted-AOC | ₹16.6 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹17.1 LRejected-Finance | ₹17.1 L | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | V-Five Construction L2 | Sri Rajeswari Construction L1 |
|---|---|---|---|---|---|
| 1.00Earth work excavation and depositing on bank within an initial lead of 10 m and the following lifts in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil | |||||
| 2.00 | First depth of 0 to 2 m | 11.08 | cum | 150 ₹1,662 | 120 ₹1,329.6 Lowest |
| 3.00 | For stair case foundation | 0.1 | cum | 230 ₹23 | 220 ₹22 Lowest |
| 4.00Soft disintegrated rock, laterite, soft rock or kunkar not requiring blasting | |||||
| 5.00 | 2nd depth of 2 to 3 m | 5.54 | cum | 400 ₹2,216 | 380 ₹2,105.2 Lowest |
| 6.00Medium rock and dence medium rock not requiring blasting | |||||
| 7.00 | 2nd depth of 3 to 4 m | 5.54 | cum | 620 ₹3,434.8 | 610 ₹3,379.4 Lowest |
| 8.00 | 3rd depth of 4 to 5 m | 5.54 | cum | 920 ₹5,096.8 | 914 ₹5,063.56 Lowest |
| 9.00 | 4th depth of 5 to 6 m | 5.54 | cum | 920 ₹5,096.8 | 914 ₹5,063.56 Lowest |
| 10.00 | 5th depth of 6 to 7 m | 3.88 | cum | 1,300 ₹5,044 | 1,220 ₹4,733.6 Lowest |
Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
6 Feb 2026, 3:00 pmClosed
The Commissioner Tambaram City Municipal Corporati
Zone -4 Perungalathur
Construction of 1.00LL Sump and Motor Pump set with Panel board and Operator room at Alwin Garden OHT Near In Ward No 55 in Zone 4
2026_DMA_649485_1
340/2025/E1/Z4(06.02.2026)
Open Tender
Civil Works
Works
90 days
Tambaram
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹20,000
7 Aug 2026
31 Jan 2026
6 Feb 2026
31 Jan 2026
6 Feb 2026
31 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation and depositing on bank within an initial lead of 10 m and the following lifts in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil | - | - | - | - |
| 2 | First depth of 0 to 2 m | 11.08 | cum | - | - |
| 3 | For stair case foundation | 0.1 | cum | - | - |
| 4 | Soft disintegrated rock, laterite, soft rock or kunkar not requiring blasting | - | - | - | - |
| 5 | 2nd depth of 2 to 3 m | 5.54 | cum | - | - |
| 6 | Medium rock and dence medium rock not requiring blasting | - | - | - | - |
| 7 | 2nd depth of 3 to 4 m | 5.54 | cum | - | - |
| 8 | 3rd depth of 4 to 5 m | 5.54 | cum | - | - |
| 9 | 4th depth of 5 to 6 m | 5.54 | cum | - | - |
| 10 | 5th depth of 6 to 7 m | 3.88 | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.34 MB
BOQ_778912.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].