BALKAR
Hisar PHED No. 3
Design, construction, erection, testing and commissioning of 10 MLD Sewage Treatment Plant (STP) along with Intermediate Pumping Stations (IPS) and Rising Mains, including
2026_HRY_507514_1
202608A43171 D844 49EE BF90 3F57EBF76ADB566PUH
Open Tender
Civil Works
Works
547 days
Hisar
As Per DNIT
3 documents required · 3 mandatory
₹20,000
₹70.5 L
Yes
Hisar
13 Mar 2026
10 Mar 2026
1 Apr 2026
10 Mar 2026
1 Apr 2026
10 Mar 2026
18 Mar 2026
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: EE PHED-3 Hisar
DNIT Name : Design, construction, erection, testing and commissioning of 10 MLD Sewage Treatment Plant (STP) along with Intermediate Pumping Stations (IPS) and Rising Mains, including 03 months’ trial run followed by 06 years Defect Liability-cum-Operation and Maintenance Period complete in all respects, along with all other works contingent thereto.
Contract No: 01662-246249
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Description NS Item Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder in Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
1.1 (3 Nos. CI Gear Operated Sluice Gate with SS Spindle (SS 410) and seats (SS 304) (2 Nos. for screen and 1 No. for partition of collecting tank) as per design for proposed MPS. Job Excess(+) Full Conversion INR
1.2 ((2 No. High Mast of 3 mtr GI Octagonal Poe 4mm thickness (T=100mm, Base Plate - 320 x 320 x 20mm ), Window at 500mm from Base Plate with 6 no. LED energy outdoor suitable size reupted make efficient lamps on each pole, including 20 no. LED outdoor lights with GI poles 12.50 Mtr high including all acccessories along the road and path complete in all respect. Job Excess(+) Full Conversion INR
1.3 Supply of DI pipe as per DGSandD Haryana Rate contract. Per Mtr. Excess(+) Full Conversion INR
1.4 )Extra Provision for HD Camera High quality image with 12 MP, 1/2.7`CMOS sensor 12 MP (2880*1620)@25fps: 4MP (2560*1440)@25fps: 3MP (2304*1296) @25fps: 2MP (1920*1080) @30/25fps: Ultra 265, H.265, H.264, MJPEG LightHunter technology ensures ultra-high image quality in low illumination environment 120 dB true WDR technology enables clear image in strong light scene Support 9:16 Corridor Mode Built-in Mic Smart IR, up to 40m (131ft) IR distance Supports 256 G Micro SD card P67, Nos. of Cameras = 4 to 8 Job Excess(+) Full Conversion INR
1.5 ))K9 DI pipe of suitable dia in proposed MPS on in the vicinity of existing 4.00 MLD STP on Kaimiri road including welding and screwing of flanges, ISI marked DI fittings Sluice valve, non return valves as per requirements ene for bye pass arrangements complete in all respect for proposed MPS. Job Excess(+) Full Conversion INR
1.6 ?Supplying erection, testing of fully automatic electric control panel board consisting of MS sheet of thickness 14 gauge duly painted box type floor mounted made of angle Frame containing 1 no. fully automatic air brake starter suitable for Motor of the following capacity, Min switch of suitable range with HRC fuse, 1 no. volt meter (0 to 500 volts), 1 No. Amp. Meter of 0 to 100 amp. 3 sets of indicating lamp capacitor of suitable capacity and 1 no. single phase preventers with the timer switch including wiring in panel board and suitable electric energy meter wiring in Electric Control Panel Board complete in all respect as per specification given in Schedule No. II, Including MCB, suitable, Capacitor, Wooden Box etc as per site requirement complete in all respect. 85.00 HP Motor Each Excess(+) Full Conversion INR
1.7 Construction of HT / LT Panel room, PLC room, Centrifuge house, blower room and Lab cum office building including doors window and fitting with toilet block including sanitary fittings etc. as per drawing attached in DNIT at MPS and STP site covered area with RCC framed structure of brick work vitrified glazed tiles flooring, powder coated aluminium frame of size 100mm x 45mm of 10 gauge for chowkhat frame, 75mm x 45mm of 10 gauge for door frame , 45mm x 45mm of 10 gauge for window frame, 5mm thick glass AIS / Saint Gobin/ Modi Float, covered area 300 sqm excluding operation and Maintenance of 5 years after 12 months defect liablity period and 3 months trail run period. Sqm Excess(+) Full Conversion INR
1.8 Design construction, erection, testing and commissioning of proposed MPS for 10.00 MLD STP in the vicinity of existing 4.00 MLD STP on Kaimiri road and following components excluding O and M for 5 years after one year defect liability period and 3 month trial run period. i) RCC Inlet chamber, Screen Chamber, rectangular collecting tank suitable for 10.00 MLD with peak factor of 2.25 landscaping in the vicinity of existing 4.00 MLD STP on Kaimiri road, providing and installing of 5 nos. Pumping Set of i.e 1 No. 18900LPM (1134 m3/hour), 2 No. 6300 LPM (378 m3/hour) and 2 No. of 3150 LPM (189.00 m3/hour) with 20 mtr Head each with Variable Frequency Drive as per specification of suitable size, LT panel equipped with all safety devices, automatic capacitor bank and submerssible cable from LT panel to pump sets complete in all respect. Job Excess(+) Full Conversion INR
1.9 Supply and installation of 2 nos. Mechanical course screens of minimum length 6 mtr for 10.00 MLD average flow with peak factor of 2.25 i) The connecting Rising main / Sewer of same diameter and material of construction, laid at adequate depth between existing sewers to newly constructed structures is included in this scope of work. ii) All the infrastructure including 1 No. Pump chamber of 9.15 x 4.57 m except Staff quarter /pathways / roads required to be executed at site to make the MPS functional is included in the scope of work for lump sump job. iii) All the pumping machinery, panel board, Level sensor etc. shall be controlled by PLC and SCADA and shall be synchronized with PLC panels at MPS and STP site through broadband internet facility. iv) The size and quantities of all the above components will be as per approved structural / Hydraulic / Mechanical / Electrical design to be approved by Departmental before actual execution of work excluding O and M of 5 years after 12 months defect liability period and 3 months trail run period. Job Excess(+) Full Conversion INR
2.1 SEWAGE TREATMENT PLANT OF 10.00 MLD BASED ON SBR TECHNOLOGY COMPLETE IN ALL RESPECTS. Design construction, erection, testing and commissioning of 10.00 MLD STP respect including Landscaping Construction of HT / LT Panel room all other contigent Electrical, Mechanical, Electromegnetic Flow Measurement Device on inlet and outlet Real time water quantity Monitoring with data collection sysem (analyzer) Piping and Instrumentation works with PLC and SCADA. Arrangement for STP along with Synchronizing it with each other including furniture and laboratory equipment including tertiary treatment as pe detail given in the bid document and excluding following components including OandM of 5 years after 12 months defect liability period and 3 months trail run period. Job Excess(+) Full Conversion INR
2.2 Supplying, erection, testing and commissioning of submersible motor pumping set non clog for sewerage having head 20.00 m as per the indicated requirements of discharge in LPM and power capacity in BHP as per IS marked including all accessories (like SS Pipes, SS Chain (Shackle Chain) ,SS Foundation Bolt, complete base frame, Monorail, Chain Guide Line, Auto Compiling, Duct Foot Bend (D/F Bend) etc. complete in all respect. 6600 LPM x 20 Mtr. Head (50 HP) Job Excess(+) Full Conversion INR
2.3 ONLINE OUTLET EFFLUENT WATER QUALITY MONITORING SYSTEM FOR BOD, COD, TSS, PH Supply erection, testing amd commisioning operation and comprehensive annual maintenance of effluent quality monitoring system at 10.00 MLD STP for online (Continous) measurement of PH, Total Suspended Solids (TSS), Chemical Oxygen Demand (COD), Biological Oxygen Demand (BOD) by single analyzer with various sensors (spectral measurement in the UV-VIS range 200-720mm) performing reagent and chemical free analysis with automatic cleaning of censor signal cables and power cable, local data acquistion and display of data on continous basis for up linking the data in CPCB, HSPCB and PHED, TUV approved complete in all respect as per Central Pollution Control Board (CPCB) guideline for online continous monitoring system for effluent and as contained in scope of work including operation and Mainenance of 5 years after 12 months defect liability period and 3 months trail run period. Multi-parameter measuring converter, for connecting upto 18 intelligent sensors scope including 8 analog inputs / Outputs (4inputs and 4 outputs ) o/4-20 Ma), wide range power supply optical COD / BOD and TSS probe with spectral processing of the UV- VIS range for measurement in the outlet / effluent of plant of 10.00 MLD STP in the vicinity of existing 4.00 MLD STP on Kaimiri road with integrated with automatic cleaning.Robust digital pH/ ORP sensor for pH / ORP electrodes, with built in pre-amplifier and temperature sensor with Automatic Temperature compensation (ATC) Cable length 100 Meter (minimum)Sensor adapter cable for all intelligent sensors with IP68 water proof connection to intelligent sensorsnet system Cable length 100 Meter (minimum) Data Transfer to CPCB, HSPCB and PHED Servers during 6 year of O and M after commissioning after 3 months trial period (incluiding 1 year of defect liability period) Providing GSM 5G, 4G Modem with mobile network connectivity including network charges for operation and Maintenance of 5 years after 12 months defect liability period and 3 months trail run period.Providing GSM 5G, 4G Modem with mobile network connectivity excluding network charges for operation and Maintenance of 5 years after 12 months defect liability period and 3 months trail run period. Job Excess(+) Full Conversion INR
2.4 CCTV CAMERA Providing and installing 6 CCTV Cameras - 4 Cameras for STP and 2 Camera for MPS complete as per satisfaction of the Engineer - in - charge along with 90 days recording (DVR), 32 inch LED Screen, 16 Channel DVR at STP siteand 8 Channel DVR at MPS site with connectors cables, poles and power supply with online real time output facility. The cameras at both the sites i.e MPS and STP shall be synchronized at STP site. At STP and MPS Site 1 No. PTZ speed dome 360 degree 50x zoom camera 3 no. 12mm lens size 1 no. 36mm size Make - CP Plus Internet protocol minimum 5 MP WDR, Night vision colour mode 2.4.2 12mm very focal with extra IR CCTV Cameras should be installed and commissioned before starting execution of work excluding operation and Maintenance of 5 years after 12 months defect liability period and 3 months trail run period Job Excess(+) Full Conversion INR
2.5 Supplying, erection, testing and commissioning of submersible motor pumping set non clog for sewerage having head 25.00 m as per the indicated requirements of discharge in LPM and power capacity in BHP as per IS marked including all accessories (like SS Pipes, SS Chain (Shackle Chain) ,SS Foundation Bolt, complete base frame, Monorail, Chain Guide Line, Auto Compiling, Duct Foot Bend (D/F Bend) etc. complete in all respect. 7200 LPM x 25 Mtr. Head (70 HP). Job Excess(+) Full Conversion INR
2.6 Supplying, erection, testing and commissioning of submersible motor pumping set non clog for sewerage having head 25.00 m as per the indicated requirements of discharge in LPM and power capacity in BHP as per IS marked including all accessories (like SS Pipes, SS Chain (Shackle Chain) ,SS Foundation Bolt, complete base frame, Monorail, Chain Guide Line, Electric Cable From Submersible Pump to Panel Room , Auto Compiling, Duct Foot Bend (D/F Bend) , Digital Pump Controller ( Water Level sensor ) etc. complete in all respect.4800 LPM x 25 M Head (50HP) Job Excess(+) Full Conversion INR
2.7 Supplying, erection, testing and commissioning of submersible motor pumping set non clog for sewerage having head 25.00 m as per the indicated requirements of discharge in LPM and power capacity in BHP as per IS marked including all accessories (like SS Pipes, SS Chain (Shackle Chain) ,SS Foundation Bolt, complete base frame, Monorail, Chain Guide Line, Electric Cable From Submersible Pump to Panel Room , Auto Compiling, Duct Foot Bend (D/F Bend) , Digital Pump Conroler ( Water Level sensor ) etc. complete in all respect.8700 LPM , 85 BHP Job Excess(+) Full Conversion INR
2.8 Supplying, erection, testing and commissioning of submersible motor pumping set non clog for sewerage having head 25.00 m as per the indicated requirements of discharge in LPM and power capacity in BHP as per IS marked including all accessories (like SS Pipes, SS Chain (Shackle Chain) ,SS Foundation Bolt, complete base frame, Monorail, Chain Guide Line, Electric Cable From Submersible Pump to Panel Room , Auto Compiling, Duct Foot Bend (D/F Bend) , Digital Pump Controller ( Water Level sensor ) etc. complete in all respect.5800 LPM , 55 BHP Job Excess(+) Full Conversion INR
2.9 Supplying erection, testing of fully automatic electric control panel board consisting of MS sheet of thickness 14 gauge duly painted box type floor mounted made of angle Frame containing 1 no. fully automatic air brake starter suitable for Motor of the following capacity, Min switch of suitable range with HRC fuse, 1 no. volt meter (0 to 500 volts), 1 No. Amp. Meter of 0 to 100 amp. 3 sets of indicating lamp capacitor of suitable capacity and 1 no. single phase preventers with the timer switch including wiring in panel board and suitable electric energy meter wiring in Electric Control Panel Board complete in all respect as per specification given in Schedule No. II, Including MCB, suitable, Capacitor, Wooden Box etc as per site requirement complete in all respect. 85.00 HP Motor Each Excess(+) Full Conversion INR
3.1 Operation and Maintenance of the complete scope of work covered under this DNIT, i.e. 10.00 MLD Sewage Treatment Plant (STP), 02 Nos. Intermediate Pumping Stations (IPS), Rising Main, Main Pumping Station (MPS), flow meters, analyzers, including deployment of requisite manpower, supply and consumption of all chemicals such as chlorine, polymer, etc., and upkeep of all electrical, mechanical, instrumentation, horticulture, and civil components/structures, for a period comprising 03 months of successful trial run, 03 years Defect Liability Period (DLP) , and a further period of 03 years thereafter DLP. **The cost of Operation and Maintenance Period, including the Defect Liability Period (DLP) , shall not be less than 20% of the estimated cost of the work. Job Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: EE PHED-3 Hisar
DNIT Name : Design, construction, erection, testing and commissioning of 10 MLD Sewage Treatment Plant (STP) along with Intermediate Pumping Stations (IPS) and Rising Mains, including 03 months’ trial run followed by 06 years Defect Liability-cum-Operation and Maintenance Period complete in all respects, along with all other works contingent thereto.
Contract No: 01662-246249
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Description Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
1 Item Description BI01010001010000000000000515BI0100001112
1.01 HSR Items for DNIT Name : :Design, construction, erection, testing and commissioning of 10 MLD Sewage Treatment Plant (STP) along with Intermediate Pumping Stations (IPS) and Rising Mains, including 03 months’ trial run followed by 06 years Defect Liability-cum-Operation and Maintenance Period complete in all respects, along with all other works contingent thereto. BI01010001010000000000000515BI0100001113 Nos 176130197.21 Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.70 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.34 MB
BOQ_586273.xls
BOQ • 0.29 MB
2I0V48Z150214.pdf
Additional Documents • 10.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .