| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 CrAccepted-AOC | ₹5.7 Cr Quoted ₹5.9 Cr | L1 | Accepted-AOC FINANCIAL BID ACCEPTED AT THE PRICE OF RS.56904201.00 |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical 67 AASANI BAS PALANA PALANA BIKANER BIKANER RAJASTHAN 334402 UDYAM RJ 08 0063520 | BIKANER | RAJASTHAN | 334402 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹5.9 Cr
EMD Value
₹11.8 L
Closing Date
17 Jun 2020, 12:00 pmClosed
Superintending Engineer
0/0 Superintending Engineer Ayodhya/Ambedkarnagar Circle, P.W.D. Ayodhya
Improvement of Riding Quality work on Barabanki Jahangirabad Atwa Saddipur Sihali Fatehpur Belahra Mahmoodabad ODR in Km 37.00 to 47.483 by Hotmix Plant Under I.R.Q.P.
2020_CEUFZ_481682_1
2404/1KAM(BARA)E-Tendring/2020 dt 29-5-20
Open Tender
Civil Works
Fixed-rate
120 days
Barabanki
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,354
Payment by net Banking through nic portal
₹11.8 L
Yes
Ayodhya
13 Oct 2020
10 Jun 2020
18 Jun 2020
10 Jun 2020
17 Jun 2020
10 Jun 2020
12 Jun 2020
Amount
Providing, laying, spreading of graded stone aggregate (WMM) after mixing with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying with 1% OPC cement and 3.5% Emulsion SS2 Bulk in uniform single layer on sub base/subgrage and compacting withthe road roller at achieve the desire density. (including cost of all material, labour, T&P etc required for proper completion of work also including all taxes but excluding cost of G.S.T.)
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. (including cost of all material, labour, T&P etc required for proper completion of work also including all taxes but excluding cost of G.S.T.)
Providing and laying bituminous concrete with hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous VG-30 binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects (including cost of all material, labour, T&P etc required for proper completion of work also including all taxes but excluding cost of G.S.T.)
Construction of subgrade and earthen shoulders with approved material lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with as per Technical Specification Clause 303.1 (including cost of all material, labour, T&P etc required for proper completion of work also including all taxes but excluding cost of G.S.T.)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .