Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 CrAdmitted-Finance | -11.01% | ₹1.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.4 Cr+₹1.6 L (1.17%)Admitted-Finance | -9.97% | ₹1.4 Cr+₹1.6 L (1.17%) | L2 | Admitted-Finance |
| 3 | L3₹1.5 Cr+₹13.5 L (9.66%)Admitted-Finance | -2.41% | ₹1.5 Cr+₹13.5 L (9.66%) | L3 | Admitted-Finance |
| 4 | L4₹1.5 Cr+₹14.4 L (10.3%)Admitted-Finance | -1.84% | ₹1.5 Cr+₹14.4 L (10.3%) | L4 | Admitted-Finance |
| 5 | L5₹1.6 Cr+₹17.2 L (12.4%)Admitted-Finance | -0.01% | ₹1.6 Cr+₹17.2 L (12.4%) | L5 | Admitted-Finance |
Tender Value
₹1.8 Cr
EMD Value
₹3.7 L
Closing Date
8 Aug 2026, 6:00 pmClosed
EXECUTIVE ENGINEER
E.E. GANGNAHAR OFD DIV 1ST CAD SRIVIJAYNAGAR
CONSTRUCTION OF PUCCA WATER COURSE IN CHAK 3 BKW
2026_CECAD_579178_4
SBNR NIT 01/2026-27
Open Tender
Civil Works
Percentage
240 days
3 BKW
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
E.E. GANGNAHAR OFD DIV 1ST CAD SRIVIJAYNAGAR/RISL
₹3.7 L
Yes
1 Sept 2026
30 Jul 2026
10 Aug 2026
30 Jul 2026
8 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CONSTRUCTION OF PUCCA WATER COURSE IN CHAK 3 BKW | |||||
| 1.01 | Earth work excavation in ordinary soil,undressed inclusive of all lift but with combined lead up to 200mtrs Ramming of earth work in layers by wooden iron rammers to obtain 90%of themaximumdry density ordinary soil | 17,730.1 | CUBIC METER | 85 | ₹15,07,058.5 |
| 1.02 | Dressing of Earth Work For all types of earth work new or repair work for all types of soil | 17,730.1 | CUBIC METER | 1.6 | ₹28,368.16 |
| 1.03 | Compaction of earthwork watering, ramming and dressing of sub grade including removal of irregularities upto 15 cm (6) depth | 9,738.38 | SQUARE METER | 9.5 | ₹92,514.61 |
| 1.04 | Brick masonry in foundation and plinth with brick designation 75 in cement sand mortar 1:5 Add extra over item no.6 For using bricks class designation 100 instead of class designation 75 | 1,623.77 | CUBIC METER | 5,389 | ₹87,50,496.53 |
| 1.05 | cement plaster with cement sand mortar (1:4) including racking of joints, smooth finishing and curing etc. Complete including all lead of all construction materials of thickness 10mm thick in one coat | 16,612.53 | SQUARE METER | 196 | ₹32,56,055.88 |
| 1.06 | Earth work excavation in Ordinary soil, undressed inclusive of all lift but with combined lead up to 200 mtrs | 5,439.77 | CUBIC METER | 75 | ₹4,07,982.75 |
| 1.07 | providing and laying cement concrete including curing, compaction etc. complete using stone aggregate 40mm nominal size in foundation plinth, excluding the cost of shutterimg using. CEMENT CONCRETE ( CAST IN SITU) 1 cement :4 sand:8 aggregate mix | 84.72 | CUBIC METER | 4,586 | ₹3,88,525.92 |
| 1.08 | Brick masonry in foundation and plinth with brick designation 75 in cement sand mortar 1:6 Add extra over item no.6 For using bricks class designation 100 instead of class designation 75 | 195.94 | CUBIC METER | 5,289 | ₹10,36,326.66 |
| 1.09 | 8 mm thick cement plaster in cement mortar (1:6) as per design and specification including cost of all materials including mechanical mixing of mortar with all lead and lift and stacking etc complete in all respect | 729.89 | SQUARE METER | 154.4 | ₹1,12,695.02 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.24 MB
BOQ_1029286.xls
BOQ • 0.34 MB
eprocPDF.pdf
Tender Documents • 4.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .