Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹103.8 CrAdmitted-Finance | ₹103.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹110.3 Cr+₹6.5 Cr (6.25%)Admitted-Finance 32 SAGAR SOCIETY ROAD NO 2 BANJARA HIILS HYDERABAD 500034 TELENGANA | ₹110.3 Cr+₹6.5 Cr (6.25%) | L2 | Admitted-Finance |
| 3 | L2₹110.3 Cr+₹6.5 Cr (6.25%)Admitted-Finance | ₹110.3 Cr+₹6.5 Cr (6.25%) | L2 | Admitted-Finance |
| 4 | L2₹110.3 Cr+₹6.5 Cr (6.25%)Admitted-Finance H NO 1051 60 20 320 3RD FLOOR MANJEERA MAJESTIC KPHB COLONY HYDERABAD 500072 TELANGANA | HYDERABAD | HYDERABAD | TELANGANA | 500072 | ₹110.3 Cr+₹6.5 Cr (6.25%) | L2 | Admitted-Finance |
| 5 | L2₹110.3 Cr+₹6.5 Cr (6.25%)Admitted-Finance 611 VPO JUAN SONIPAT HARYANA 131024 | SONIPAT | SONIPAT | HARYANA | 131024 | ₹110.3 Cr+₹6.5 Cr (6.25%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | RVM Constructions India Private Limited L2 | Credible Engineering Construction Projects Limited L2 | RN INFRA PROJECTS L3 | YOGI CONSTRUCTION CO. L2 | PH ADAI L2 | M/s M.D. Enterprises L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Balance work of Construction of Two-lane with hard shoulders of Merangkong-Tamlu-Mon Road on EPC basis from existing Km 76.640 to Km 98.065 [Design Km. 63.800 to Km. 86.835] (Design length-23.035 km) in the state of Nagaland under SARDP-NE Phase A | 1 | Lumpsum | 1,10,27,05,000 ₹1,10,27,05,000 | 1,10,27,05,000 ₹1,10,27,05,000 | 1,14,65,00,777 ₹1,14,65,00,777 | 1,10,27,05,000 ₹1,10,27,05,000 | 1,10,27,05,000 ₹1,10,27,05,000 | 1,03,78,40,000 ₹1,03,78,40,000 Lowest |
Tender Value
₹129.7 Cr
Closing Date
30 Aug 2021, 11:00 amClosed
A K Jha
National Highways and Infrastructure Development Corporation Ltd. Third Floor, PTI Building, 4 Sansad Marg. New Delhi
Balance work of Construction of Two-lane with hard shoulders of Merangkong-Tamlu-Mon Road on EPC basis from existing Km 76.640 to Km 98.065 (Design Km. 63.800 to Km. 86.835) in the state of Nagaland
2021_NHIDC_642287_1
NHIDCL/Nagaland/Civil Work/MTM/Pkg 4
Open Tender
Civil Works
EPC Contract
2372 days
Nagaland
Please refer Tender documents.
4 documents required · 4 mandatory
₹23,600
MD NHIDCL
Exempted
NHIDCL HQ New Delhi
9 Sept 2021
6 Aug 2021
31 Aug 2021
6 Aug 2021
30 Aug 2021
23 Aug 2021
6 Aug 2021 - 16 Aug 2021
18 Aug 2021
Amount
Balance work of Construction of Two-lane with hard shoulders of Merangkong-Tamlu-Mon Road on EPC basis from existing Km 76.640 to Km 98.065 [Design Km. 63.800 to Km. 86.835] (Design length-23.035 km) in the state of Nagaland under SARDP-NE Phase A
RVM Constructions India Private Limited
Credible Engineering Construction Projects Limited
YOGI CONSTRUCTION CO.
PH ADAI
RN INFRA PROJECTS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
RFP.pdf
Tender Documents • 2.55 MB
DCA.pdf
Tender Documents • 2.57 MB
BOQ_676021.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .