| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹26.1 LAccepted-AOC | ₹26.1 L | 1 | Accepted-AOC L1 - AOC Awarded |
| 2 | Rejected-Technical NO 4ARUN AVENUE SIVANATHA NAGAR K PUDHUR MADURAI 625 007 | MADURAI | TAMIL NADU | 625007 | - | - | Rejected-Technical Not Qualified |
| Sl No | Description | Qty | Unit | Subramaniyan L1 |
|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 417 | 1M3 | 164 ₹68,388 |
| 2.00 | Plain Cement Concrete 1:4:8 (one cement four Parts of crushed stone M-sand and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification (The crushed stone sand to be used on cocrete work shell conform to gradation as per IS :383-1970 ) | 59 | 1M3 | 5,390 ₹3.2 L |
| 3.00 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38 (Drain Wall) | 1,332 | 1M2 | 487 ₹6.5 L |
| 4.00 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38 (Culvert deck slab) | 12 | 1M2 | 1,082 ₹12,984 |
| 5.00 | Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.-Mixing by mechanical means | 170 | 1M3 | 6,465 ₹11.0 L |
| 6.00 | Finishing the top of floor with Granolithic Finish with CC 1: 2: 4 (one cement, two Parts of crushed stone M-sand and four HBG jelly ) using chips of grade 10 mm and below for 25mm thickness and rubbed smooth etc, complete as per standard specification | 249 | 1M2 | 165 ₹41,085 |
| 7.00 | Providing and laying in position, standardised concrete Mix M-20 Grade by insitu machine mix concrete adopting weighing batch method in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without inspiring strength and durability with about (5 Cu.m) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 Cu.m) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost ofreinforcement grill and fabricating charges, centering and shuttering and also including laying,vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc.,complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials). | 3.5 | 1M3 | 7,992 ₹27,972 |
| 8.00 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 280 | 1Kg | 92 ₹25,760 |
| 9.00 | Removal of Excavated Excess Earth away from the site to 2K.M including loading and transportation charges etc, complete as per standard specification. | 313 | 1M3 | 67 ₹20,971 |
| 10.00 | GST 18% | 1 | 1No | 3,45,188.75 ₹3.5 L |
Tender Value
₹27 L
EMD Value
₹27,000
Closing Date
23 Feb 2026, 3:00 pmClosed
COMMISSIONER
NO 01, TRICHY ROAD , PALLADAM
NNT-Construction of Storm water drain and Culvert at Tiruppur Main Road in Ward No 06 in Palladam Municipality
2026_MAWS_654554_1
2241/2025/E1
Open Tender
Civil Works
60 days
PALLADAM MUNICIPALITY LIMIT
refer tender notice
3 documents required · 3 mandatory
₹0
₹27,000
15 May 2026
11 Feb 2026
23 Feb 2026
11 Feb 2026
23 Feb 2026
11 Feb 2026
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: The Commissioner, Palladam Municipality
Name of Work: Construction of Strom water drain and Culvert at Tiruppur Main Road in Ward No : 06 in Palladam Municipality.
Contract No: 2241/2025/E1 Estimate Cost: Rs.27,00,000.
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Code / Make Quantity Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
1 Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. 1M3 Excess(+) Full Conversion INR
2 Plain Cement Concrete 1:4:8 (one cement four Parts of crushed stone M-sand and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification (The crushed stone sand to be used on cocrete work shell conform to gradation as per IS :383-1970 ) 1M3 Excess(+) Full Conversion INR
3 Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38 (Drain Wall) 1M2 Excess(+) Full Conversion INR
4 Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38 (Culvert deck slab) 1M2 Excess(+) Full Conversion INR
5 Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.-Mixing by mechanical means 1M3 Excess(+) Full Conversion INR
6 Finishing the top of floor with Granolithic Finish with CC 1: 2: 4 (one cement, two Parts of crushed stone M-sand and four HBG jelly ) using chips of grade 10 mm and below for 25mm thickness and rubbed smooth etc, complete as per standard specification 1M2 Excess(+) Full Conversion INR
7 Providing and laying in position, standardised concrete Mix M-20 Grade by insitu machine mix concrete adopting weighing batch method in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without inspiring strength and durability with about (5 Cu.m) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 Cu.m) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost ofreinforcement grill and fabricating charges, centering and shuttering and also including laying,vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc.,complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials). 1M3 Excess(+) Full Conversion INR
8 Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. 1Kg Excess(+) Full Conversion INR
9 Removal of Excavated Excess Earth away from the site to 2K.M including loading and transportation charges etc, complete as per standard specification. 1M3 Excess(+) Full Conversion INR
10 GST 18% 1No Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
NNT.pdf
Tender Documents • 1.15 MB
BOQ_784897.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid