Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.6 LAccepted-AOC 930 NCL BINA PROJECT SONEBHADRA U P | BINA PROJECT | SONEBHADRA | UTTAR PRADESH | 231220 | L1 | Accepted-AOC As per TCR. | |
| 2 | L2₹38.9 L+₹2.8 L (7.85%)Rejected-Finance B5 NPCC COLONY BALIYA NALA JAYANT DISTT SINGRAULI MP 486890 | BALIYA NALA JAYANT | SINGRAULI | MADHYA PRADESH | 486890 | L2 | Rejected-Finance As per TCR | |
| 3 | L3₹58.5 L+₹22.4 L (62.1%)Rejected-Finance DUBEY COMPLEX MAIN ROAD SINGRAULI MADHYA PRADESH | SINGRAULI | SINGRAULI | MADHYA PRADESH | 486889 | L3 | Rejected-Finance As per TCR | |
| 4 | L4₹60.8 L+₹24.7 L (68.3%)Rejected-Finance NH 3 A 145 VINDHYANAGAR SINGRAULI MADHYA PRADESH 486885 | SINGRAULI | MADHYA PRADESH | 486885 | L4 | Rejected-Finance As per TCR |
Tender Value
₹72.2 L
EMD Value
₹90,240
Closing Date
27 Mar 2023, 9:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Staff Officer (EM)
Office of Area General Manager Bina Project NCL U.P. 231220
Dismantling disassembling, re erection, re in-stallation, setting and alignment of assemblies, sub assemblies on as and when required basis within 730 days in CHP Bina Project
2023_NCL_274650_1
B/EM/eTender/2022-23/26 dated 10.03.2023
Open Tender
Electrical and Maintenance Works
Item Rate
730 days
Bina Project
Please refer Tender documents.
4 documents required · 4 mandatory
₹90,240
20 Jul 2023
10 Mar 2023
28 Mar 2023
10 Mar 2023
27 Mar 2023
11 Mar 2023
10 Mar 2023 - 18 Mar 2023
Amount
Dismantling and disassembly of damaged assembly/subassembly, idlers and frames, pulleys and rolling elements, drive units, conveyor take up units etc. on as and when and where basis.
Re-installation, re-erection, setting and alignment, of repaired, new assemblies/ sub-assemblies, idlers & frames, pulleys, rolling elements, drive units, conveyor take-up units etc. on as and when and where basis.
Total impact of GST for the purpose of CTC
BHASKAR ENTERPRISES
R .D. ASSOCIATES
Krishna Engineering Works
stage.html
html • 0.05 MB
technical_284256.pdf
PDF • 0.19 MB
techsummary_284256.pdf
PDF • 9.90 MB
finance_284256.pdf
PDF • 0.02 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_284256.pdf
PDF • 1.51 MB
e-26.pdf
PDF • 4.28 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .